1 / 15

PIT MANAGEMENT Why?

PIT MANAGEMENT Why?. Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue. SAND AND GRAVEL. Aggregate Management. OILSANDS. Aggregate Management. Updated Roles and Responsibilities Aggregates Administrator and Regional Aggregates Coordinators

dale
Download Presentation

PIT MANAGEMENT Why?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIT MANAGEMENTWhy? Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue

  2. SAND AND GRAVEL Aggregate Management OILSANDS

  3. Aggregate Management • Updated Roles and Responsibilities • Aggregates Administrator and Regional Aggregates Coordinators • Construction Project Administrators • Consultant • Aggregates Summary Request (ECG VOL 1) • On site management (ECG VOL 2) • Reporting

  4. Reporting • Removal report & Plan • Seasonal shutdown • 4 weeks of cessation of pit operations (Crushing phase) • Plan requirements • GPS (nad83 10tm projection), • Drafted in Microstation • Quality and stockpile reports • Quality of all surplus piles • % natural fines rejected

  5. Pit Management Expectations • Adequate resources • Multiple site visits by Consultant • Project Administrators and Agg. Coordinator inspections also

  6. inspection of timber clearing

  7. Inspection of stripping

  8. Inspection activities -crushing..

  9. Inspections of Stockpiling

  10. Inspection of mining

  11. Inspection of Clean up.

  12. Inspection Activities. clean up.

  13. Pit Signing inspection

  14. Final Reclamation • ELIMINATE COMPACTION, SOIL REPLACEMENT, SLOPES, SEEDING, ROCK PICKING

  15. Conclusion • It is easier to have the deficiencies fixed before the contractor leaves the site • Inspect a pit on your next field trip! • YOU CAN MAKE A DIFFERENCE

More Related