Tugas Kelompok I CEC 611 Kelas B Semester Genap 2011/2012 Dosen : Prof.Madya Sri Atmaja P. Rosyidi , Ph.D. Periode Tugas : 23 Mei 2012 – 20 Juni 2012. Tugas. Buatlah laporan ( resume report ) mengenai “ Hongkong Airport Project Construction”, dari link video berikut ini :

Download Presentation

Periode Tugas : 23 Mei 2012 – 20 Juni 2012

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Periode tugas 23 mei 2012 20 juni 2012

TugasKelompok ICEC 611 Kelas BSemester Genap2011/2012Dosen:Prof.Madya Sri Atmaja P. Rosyidi, Ph.D.

PeriodeTugas:

23 Mei 2012 – 20 Juni 2012


Tugas

Tugas

  • Buatlahlaporan (resume report) mengenai “Hongkong Airport Project Construction”, dari link video berikutini:

    • Video 1: http://www.youtube.com/watch?v=1cIlTc5DS8k

    • Video 2: http://www.youtube.com/watch?v=Yr3RGByg_A4

    • Video 3: http://www.youtube.com/watch?v=yCX3ITDV6M8&feature=relmfu

    • Video 4: http://www.youtube.com/watch?v=xlq4dVKHjy8&feature=relmfu

    • Video 5: http://www.youtube.com/watch?v=QuQbXjOjFec&feature=relmfu


Ketentuan tugas

KetentuanTugas

  • Setiapkelompokbolehmengambilsatubagianulasan/topikdaribeberapabagianpembangunan HK airport. Misalnya:

    • Latarbelakang HK Airport

    • Pembangunan SistemTransportasiPenghubung (Ground Access)

    • Pembangunan airport (geotech.)

    • Pembangunan saranaprasarana,

    • Dlsb.


Ketentuan tugas 2

KetentuanTugas 2

  • Masing-masingkelompokharusmengambiltopiktugas yang berbeda.

  • Setiapkelompokterdiridari 5 mahasiswa.


Ketentuan tugas1

KetentuanTugas

  • Dikumpulkanpadatanggal 20 Juni 2012, Jam 11.00 diRuang TU.

  • Format tugas:

    • Diketikdalamkertas A4, 70 gr.

    • Maksimal 15 halaman.

    • Margin: Top 3 cm, 2.5 cm Left, 2 cm Right, 2.5 Below.

    • Cover: Binding (Jilid) sederhanadandiberikan cover warnabirumuda.

    • Template laporan resume akandiuploaddalam website.

    • Bolehmengambilreferensidiluar video.