Engineering standards working group annual meeting
Download
1 / 3

Engineering Standards Working Group Annual Meeting - PowerPoint PPT Presentation


  • 110 Views
  • Uploaded on

Engineering Standards Working Group Annual Meeting. June 24-26, 2002 Las Vegas, NV Dale Hatcher Piping Engineering Manager Coordinator Engineering Technical Specifications Update Team BWXT Y-12 L.L.C. Site Update.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Engineering Standards Working Group Annual Meeting' - damian-house


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Engineering standards working group annual meeting

Engineering Standards Working GroupAnnual Meeting

June 24-26, 2002

Las Vegas, NV

Dale Hatcher

Piping Engineering Manager

Coordinator Engineering Technical

Specifications Update Team

BWXT Y-12 L.L.C.


Site update
Site Update

  • Strategic Plan - What we want Y-12 to be in 20 years (Reduced Production Footprint)

  • Restart - Vital Production Processes - EUO, DUO, Product Certification

  • Modernization Programs

  • Infrastructure Reduction - Reducing the Footprint (by 500,00 ft2 by end of FY-02)

    - Completed: 36 structures (small structures)

    - FY-02: 51 structures (25 buildings to be demolished)

    - FY-03: 57 structures

    - FY-04: 23 structures


Site update continued
Site Update (continued)

  • HEU Materials Facility - CD-1 Approved: Title 1 scheduled start July 2002

  • Special Materials Complex (SMC) - CD-1 Approved - AE Pro2Serve (formally Lockwood Greene)

  • Utilities Infrastructure Modernization Program

    - CD-0 expected this FY

    - Preconceptual studies in progress

    1. Steam Plant replacement

    2. Production Utilities Project (Air Systems, Potable Water, Cooling

    Tower, distribution)


ad