February
This presentation is the property of its rightful owner.
Sponsored Links
1 / 31

February 2013 PowerPoint PPT Presentation


  • 34 Views
  • Uploaded on
  • Presentation posted in: General

February 2013. 1. COMPANY PRESENTATION. 1.1 Introduction 1.2 Services 1.3 Fields of Activity. 1.1 Introduction.

Download Presentation

February 2013

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


February 2013

February 2013


February 2013

1. COMPANY PRESENTATION

1.1 Introduction

1.2 Services

1.3 FieldsofActivity


February 2013

1.1 Introduction

  • NORAQUA, Engineering Consultants, ltd, was founded as a company in 1981 and resulted from bringing together the efforts its founding partners - civil engineering graduates - had been developing separately in basic sanitation research and projects. It also resulted from the increasing need, felt by everyone, to increment added value to research through introducing new competencies.

  • Currently the company is ongoing implementation process of certification of quality management system according to ISO 9001:2008.


February 2013

1.2 Services

  • Baseline Studies

  • Feasibility Studies

  • Master Plans

  • Design

  • Technical Assistance (in construction)

  • Project Management and Supervision

  • Rehabilitation Works


February 2013

1.3 FieldsofActitity

  • 1 – Hydraulics and Water Resources

    • Water Resources assessment

    • River Flood Control

    • Hydrological studies

    • Floods Studies

    • Weirs construction for floods

    • Multipurpose hydroelectric plant (mini)

    • River basin plans

    • Hydraulics Infrastructure Design

    • Agricultural Hydraulic Infrastructures Design


February 2013

1.3 FieldsofActitity

  • 2 – Urban Hydraulics

    • General Plans for Basic Sanitation

    • Water Supply Design: abstraction, water treatment plants, water main pipes, reservoirs e water supply networks

    • Wastewaters Drainage System and Industrial Sewage Networs Design: drainage network, sewage interceptors, pumping systems, wastewater treatment plants (domestic and industrial), underwater outfalls.

    • Storm water drainage systems designs

    • Industrial processes and domestic effluent characterization studies

    • Existing infrastructures diagnosis


February 2013

1.3 FieldsofActitity

  • 3 – Environment

    • Environmental impact assessment

    • Pollution control systems

  • 4 – Building installations

    • Water and Waste water networks

    • Fire protection and safety in buildings

    • Gaz Networks

    • Reuse of waste water

  • 5 – Cartografy and Registry

    • Geographical information systems (GIS)

    • Digital Cartografy

    • Expropriations


February 2013

2. PORTFOLIO

2.1 Master Plans

2.2 UrbanHydraulics

2.3 TreatmentPlants

2.4 BuildingInstallations


February 2013

2.1 Master Plans

Master plan for Water Supply and Waste Water Supply Systems in the North of Portugal (consortium)

date

2007/2008

Description

Water Supply and Waste Water Supply Systems diagnosis, global analysis, proposing new solutions, estimated cost, investment timming

Coverage

74 Municipalities; Population: 264 000 habitants


February 2013

2.1 Master Plans

Revision of Master Plan for Water Supply and Waste Water Systems along Ave River Basin (consortium)

Waste Water Systems

date

2007

Description

Revision of baseline elements, analysis of proposed solution and proposing alternatives, main description of new proposing solution, estimated costs, development plan

Population Covered

453 000 habitants


February 2013

2.1 Master Plans

Felgueiras

Paços de Ferreira

Lousada

Amarante

Paredes

Penafiel

Cinfães

Castelo de Paiva

Arouca

FurtherstudyoftheTechnical-financial feasibilitystudyfor Vale do Sousa Region (municipalities: Amarante, Arouca, Castelo de Paiva, Cinfães, Felgueiras, Lousada, Paços de Ferreira, Paredes e Penafiel) (consortium)

date

2005

Description

Theaimofthisstudywas to fixseveralproblems in basic sanitationofthisregion

PopulationCovered

434 000 habitants

Costs

WaterSystems– 134 M €; WasteWaterSystems- 247 M €


February 2013

2.2 UrbanHydraulics

JOVIM-NOVA SINTRA MAINPIPE

date

2007

owner

Águas do Douro e Paiva, S.A.

Description

New “Jovim-Nova Sintra” Main Pipe Design (DN900); technical assistance; maximum flow: 940 l/s

cost

9.500.000 €

extension

11.5 km


February 2013

2.2 UrbanHydraulics

PEDROUÇOS-NOGUEIRA II MAIN PIPE

date

2006

owner

Águas do Douro e Paiva, S.A.

Description

New “Pedrouços-Nogueira II” MainPipe (DN700); technicalassistance

cost

4.000.000 €

extension

8.5 km


February 2013

2.2 UrbanHydraulics

CHAVES WATER SYSTEM NETWORKS

date

2008

Owner

Chaves Municipality

Description

Chaves WaterSystems Networks (several zones) design (from DN110 to DN200); technical

assistance

cost

3.300.000 €

extension

46.4 km


February 2013

2.2 UrbanHydraulics

ESPINHO WATER SYSTEMS

date

Since1981

Owner

Câmara Municipal de Espinho

Description

Global WaterSystem Design (from DN60 to DN350) includingseveralreservoirs; technicalassistance

extension

61 km


February 2013

2.2 UrbanHydraulics

EXPANSION OF PEDROUÇOS RESERVOIR

date

1997

Owner

Águas do Douro e Paiva, S.A.

