An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPS LS1Planning meeting (No.35)30/04/14 David Mcfarlane SPS.Technical-Coordination@Cern.ch

  2. Topics • Note de Coupure • Lifts and Monte-charges. • Dates for changing the alarm systems in the lifts. • Bank holidays. • AUG tests. • GE/ASE Access tests. • Cleaning campaign dates. • Main works in each of the points. • EPC tests of the Auxiliary Converters. • The end of LS1. • Planning. • False floors open in the BAs. • E.C.Rs. • Access rights and safety equipment. • Important Information. • A.O.B. SPS.Technical-Coordination@Cern.ch

  3. SPS.Technical-Coordination@Cern.ch

  4. Lift Maintenance Mar/Apr/May/ June SPS.Technical-Coordination@Cern.ch

  5. Changing alarm system in the lifts(The lift will be out of service for the entire day) • BA2 – Tuesday the 13th May • BA3 – Tuesday the 22nd April • BA4 – Friday the 16th May • BA5 – Wednesday the 14th May • BB5 – Thursday the 15th May • BA6 – Wednesday the 23rd April • BA7 – Friday the 25th April • BA80 – Thursday the 24th April • TT70 – Wednesday the 7th May Although the lift is out of service the Zone is NOT closed! SPS.Technical-Coordination@Cern.ch

  6. Bank holidays(CERN is closed and no access into SPS) • Thursday the 1st May. (Labour Day) • Thursday the 29th May. (Ascension Day) • Monday the 9th June. (Whit Monday) SPS.Technical-Coordination@Cern.ch

  7. GSM intervention SPS Sunrise needs to intervene on the 2G/3G BTSs feeding SPS points 1,2,5 and 7 in order to improve the system redundancy and perform some electrical maintenance in their UPS (the BTSs are on the surface). There could be from 30 minutes to 1 hour downtime per site. Mobile communications (GSM and 3G) in the site where the intervention is ongoing will be down (tunnel and surface). The access and TETRA systems won’t be affected. They plan to do this work next week (week19) between 12:00 and 14:00. SPS.Technical-Coordination@Cern.ch

  8. AUG tests SPS.Technical-Coordination@Cern.ch

  9. GE/ASE Access tests SPS.Technical-Coordination@Cern.ch

  10. Cleaning campaign SPS.Technical-Coordination@Cern.ch

  11. BA1 main works • Finish the works in TT10 • Mainly Alignment and Vacuum. • Reinstallation of the beam line and equipment in LSS1 • https://edms.cern.ch/file/1293491/5.0/LSS1_planning_sven_v5.11.mpp • GE/ASE Access tests • 23rd June SPS.Technical-Coordination@Cern.ch

  12. BA2 main works • Re-alignment of BPCE 21806. • Discussion after this meeting • EN/EL cabling campaign • Ongoing until the end of April • Changing alarm system in the lift • Tuesday the 13thMay • AUG tests • 14th May • GE/ASE Access tests • 9th June • EPC tests (Aux converters) Ring/NCODS • 2nd to the 6th June • Cleaning campaign • 23rd to the 27th June SPS.Technical-Coordination@Cern.ch

  13. BA3 main works • New cable trench to be built between CCC and BA3 (surface) • Still waiting for the revised quote. • Fibre opticworks in the pit area • 22nd April to the 20th May • AUG tests • 15th May • GE/ASE Access tests • 10th June • Cleaning campaign • 16th to the 20th June SPS.Technical-Coordination@Cern.ch

  14. BA4 main works • Installation of 2 pumps for crab cavities • Pumps installed. • Vacuum chamber can be re-installed • Install new patch panel (next week) • Cleaning campaign • 12th to the 16thMay • Changing alarm system in the lift • 16th May • AUG tests • 19thMay • EPC tests (Aux converters) Ring/NCODS • 9th to the 13th June • GE/ASE Access tests • 10thand 11th June SPS.Technical-Coordination@Cern.ch

