Fine Tuning Mathematical Models for Toll Applications

Fine Tuning Mathematical Models for Toll Applications. Dr. A. Mekky, P.Eng. , A. Tai, M. Khan Ministry of Transportation, Ontario, Canada. Presentation Outline. Introduction The GTA Hwy 407 Transportation Tomorrow Survey The GTA Model The Problem Model Fine-Tuning and Parameter Testing

Download Presentation

Fine Tuning Mathematical Models for Toll Applications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fine Tuning Mathematical Models for Toll Applications Dr. A. Mekky, P.Eng., A. Tai, M. Khan Ministry of Transportation, Ontario, Canada

  2. Presentation Outline • Introduction • The GTA • Hwy 407 • Transportation Tomorrow Survey • The GTA Model • The Problem • Model Fine-Tuning and Parameter Testing • Results and Conclusions.

  3. Introduction • Transportation models have many applications in transportation planning • One of those applications is the simulation of toll roads • In this kind of application one usually needs to estimate the expected revenue from a particular toll road investment • The main statistic coming out of the model in this case is the vehicle.km on the toll road • High accuracy of estimation is important.

  4. The Greater Toronto Area • 6 Regions • Population 5.4 Million • Employment 2.9 Million • Autos 2.8 Million • Daily Trips 12 Million

  5. Hwy 7A Hwy 404 Hwy 48 Durham Hwy 400 York Hwy 7 Hwy 401 Hwy 407 Hwy 10 Peel • East-west north of Toronto • 108 km in 4 Regions • Fully Electronic Tollway • Opened in November 1997 • Toll about 13c per km • Daily Trips about 300,000. DVP Toronto Gardiner Exp. Hwy 7 Hwy 407 Total Length = 108 km Average Peak Hr. Trip Length = 19.48 km Total Peak Hr. Users = 3,300 Total Peak Hr. Vehicle km = 641,500 Hwy 403 Halton Hwy 401 Lake Ontario Hwy 6 Hamilton QEW Hwy 6 Hwy 403 Highway 407

  6. Transportation Tomorrow Survey • Travel Behaviour Telephone Survey • Covers GTA & surrounding areas • 1986, 1991, 1996, 2001 • Info Contents: • Household Information (locations, etc) • Person Information (age, gender, etc) • Trip Information (OD, time, modes, etc).

  7. The GTA Model • Since the 1960’s • Base Year: 2001 • Zones: 1,677 • Gateways: 26 • Nodes: 12,457 • Links: 37,385 • Demand: Trip Matrix from TTS (2001) • All Trip Purposes, Automobile Trips Only • Commercial Vehicles not included explicitly.

  8. The Problem • Original Model Performed Reasonably well at the Screen-Line Level • However, it didn’t produce good results for observed volumes & the number of users on Hwy 407 • This had an effect on adjacent facilities

  9. The Problem cont’d • It was tempting to use tools to reproduce volumes on links (DEMADJ) • The decision was made to check/ fine-tune main elements of the network first.

  10. Fine-Tuning (stage 1) • Since good part of the network was “inherited” from the previous “century”, an update exercise was needed: • Fine-tuning Free-Flow Speeds • Adjust free flow speed on access roads and parallel facilities to Hwy 407 • Adjust free flow speed on Hwy 407 • Adjust free flow speed on Hwy ramps • Adjust some centroid connectors

  11. Fine-Tuning (stage 1)cont’d • Adjust Hwy 407 Capacity to 2200 vehicles/ hr/ lane (instead of 1800), as it carries low heavy vehicle traffic • Form of Volume Delay Functions Unchanged • Travel Matrix Unchanged.

  12. Fine-Tuning (stage 2) • Build upon Fine-Tuning of stage 1 • Adjust parameters of VDFs (alpha, beta) • Adjust Value of Time for tollway • Travel Matrix Unchanged.

  13. Parameters Testing • Alpha for Non-Highways • Alpha For Highways • Beta for Non-Highways • Beta for Highways • Value of Time A macro was written to do several emme/2 run with various combinations Of the above parameters.

  14. Hypotheses Tested • Base: Original network & original VDF • Stage 1 Update: Modified network with original VDF, no matrix modification • Stage 2 Update: Modified network with modified VDF, no matrix modification • DEMADJ on Stage 1 Update • DEMADJ on Stage 2 Update.

  15. Main Results

  16. Main Results cont’d % Changes Induced by DEMADJ On Stage1 (Actual vs Resultant)

  17. Main Results cont’d % Changes Induced by DEMADJ On Stage 2 (Actual vs Resultant)

  18. Screen Line Analysis(Estimated/ Counts Ratio)

  19. Hwy 407 counts vs Base Assignment R-Square = 76%

  20. Hwy 407 counts vs Stage 1 Update R-Square = 71%

  21. Hwy 407 counts vs Stage 2 Update R-Square = 72%

  22. Hwy 407 counts vs DJ on Stage 1 Update R-Square = 94%

  23. Hwy 407 counts vs DJ on Stage 2 Update R-Square = 89%

  24. Conclusions • Compared to fine-tuning using network and VDF parameters, adjustment of the matrix with DEMADJ distorted the original matrix and gave larger errors in average trip length, VKM and the number of Hwy 407 users • Fine-tuned model performed well at the screen-line level as well as gave better average trip length, VKM and number of users on Hwy 407 • It is advised that models should be validated using info re average trip length, VKM if possible • Heavy usage of DEMADJ without checking other parameters is not recommended.

  25. END