Progress status of EMR Assembly. Teleconf. January 21, 2010. 1. EMR production status 2. EMR simulations (FEA studies) 3. EMR @ RAL. University of Geneva : A.Blondel, J-S Graulich, V.Verguilov , Coralie Husi, F.Masciocchi, L.Nicola, R.Bloch, N.Geisig, P.Béné, F.Cadoux.

Download Presentation

1. EMR production status 2. EMR simulations (FEA studies) 3. EMR @ RAL

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


1 emr production status 2 emr simulations fea studies 3 emr ral

Progress status of

EMR Assembly

Teleconf.

January 21, 2010

1. EMR production status

2. EMR simulations (FEA studies)

3. EMR @ RAL

University of Geneva: A.Blondel, J-S Graulich, V.Verguilov,

Coralie Husi, F.Masciocchi, L.Nicola, R.Bloch, N.Geisig, P.Béné, F.Cadoux


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Design & Module M0 prototype

As a recall…

KL

EMR

  • EMR features:

  • 24 modules

  • 1 module is made of X&Y planes

  • Nearly 11 km of WLS fibers

  • (1.2mm diam.)

  • 48 multianode PMT

  • 48 single pixel PMT

  • 28 Kg per plane (1,4 Ton totally)

EMR

Outer Box

Movable frame

(existing part)


1 emr production status 2 emr simulations fea studies 3 emr ral

Module M0 prototype

  • 2 planes X & Y have been assembled

    in a wooden black box…

  • a good experience to get a better feeling

  • about final schedule …

PMT

Single pixel

PMT

electronics

Support

(shielding?)

FEE has been

fixed upright

Light tight enclosure


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Production status

Nicolas & Laurent

STEP 1:

Bar cutting to length almost completed!

(from 3.5mm to 1.1m)


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Production status

STEP 2:

Fine milling of the bars (1100 +/-0.1mm)…on going at MECATEST in Geneva (sub contrator).

2 batches remaining (due date: first week of February).

This includes: milling, drilling (for glue injection) and tapping (for insert fixation)


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Production status (tentative schedule)

  • The full production of fiber gluing will start soon (within a week or so).

  • The pace will be 20 complete gluing per day (already challenging!!)

  • That means:

  • 1 plane per week (or 2 modules per month)

  • 2 modules to be tested per month … looks feasible (manpower is not sufficient to speed it up)

  • Based on the 1rst Module 0, it’s achievable but without any margin!

White paint not

shown here

insert

STEP 3: Gluing and fiber insertion (all the inserts in aluminum are ready for assembly)…

right after the white painting of the bar ends (done in one go)


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR simulations (FEA studies)

  • Ongoing, are 2 different studies:

  • One from Ghislain Gregoire on Magnetic shielding (by OPERA),

  • One from F.Cadoux about mechanical behaviour (sagging, stresses…

  • in order to size the EMR Outer Box properly.

FEA model of the whole EMR

3D IGES model of

the all shielding

Meshing without covering plates


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR simulations (FEA studies)

  • Sagging and stresses look OK (60x60mmx3mm cross section beams).

  • It showed the need of reinforcing the 4 corners (connections between modules)

  • by means of aluminum corner beams.

  • Several configurations studied:

  • Transportion loads (horizontal)

  • Rotation to get it upright @ RAL

  • - 1G Loading when vertical (in situ)

Worst case study:

No side panels,

No end plates (Top and bottom)

Slings for

Handling

(used for

rotation)


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues

EMR Box

Thanks to Tim for

the « environnement » STEP file…


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues (close up on EMR…we need about 1800mmx1800mmx1000mm)

EMR Box

1000 mm

1800 mm


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues (seen from one side…)

EMR Box

Cable tray

500mm

310mm

EMR

active

part

Could it be modified

or removed?

815 mm

Trolley


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues (seen from the Top…)

EMR Box

EMR

active

part

Platform

edge

1800mm


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues (seen from the Top…)

EMR Box

Useful to anticipate/accomodate with crane works

(sling fixations, rotations, mouvements,…)

EMR

active

part

Platform

edge

1800mm


1 emr production status 2 emr simulations fea studies 3 emr ral

EMR Integration @ RAL

Building/platform issues (anticipation / differents STEPS of MICE)

EMR Box

The EMR Outer Box will comply with the differents STEPS (moving downstream)

So, we have to work closely with Tim, Andy,… to make sure that no interference with platform

occurs…anytime! CAD works first and soon (to freeze the Outer Box)

STEP xx

STEP yy