  15. BA5 main works • Re-installation of 4 coated magnets due to vacuum leaks. • Foreseen for next week (week 19) • Transport willbemoving all of the equipementstored in ECX5 back to LSS1 (via BA6) • Starting on Monday the 7th April. • THEY HAVE PRIORITY IN THIS AREA!!! • Changing alarm system in the lift • 14th and 15th May • BE/BI works. • To becompleted on the 19th May • AUG tests • 20thMay • GE/ASE Access tests • 12thJune • Cleaning campaign • 19thto the 23rdMay • EPC tests (Aux converters) Ring/NCODS • 25th to the 27th June SPS.Technical-Coordination@Cern.ch

  16. BA6 main works • ATLAS works on cooling towers (BA6 water OFFLINE) • 22nd April to the 13th May. • AUG tests • 21st May • Cleaning campaign • 26th to the 30th May • GE/ASE Access tests • 13th June • EPC tests (Aux converters) Ring/NCODS • 16th to the 24th June SPS.Technical-Coordination@Cern.ch

  17. EPC tests of the Auxiliary Converters • With this planning, OP can start the commissioning of the Software with a 1 week delay from our activities: e.g, OP tests for BA2 could start on 9th June.    • Whatweneed: • The magnet interlocks shall be tested in May by MPE (R.Mompo/P.Dahlen): support from EPC is requested during this period, • Services shall be present in each BA in time: water (magnet + surface building), no consignation (except BA1 until end of June), • A general signalisation that some tests are ongoing: coordination EPC/MSC, • EIS (https://edms.cern.ch/document/991272): from past experiences, this is a difficult point for us during our tests, especially for TI2/TI8. I propose that when the planning is agreed on, Marc Tavlet will be contacted by EPC. SPS.Technical-Coordination@Cern.ch

  18. The end of LS1 SPS.Technical-Coordination@Cern.ch

  19. Planning SPS.Technical-Coordination@Cern.ch

  20. SPS.Technical-Coordination@Cern.ch

  21. SPS.Technical-Coordination@Cern.ch

  22. SPS.Technical-Coordination@Cern.ch

  23. SPS.Technical-Coordination@Cern.ch

  24. SPS.Technical-Coordination@Cern.ch

  25. SPS.Technical-Coordination@Cern.ch

  26. SPS.Technical-Coordination@Cern.ch

  27. False floors lifted in Surface BAs • Below is a table showing the dates that EL will be pulling cables at each point of the SPS. • During these periods large sections of the false floor in these surface buildings will be lifted. • Any works in the BA’s that involve lifting of the false floors MUST be reported to the Coordination team • If you require access to racks or other equipment in the surface buildings during these periods you must check with planning first. SPS.Technical-Coordination@Cern.ch

  28. Engineering Change Requests • Any and all new equipment being installed in the SPS requires an ECR BEFORE it can be installed. It must also be approved by planning and coordination. • Templates and Guidelines for Engineering Change Requests: • EDMS: 1271880 • SPS ECR template (in DFS): • https://dfsweb.web.cern.ch/dfsweb/Services/DFS/DFSBrowser.aspx/Applications/CERN/Workgroup%20Templates/SPS/ECR-Template-SPS.dotx SPS.Technical-Coordination@Cern.ch

