1 / 5

“SDK WAVES TURBINE”. Electricity from oceans waves SYSTEMS VALIDATION: 1:5 PROTOTYPE

“SDK WAVES TURBINE”. Electricity from oceans waves SYSTEMS VALIDATION: 1:5 PROTOTYPE & AUTONOMOUS BUOYS. CAROLINA GRASES MENDOZA cgrases@sendekia.com. SENDEKIA S.L. www.sdkmarine.com.

cuyler
Download Presentation

“SDK WAVES TURBINE”. Electricity from oceans waves SYSTEMS VALIDATION: 1:5 PROTOTYPE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “SDK WAVES TURBINE”. Electricityfromoceanswaves SYSTEMS VALIDATION: 1:5 PROTOTYPE & AUTONOMOUS BUOYS CAROLINA GRASES MENDOZA cgrases@sendekia.com SENDEKIA S.L. www.sdkmarine.com

  2. "The wave energy is one of the most unknown energy to man, although that is clean, inexhaustible and with great potential“ The SDK Technology is scalable to small autonomous machines, to produce electricity integrated in ocean buoys. FUGRO OCEANOR a Norwegian company specializing in ocean buoys, is interested in try our technology in one of their buoys.

  3. Project objectives: 1 Technical Viability Demonstrate the technology through a 1:5 scale demonstrator prototype, to be installed in Cartagena Harbor for 12 months aprox. These prototype was financial by Repsol Foundation.

  4. Project objectives: 2 Micro-generation Demonstrate the technology through pilot device integrated in a Fugro Oceanor buoy. If Sendekia meets the R&D objectives, we expected to sign a trade agreement.

  5. Project objectives: 3 Go to market Shorten the commercial phase of the technology, originally designed for generating scale "Utility", allow the company to demonstrate knowledge of the technology and the feasibility of the system, through the experience of having installed at sea smaller machines.

More Related