NKU
Download
1 / 13

NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center - PowerPoint PPT Presentation


  • 217 Views
  • Uploaded on

NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center for Environmental Restoration. Agricultural Land and Stream Restoration Livestock Management and Stream Exclusion. Before. After. Wright Farm, Kenton County.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center ' - crevan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

NKUStream Restoration ProgramScott Fennell, PEDirector / Principal Engineer

Northern Kentucky UniversityCenter for Environmental Restoration


Agricultural Land and Stream Restoration

Livestock Management and Stream Exclusion

Before

After

Wright Farm, Kenton County


Agricultural Land and Stream Restoration

Breached Dam & Sediment Removal

with Stream Restoration

Before

After

During

Wright Farm, Kenton County


Bank StabilizationBank Sloping, Rock Toe, and Re-vegetation

After

Before

After

Bentwood Hills Condos


Bank StabilizationRock Deflectors, Bank Sloping, and Re-vegetation

Before

After

During

Bentwood Hills – Three Mile Creek


Bank StabilizationStone Wall Bank Protection & Salamander Condos

After

During

Adair WMA


Channel StabilizationStone Grade Control Structures at Headcut Locations

After

Before

During

Adair WMA


Stream RehabilitationChannel Restoration through Abandoned Development Site Fill

Before

After

After

During

Split Rock Conservation Park


Stream re establishment meander and riffle pool restoration

Stream Re-establishmentMeander and Riffle / Pool Restoration

After

Before

During

Adair WMA


Stream Re-establishmentChannel Restoration through Demolition Debris Landfill

After

Before

During

During

Joe’s Creek


Stream re establishment lake removal and meandering channel restoration
Stream Re-establishment Lake Removal and Meandering Channel Restoration

After

Before

After

During

Florence Golf Course


Stream re establishment sinuosity and floodplain restoration on channelized stream
Stream Re-establishment Sinuosity and Floodplain Restoration on Channelized Stream

After

Before

After

During

Boone Woods Park


Wetlands establishment stormwater wetlands
Wetlands EstablishmentStormwater Wetlands

Bentwood

Boone Woods

Burlington Elementary


ad