  29. Current ECR’s for LS1 https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3 • Removal of AEWB Pick-up from position 31932 to 31502 • (EDMS No. 1245361) UNDER IMPLEMENTATION • Removal of a BPWA Pick-up from position 31931 to 31101 • (EDMS No. 1245393) UNDER IMPLEMENTATION • Installation of a new Wideband Kickers system in position 32173 • (EDMS No. 1245400)RELEASED • Installation of a new HBW Damper Pick-up in place of BPWA 31931 & AEWB 31932 • (EDMS No. 1245401)RELEASED • Replacement of 4 old BPA and 2 BPD by 6 BPCE in LSS1 & LSS2 • (EDMS No. 1246559)RELEASED • Reinstallation of pump and gauges (Pirani + Penning) in 11993 (vacuum sector 150) • (EDMS No. 1249305)RELEASED • Modification LSS1 sectorization (new VVSF + displacement VVSB 11772) • (EDMS No. 1249307 v.2) RELEASED • Installation of 3 BCT in LSS5 for North Area protection during Ions operations in SPS. • (EDMS No. 1075945) UNDER IMPLEMENTATION SPS.Technical-Coordination@Cern.ch

  30. Current ECR’s for LS1 https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3 • Transfer of the Fast Beam Current Transformers (BCTFR.31451) for the SPS circulating beam from LSS3 to LSS5. • (EDMS No. 1221341) RELEASED • SPS Beam Position Monitoring Prototyping Setup in LSS4. • (EDMS No. 1099630)RELEASED • Installation de 4 moniteurs de position (2 BPH, 2 BPV), dédiés au système Damper. • (EDMS No. 1251693)RELEASED • Installation de 2 nouveaux moniteurs de position de type BPCR en LSS2 au 21459 et 22172. • (EDMS No. 1251695) RELEASED • Displacement of Door PPG2145 separating the LHC and the SPS in the TI2 tunnel. • (EDMS No. 1253832) UNDER IMPLEMENTATION • Interlocking of Injection Tunnel upstream areas with LHC powering. • (EDMS No. 1257949)RELEASED • Move of BPH.31998 to BPH.42173. • (EDMS No. 1272718) RELEASED • Optical Fibre Racks. • (EDMS No. 1273766)UNDER IMPLEMENTATION SPS.Technical-Coordination@Cern.ch

  31. Current ECR’s for LS1 https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3 • Removal of old fixed TMP vacuum groups in 11655-11691. • (EDMS No.1273232)RELEASED • BYBPM racks under the SPS dipole magnets as part of the Upgrade of Beam Position Monitors electronics (MOPOS). • (EDMS No. 1282651) UNDER IMPLEMENTATION • Installation de Coffrets d'Alimentation en LSS1 et TT10. • (EDMS No. 1282860) UNDER IMPLEMENTATION • Installation d'un rack de jonction RX11695=TS1 au BA1, afin de limiter les longueurs des câbles à changer lors d'un futur remplacement. • (EDMS No. 1288607)UNDER IMPLEMENTATION • Installation de nouveaux chemins de câbles en LSS1+ du SPS. • (EDMS No. 1291889 v.2) RELEASED • TPSN replacement in LSS2 of SPS. • (EDMS No. 1302672 v.1) UNDER IMPLEMENTATION • Replacement of pumps in 3 tanks MKP in LSS1 of the SPS . • (EDMS No. 1328248 v. 0.1)RELEASED • Suppression of VVFA 11899 in LSS1 of SPS. • (EDMS No. 1328249v. 0.1) RELEASED SPS.Technical-Coordination@Cern.ch

  32. Current ECR’s for LS1 https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3 • New shielding wall behind TIDV 11892 in SPS . • (EDMS No. 1331621v. 0.1)RELEASED • Modification of Numbering of SPS Civil Works. • (EDMS No. 1346653v. 0.1)RELEASED • New Cable Tray in LSS5- of SPS. • (EDMS No. 1346655v. 0.1)UNDER IMPLEMENTATION • Helium 2K Pumping Units Installation in the Alcove Region of SPS Point 4 (BA4). • (EDMS No. 1354826v. 1.0)UNDER IMPLEMENTATION • Installation of a wire scanner BWSRE in LSS5 of the SPS. • (EDMS No. 1356736v. 0.1)RELEASED • Increase of the MDHD 11832 steering strength for the LIU-SPS Q20 optics. • (EDMS No. 1359692v. 0.1)UNDER APPROVAL • Modification of 2 Shielding Towers in LSS5 of the SPS. • (EDMS No. 1360306v. 0.1)RELEASED • Upgrade of the UA9 equipment during LS1. • (EDMS No. 1365265v. 0.1) UNDER APPROVAL • Removal of a BCT in TT10 during LS1. • (EDMS No. 1368378v. 0.1)RELEASED SPS.Technical-Coordination@Cern.ch

