Stewardship Oversight Committee Project Delivery Design & Construction Performance Measures

Stewardship Oversight Committee Project Delivery Design & Construction Performance Measures. May 2012. % of Projects On Time for PS&E Acceptance (Statewide). KPM #21. % of Projects On Time for NTP (Statewide). % Preliminary Engineering (PE) (Statewide).

cutler
Download Presentation

Stewardship Oversight Committee Project Delivery Design & Construction Performance Measures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stewardship Oversight CommitteeProject Delivery Design & ConstructionPerformance Measures May 2012

  2. % of Projects On Time for PS&E Acceptance(Statewide)

  3. KPM #21 % of Projects On Time for NTP(Statewide)

  4. % Preliminary Engineering (PE)(Statewide)

  5. % of Projects Awarded Within Engineering Estimate (Statewide)

  6. Project Delivery Performance Measures -- Bid

  7. Excludes projects with plant establishments, unusual labor compliance disputes and projects with non typical disputes preventing final payment.

  8. Contract Administration 13. Average No of CCOs/EWOs Processed per Project for Projects Finalized (Third Note)

  9. Contract Administration 13. Average No Materials Exceptions Processed per Project for Projects Finalized (Third Note) NO DATA GATHERED PRIOR TO 2012

  10. Percent NHS Mileage with IRI < 95 in/mi● 2005 - 2009 Data based on FHWA Highway Statistics Series Table HM-47 as collected and reported under the HPMS program. ● 2010 data from Oregon HPMS submittal.