Wed dec 7
This presentation is the property of its rightful owner.
Sponsored Links
1 / 67

Wed Dec 7 PowerPoint PPT Presentation


  • 55 Views
  • Uploaded on
  • Presentation posted in: General

Wed Dec 7. Availability of Services:. ECAL. CMX. ZEC. CSC RE. DT+ RB. TK FPIX. Survey. HCAL. TE-VSC. EN Dept. GS Dept. Beam Stopped at 18:00. TX54. CP. SL. Thu Dec 8. Availability of Services:. ECAL. CMX. ZEC. CSC RE. DT+ RB. TK FPIX. Survey. HCAL. TE-VSC. EN Dept.

Download Presentation

Wed Dec 7

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Wed dec 7

Wed Dec 7

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Beam Stopped at 18:00

TX54

CP

SL

[email protected]


Thu dec 8

Thu Dec 8

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Magnet ramp down initiated at 06:00

Request to take data at 0B

EE 1h

4. EN-HE: Restart Crane

Eric + 2Altead 1h WP:

3. Open PX56 Plug

JP 20’ WP:

6. CV Switch ventilation to shutdown mode

G DucretWP:

2. Open VAC shielding

8:00 Maf + 3 FSU 1h WP:

7’. Lower 2 CPs + 1SL

E Dugue 3h WP:

7. Install collar switchboards

Silverio 20’ WP:

0. Full RP sweep

Heinz + 3RPEs 10:30am 2h WP:

8. Check HF jacks

Hubert /Silverio2h WP:

5. Prepare GIS

14:00Gerhard 8h WP:

1. Take RP water/C6F14 samples

Heinz + CV/DC 2h WP:

Install SU brackets

Antje 5h WP:

TX54

CP

SL

[email protected]


Fri dec 9

Fri Dec 9

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Start of Water cooling maintenance: 08:00

Disconnect –Z fibre optical sensors

Salvatore 1h WP:

2. Remove shims between collar and RS+Z

Dmitry + 2 Russian Tecs 1h WP:

3. Open RS+Z

Pascal /Sandro 30’ WP:

A. Remove shims between collar and RS-Z

Dmitry + 2 Russian Tecs 1h WP:

3’. RP sweep inside RS+Z Area

Angelito 1h WP:

1. Inject Ne

8:00 Gerhard 8h WP:

B. Open RS-Z

Pascal /Sandro 30’ WP: 014

4. Remove CCTRXP & CCHFPP position sensors

Joao + Alex 15’ WP:

C. Remove 4 X-Stops and Open Collar-Z

Dmitry/Alex 2h WP:

5. Remove 4 X-Stops and Open +Z Collar

Dmitry/Alex/Maf2h WP:

C’. RP sweep inside RS-Z

Wolfram1h WP:

6. Remove HF+Z X stop (with CP)

Maf + 2 Russian tecs1.5h WP:

D. Remove HF X stop (with CP)

Maf + 2 Russian tecs1.5h WP: 017

Survey Cavern floor

Antje 3h WP:

TX54

CP

SL

[email protected]


Mon dec 12

Mon Dec 12

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

AUG tests – CMS underground Facility OFF LIMITS

TX54

CP

SL

[email protected]


Tue dec 13

Tue Dec 13

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Diesel Test

A. Move HF-Z away from IP

Maf/Sandro + 1 VSC + 2 Rtecs10’ WP:

1. Move HF+Z away from IP

Maf/Sandro + 1 VSC + 2 Rtecs10’ WP:

B. Disconnect T1 services

Nicola 2h WP:

2. Disconnect T1 services

Nicola 2h WP:

C. Open HF- + flooring

Maf/Sandro/Alex + 1VSC1h WP:

3. Open HF + flooring

Maf/Sandro/Alex + 1VSC 1h WP:

D. Release CASTOR services

Dmitry 1h WP: 020

4. RP sweep inside HF+

2 RPE 20’ WP:

D’. RP sweep inside HF-

2 RPE 20’ WP: 001

5. Open T2 & BSC

Dmitry /Alex 30’ WP:

E. Remove CRP proximity sensors

Joao 10’ WP: A5

6. Survey BP @ 15m

Antje + 1VSC 3h WP:

F. Open CASTOR

Dmitry /Alx30’ WP: 021

6’. RemoveCTZPproximity sensors

Joao 10’ WP:

G. Open T2 & BSC

Nicola /Alex 30’ WP: 025

H. Remove HF X stop (with CP)

Maf + 2 Russian tecs1.5h WP:

TX54

CP

SL

[email protected]


Wed dec 14

Wed Dec 14

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

1. Release BP support @ 13.5m

2VSC + Sandro 2h WP:

A. Survey BP @ 15m

Antje + 1VSC 3h WP:022

2. Block BP support @ 13.5m in parking position

2VSC + Sandro 30’ WP:

A’. RemoveCTZPproximity sensors

Joao 10’ WP: #

3. Remove proximity sensors

30’ WP: #

B. Perform CASTOR removal

Dmitry 7h WP:

4. Remove access gangway to HF+Z

Eric + 2Altead 1h WP: 026

C. Perform ½ CASTOR Installation-removal

Exercise at BP level

Dmitry 1h WP:

5. EN-HE – Remove HF+ I beams

Eric + 3 Altead 2h WP:027

6. Remove HF+Z towers reinforcement

Marc /Herve + 2RTecs 3h WP: 028

7. Lower HF on 3 risers

Marc/Herve + 2 Rtecs 4h WP: 029

8. EN-HE – lift up 1 riser

Eric + 2Altead 2h WP:030

TX54

CP

SL

[email protected]


Thu dec 15

Thu Dec 15

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Survey link Cavern-Su galleries

Antje Andreas 8h WP:

A. Release BP support @ 13.5m

2VSC + Sandro 2h WP:

B. Block BP support @ 13.5m in parking position

2VSC + Sandro 30’ WP:

C. Remove proximity sensors

30’ WP: #

D. Remove access gangway to HF-Z

Eric + 2Altead 1h WP: 026

0. Lower HF on 2 risers

Marc/Herve + 2 Rtecs 4h WP: 029

1. EN-HE – lift up 1 riser

Eric + 2Altead 2h WP:030

E. EN-HE – Remove HF- I beams

Eric + 3 Altead 2h WP:027

2. Install tooling for extension beam

Sandro + 2Vac 5h WP: 031

F. Remove HF- towers reinforcement

Marc /Herve + 2RTecs 3h WP: 028

3. Install extension beam on FIN

3VSC + Sandro + 2 Altead 3h WP:032

G. Lower HF on 2 risers

Marc/Herve + 2 Rtecs 4h WP: 029

H. EN-HE – lift up risers

Eric + 2Altead 2h WP:030

TX54

CP

SL

[email protected]


Fri dec 16

Fri Dec 16

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

A. Install supports for COLLAR table

Maf : 30’ WP:

B. Move collar table out by 60cm

Dmitry+ 2FSU 2h WP:

C. Install tooling for extension beam

Sandro + 2Vac 5h WP: 031

0. Survey TAS + Fwd BP

4h

D. Install extension beam on FIN

3VSC + Sandro + 2 Altead 3h WP:032

Perform load transfer on Ext beam

3VSC + Sandro + 1Altead 5h WP:

1’. Survey BP

Andre + 1VSC 5h WP:

2. Remove HF handrail on IP side

Maf + 2FSU 1h WP:

Remove green support beams

TX54

CP

SL

[email protected]


Mon dec 19

Mon Dec 19

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Start of crane installation in CV room

a Survey TAS + Fwd BP

4h

1. Lower HF+Z on floor

Marc/Herve + 2 Rtecs 4h WP:

b. Perform load transfer on Ext beam

3VSC + Sandro + 1Altead 5h WP:034

2. EN-HE – lift up risers

Eric + 2Altead 2h WP:

b’. Survey BP

Andre + 1VSC 5h WP:035

3. Move HF+Z in garage

Pascal + 2 Rtecs 4h WP:

c. Remove HF handrail on IP side

Maf + 2FSU 1h WP: 216

d. Move collar table in by 60cm + remove supports

Maf + 2FSU 2h WP: 216

TX54

CP

SL

[email protected]


Tue dec 20

Tue Dec 20

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

1. Lower HF-Z on floor

Marc/Herve + 2 Rtecs 4h WP:

2. EN-HE – lift up risers

Eric + 2Altead 2h WP:

3. Move HF-Z in garage

Pascal + 2 Rtecs 4h WP:

Remove 1/2 BSC

A Bell 4h WP:

TX54

CP

SL

[email protected]


Wed dec 21

Wed Dec 21

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Erect scaffolding for BP bake-out

Erect scaffolding for BP bake-out

Remove 1/2 BSC + install new one

A Bell 4h WP:

TX54

CP

SL

[email protected]


Thu dec 22

Thu Dec 22

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Erect scaffolding for BP bakeout

Erect scaffolding for BP bakeout

TX54

CP

SL

[email protected]


Fri dec 23

Fri Dec 23

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Mon dec 26

Mon Dec 26

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Tue dec 27

Tue Dec 27

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Wed dec 28

Wed Dec 28

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Thu dec 29

Thu Dec 29

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Fri dec 30

Fri Dec 30

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Mon jan 2

Mon Jan 2

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Tue jan 3

Tue Jan 3

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Wed jan 4

Wed Jan 4

Availability of Services:

CERN Closed

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

TX54

CP

SL

[email protected]


Thu jan 5

Thu Jan 5

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

CSC Posts

a. Open FIN Doors

1h

1. Open FIN Doors

1h

b. Remove FIN plug

1h

2. Remove FIN plug

1h

Install PLT

Martin d1/4 WP:

Remove 1/2 BSC

A Bell 4h WP:

c. Prepare for radioscopy

6h

3. Prepare for radioscopy

6h

TX54

CP

SL

[email protected]


Fri jan 6

Fri Jan 6

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

CSC Posts

Carry out radioscopy

8h

Carry out radioscopy

8h

Install PLT

Martin d2/4 WP:

Install BLM

Dmitry 1d WP:

TX54

CP

SL

[email protected]


Mon jan 9

Mon Jan 9

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

CSC Posts

CSC Posts

Prepare for bake-out

8h

Prepare for bake-out

8h

Install PLT

Martin d3/4 WP:

TX54

CP

SL

[email protected]


Tue jan 10

Tue Jan 10

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

CSC Posts

CSC Posts

Prepare for bake-out

8h

Prepare for bake-out

8h

Install PLT

Martin d4/4 WP:

TX54

CP

SL

[email protected]


Wed jan 11

Wed Jan 11

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

CSC Posts

Prepare for bake-out

8h

Prepare for bake-out

8h

TX54

CP

SL

[email protected]


Thu jan 12

Thu Jan 12

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out -Z

8h

TX54

CP

SL

[email protected]


Fri jan 13

Fri Jan 13

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out -Z

8h

TX54

CP

SL

[email protected]


Mon jan 16

Mon Jan 16

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out -Z

8h

TX54

CP

SL

[email protected]


Tue jan 17

Tue Jan 17

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out +Z

8h

TX54

CP

SL

[email protected]


Wed jan 18

Wed Jan 18

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out +Z

8h

TX54

CP

SL

[email protected]

f Close Collar

1h WP:


Thu jan 19

Thu Jan 19

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Bake-out +Z

8h

Prepare GIS

8h

TX54

CP

SL

[email protected]


Fri jan 20

Fri Jan 20

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Inject Ne in BP

8h

TX54

CP

SL

[email protected]


Mon jan 23

Mon Jan 23

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

1. Install FIN plug + close FIN doors

Patrick + HE 2h WP:

2. Install FIN plug + close FIN doors

Patrick + HE 2h WP:

3. Remove scaffolding

3. Remove scaffolding

TX54

CP

SL

[email protected]


Tue jan 24

Tue Jan 24

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Restart Cryo

Remove scaffolding

Remove scaffolding

TX54

CP

SL

[email protected]


Wed jan 25

Wed Jan 25

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

A. EN-HE – bring down risers

Eric + 2Altead 2h WP:

C’. EN-HE – bring down risers

Eric + 2Altead 2h WP:

B. Move HF-Z out of garage

Maf + 2 Rtecs 4h WP:

D’. Move HF+Z out of garage

Maf + 2 Rtecs 4h WP:

C. Move HF-Z on 2 risers

Marc/Herve + 2 Rtecs 4h WP:

TX54

CP

SL

[email protected]


Thu jan 26

Thu Jan 26

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

1. Move HF+Z on 2 risers

Marc/Herve + 2 Rtecs 4h WP:

a. Install torsion prevention support

3VSC + Sandro + 1Altead 2h WP:034

a’. Survey BP

Andre + 1VSC 5h WP:035

b. Remove HF handrail on IP side

Maf + 2FSU 1h WP: 216

c. Move collar table in by 60cm + remove supports

Maf + 2FSU 2h WP: 216

TX54

CP

SL

[email protected]


Fri jan 27

Fri Jan 27

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

a. Install torsion prevention support

3VSC + Sandro + 1Altead 2h WP:034

A. Survey and align BP

Patrick + SU2h WP:

a’. Survey BP

Andre + 1VSC 5h WP:035

B. Install tooling for removal of ext beam

2h WP:

b. Remove HF handrail on IP side

Maf + 2FSU 1h WP: 216

C. Perform load transfer

4h WP:

c. Move collar table in by 60cm + remove supports

Maf + 2FSU 2h WP: 216

C’. Support for load transfer

4h WP:

D. Survey TAS and Fwd pipe

Antje 4h WP:

TX54

CP

SL

[email protected]


Mon jan 30

Mon Jan 30

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

0. EN-HE – lower 2 risers through PX56

2h WP:

A. Survey and align BP

Patrick + SU2h WP:

1. Remove extension beam

2h WP:

B. Install tooling for removal of ext beam

2h WP:

C. Perform load transfer

4h WP:

C’. Support for load transfer

4h WP:

2. Open HF & T2

30’ WP:

Check position of 13.7 BP support: P Lepeule

3. Move HF-Z on 4 risers

4h WP:

D. Survey TAS and Fwd pipe

Antje 4h WP:

TX54

CP

SL

[email protected]


Tue jan 31

Tue Jan 31

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

0. EN-HE – lower 2 risers through PX56

2h WP:

1. Remove extension beam

2h WP:

1. Install HF- access gangway

2h WP:

2. Open HF & T2

30’ WP:

1’. Install HF- tower reinforcement

3h WP:

Check position of 13.7 BP support: P Lepeule

3. Move HF on 4 risers

4h WP:

2. Move HF- towards IP

Pascal 15’ WP:

3. Engage and survey 13.7m support

2h WP:

TX54

CP

SL

[email protected]


Wed feb 1

Wed Feb 1

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

1. Install HF+ access gangway

2h WP:

a. Check position sensors

2h WP:

1’. Install HF+ tower reinforcement

3h WP:

a’. Survey BP 13.7m

3h WP:

2. Move HF+ towards IP

Pascal 15’ WP:

b. Close T2, BSC, HF- & check VSC cables at 13.7 meter

1h WP:

3. Engage and survey 13.7m support

2h WP:

c. Install brackets between CASTOR table and Plug

1h WP:

c’. Survey HF-

2h WP:

d. Engage HF X stops

1h WP:

e. shim Collar

1h WP:

TX54

CP

SL

[email protected]


Thu feb 2

Thu Feb 2

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

a. Close RS+Z (cheese wedges)

Pascal 3h WP:

a. Check position sensors

2h WP:

b. Install wooden shims

Dmitry 1h WP:

a’. Survey BP 13.7m

3h WP: 052

TX54

CP

SL

[email protected]


Fri feb 3

Fri Feb 3

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Install PLT temporary cables

Martin d1/2 WP:

TX54

CP

SL

[email protected]


Mon feb 6

Mon Feb 6

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Install PLT temporary cables

Martin d2/2 WP:

TX54

CP

SL

[email protected]


Tue feb 7

Tue Feb 7

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Commission PLT at beam level

8h WP:

Survey and Align PLT

4h WP:

TX54

CP

SL

[email protected]


Wed feb 8

Wed Feb 8

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Commission PLT at beam level

8h WP:

TX54

CP

SL

[email protected]


T hu feb 9

Thu Feb 9

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Commission PLT at beam level

8h WP:

TX54

CP

SL

[email protected]


Fri feb 10

Fri Feb 10

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

a. Close T2, BSC, HF+ & check VSC cables at 13.7 meter

1h WP:

b. Install brackets between CASTOR table and Plug

1h WP:

b’. Survey HF-

2h WP:

c. Engage HF X stops

1h WP:

d. shim Collar

1h WP:

e Close Collar

1h WP:

TX54

CP

SL

[email protected]


Mon feb 13

Mon Feb 13

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

a. Close RS+Z (cheese wedges)

Pascal 3h WP:

b. Install wooden shims

Dmitry 1h WP:

c. Start Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Tue feb 14

Tue Feb 14

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Wed feb 15

Wed Feb 15

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Thu feb 16

Thu Feb 16

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Fri feb 17

Fri Feb 17

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


M on feb 20

Mon Feb 20

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Tue feb 21

Tue Feb 21

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Wed feb 22

Wed Feb 22

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Pump down BP:

Gerhard 1d WP:

Remove SU brackets

Antje 5h WP:

TX54

CP

SL

[email protected]


Thu feb 23

Thu Feb 23

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Magnet ON

Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Fri feb 24

Fri Feb 24

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

Complete Pump down BP:

Gerhard 1d WP:

TX54

CP

SL

[email protected]


Mon feb 27

Mon Feb 27

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Tue feb 28

Tue Feb 28

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Wed feb 29

Wed Feb 29

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Thu mar 1

Thu Mar 1

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Fri mar 2

Fri Mar 2

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Mon mar 5

Mon Mar 5

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Tue mar 6

Tue Mar 6

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Contingency for magnet restart

TX54

CP

SL

[email protected]


Wed mar 7

Wed Mar 7

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Ready For Beam

TX54

CP

SL

[email protected]


Thu mar 8

Thu Mar 8

Availability of Services:

ECAL

CMX

ZEC

CSC RE

DT+ RB

TK FPIX

Survey

HCAL

TE-VSC

EN Dept

GS Dept

Beam ON

TX54

CP

SL

[email protected]


  • Login