  33. Access rights and safety equipment • Everyone who enters the SPS MUST have the following: • Completed the correct courses. (sir.cern.ch) • Safety course levels 1, 2 and 3. or CERN Safety Introduction • Safety during LS1 • HabilitationElectrique. • Electrical Safety Awareness • Radiological Protection. (RP Training for CERN Supervised Radiation Areas) • Self Rescue Mask Training. • The correct access authorisation (via EDH). • Zone Code “SPS” for access into the SPS • Zone Code “NA_TARG” for access into BA80 • Zone Code “TAG41 - AWAKE (ex-CNGS) (TAG41)” for access into the old CNGS areas • Zone Code “SPS-KN-000” for “AutorisationconduiteRTL” • Zone Code “SPS-KN-001” for “SPS Shutdown Padlock” • A valid approved IMPACT. (with their name included on this IMPACT) • They must know the number of this IMPACT. • Safety shoes. • Biocell. • Electronic dosimetre. • Passive dosimetre. • All contractors must all have a company passive dosimetre!!! • Helmet plus Light. • Please note that personnel are not allowed to work in the tunnel alone!! SPS.Technical-Coordination@Cern.ch

  34. Important information • Useful Contact Numbers • SPS Coordination Team • David MCFARLANE- 164247 • Franck BAIS – 165467 • James RIDEWOOD - 160590 • Control Room • SPS CCC – 77500 • TI CCC – 72201 • CSA - 62511 • RP • Christophe Tromel – 163199 • Angelito Herve – 163168 • Nadine Conan (BA1) – 160641 • Elodie Aubert - 169097 • Kurt Weiss (BA1) -160759 • Coordination Safety • Emmanuel Paulat – 163870 • John Etheridge - 164647 SPS.Technical-Coordination@Cern.ch

  35. A.O.B. • Please make sure you fill out your IMPACTS correctly!!!! And in plenty of time!!!!!! • The intervention period is “LS1-SPS” Do not put “OPERATION 2013” or leave it blank as no one will sign it. • With the exception of BA80, no IMPACT should have an end date after the 27th June 2014 • Do not just put SPS for you location. Be more specific! • There are currently 45IMPACTs that are “LATE”. If you have completed your work then you need to close the related IMPACT. • If you have ANY concerns about not being complete before the 27th June 2014. I need to know about it NOW!!!! • Its very important to ensure that you leave the work site clean and tidy and that you put any rubbish in the correct bins. SPS.Technical-Coordination@Cern.ch

  36. Déchets mis en bout du TA au BA4 Recherche propriétaire pour le remercier ! Sac contenant de l’eau SPS.Technical-Coordination@Cern.ch

  37. Bacs vus aux BAs 1 et 2 A qui et à quoi servent ces bacs ? SPS.Technical-Coordination@Cern.ch

  38. Bonjour David, Peux-tuSTP rajoutercette photo pour la réunion de cet après-midi. Je voudraisconnaître le propriétaire. Mercid'avance, Christophe BA3 SPS.Technical-Coordination@Cern.ch

  39. ONLY 8 WEEKS LEFT!!!! SPS.Technical-Coordination@Cern.ch

  40. SPS coordination website http://sps.web.cern.ch/SPS/ http://cern.ch/LS1planning \\cernhomeJ.cern.ch\J\jocksoft\Public\LS1 Next meeting 14/05/2014 112-R-028 14:00 Hrs SPS.Technical-Coordination@Cern.ch