Description

Expansionof Pedrouços Reservoir (at Maia); tender preparation; technicalassistance

cost

2.000.000 €

Capacity

10 000 m3


February 2013

2.2 UrbanHydraulics

MASTER PLAN FOR CITY OF ESPINHO AND neighboring areas STORM WATER

date

1993

Description

Delineation of drainage basins for the city and strategies and parameters for the deployment of a network of storm water drainage

Populationcovered

33 700 habitants


February 2013

2.2 UrbanHydraulics

CITY OF ESPINHO AND neighboring areas STORM WATER

DRAINAGE SYSTEM

date

2000

Description

Storm Water Drainage System Design: around 50 km of network (from DN 315 to DN 1500)

Population covered

33 700 habitants


February 2013

2.2 UrbanHydraulics

Gafanha da Nazaré STORM WATER DRAINAGE SYSTEM

date

2011

Description

Storm Water Drainage System Design: around 22 km of network (from DN 315 to DN 1500 and “box-culvert” 1.0x2.0m)

Population covered

17 100 habitants

Cost (estimated)

7.4 M €


February 2013

2.2 UrbanHydraulics

Vila do Conde STORM WATER DRAINAGE SYSTEM

date

2005/2011

Description

Storm Water Drainage System Design: around 16 km of network (from DN 315 to DN 1500 and “box-culvert” 1.5x2.0m)

Cost (estimated)

4.85 M €


February 2013

2.3 TreatmentPlants

GRAMIDO WASTE WATER TREATMENT PLANT

date

1989

owner

Serviços Municipalizados de Gondomar

service

Design

Populationcovered

52 815 habitants (equivalents)

Capacity:

10 574 m3/day


February 2013

2.3 TreatmentPlants

MOSTEIROS WASTE WATER TREATMENT PLANT

date

2002

owner

Serviços Municipalizados de Ponta Delgada

service

Design

cost

591 757 €

Populationcovered

3 709 habitants (equivalents)

Capacity:

763 m3/day


February 2013

2.3 TreatmentPlants

S. SILVESTRE WASTE WATER TREATMENT PLANT

date

2007

owner

Empreiteiros CASAIS / Águas do Mondego, S.A.

service

Design

cost

2 001 445 €

Populatuioncovered

11667 habitants (equivalents)

Capacity:

2 100 m3/day


February 2013

2.3 TreatmentPlants

SOUSA WASTE WATERTREATMENT PLANT

date

2011

owner

DST / Águas do Noroeste,

S.A.

service

Design

cost

9 774 559 €

Populationcovered

84082 habitants (equivalents)

Capacity:

16 161 m3/day


February 2013

2.3 Estações de Tratamento

PADRASTOS WATER TREATMENT PLANT

date

1991

owner

Câmara Municipal de Vale de Cambra

service:

Design

cost

357 374 €

Populationcovered

17505 habitants (equivalents)

Capacity:

3 339 m3/day


February 2013

2.3 TreatmentPlants

QUEIMADELA WATER TREATMENT PLANT

date

1996/2005

owner

Câmara Municipal de Fafe /

Águas do Noroeste, S.A.

Service

Projeto de execução

Cost

1 009 617 € / 514 050 €

Populationcovered

Around 40 000 habitants

Capacity:

17 859 m3/day


February 2013

2.4 BuildingInstalations

HOTEL SHERATON LISBOA

DATE 2005

APPLICANT MAROPE

DESCRIPTION:

Remodelation/ expansion of a 405 rooms hotel, Health Club, Restaurants, indoor and outdoor swimming pools, several common areas for lazer and hotel services.

CHARACTERISTICS:

Floors: 35, 5 below the ground

SCOPE OF WORKS:

- Water supply systems

- Fire protection network

- Waste water drainage network

- Storm water drainage network

COST

630.000 €


February 2013

2.4 BuildingInstalations

HOTEL CROWN PLAZA (VILAMOURA BEACH)

DATE 2007 - 2009

APPLICANT MAROPE

DESCRIPTION

Remodelation/ expansion of a 330 rooms hotel, Health Club, Restaurants, indoor and outdoor swimming pools, several common areas for lazer and hotel services.

CHARACTERISTICS

Floors: 14, 1 below the ground

SCOPE OF WORKS:

- Water supply systems

- Fire protection network

- Waste water drainage network

- Storm water drainage network

COST

750.000 €


February 2013

2.4 BuildingInstalations

“CONTINENTE” HYPER AND SUPERMARKETS

DATE 1998 - 2013

APPLICANT SONAE, MC.

DESCRIPTION

Construction, remodelationandexpansionofaround 145 Continente, Continente Modelo and Continente Bom Dia shops, allaround Portugal

SCOPE OF WORKS:

- Water supply systems

- Fire protection network

- Waste water drainage network

- Storm water drainage network


February 2013

2.4 BuildingInstalations

ANTAS SHOPPING CENTER (DOLCE VITA PORTO)

DATE 2001

APPLICANT AMORIM IMOBILIÁRIA, S.A.

DESCRIPTION:

This building is composed by a Shopping Centre with 130 shops and 1695 vehicle parking places, one residential building and an Hotel

CHARACTERISTICS

Shopping Centre

Area: 62 500 m2

Floors: 7, 2 below ground

Residential Building

Apartments: 300

Hotel

Rooms: 120

SCOPE OF WORKS:

- Water supply systems

- Fire protection network

- Waste water drainage network

- Storm water drainage network

COST

2.423.000 €