IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. BUDGET ALLOWANCE: FY 2014- $ 988K Internal UFR FY 2015- $208K Internal UFR FYDP16-20- $2.544M. IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. PROCUREMENT PROJECTED TOTAL COST: $352,000 +/- SUPPORT TOTAL COST: $127,000 +/-

cortez
Download Presentation

IRWIN MIDDLE SCHOOL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRWIN MIDDLE SCHOOL

  2. IRWIN MIDDLE SCHOOL

  3. IRWIN MIDDLE SCHOOL BUDGET ALLOWANCE: FY 2014- $988K Internal UFR FY2015- $208K Internal UFR FYDP16-20- $2.544M

  4. IRWIN MIDDLE SCHOOL

  5. IRWIN MIDDLE SCHOOL • PROCUREMENT PROJECTED TOTAL COST: $352,000 +/- • SUPPORT TOTAL COST: $127,000 +/- • SUPPLIES UNIT COST: $52,000 +/-

  6. IRWIN MIDDLE SCHOOL • 2013NOV04- SITEC CONDUCTS INITIAL SITE SURVEY • 2013NOV13- PROJECTED DATE FOR DETAILED ASSESSMENT TO DETERMINE NUMBER AND PLACEMENT OF SIPR/NIPR DROPS AND OUTLETS

  7. IRWIN MIDDLE SCHOOL • NIPR CABLE CAN BE REUSED • SIPR MUST BE PULLED IN CONDUIT • ALL NETWORK ELECTRONICS ARE OUT OF SPECIFICATION AND MUST BE REPLACED

  8. IRWIN MIDDLE SCHOOL • PROJECTED MOVE IN TIMEFRAME NLT MAY/JUNE 2014