1 / 7

Transmission Advisory Group Enhanced Transmission Access Planning

Transmission Advisory Group Enhanced Transmission Access Planning. Pam Kozlowski February 3, 2006. Enhanced Transmission Access Planning.

corina
Download Presentation

Transmission Advisory Group Enhanced Transmission Access Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transmission Advisory Group Enhanced Transmission Access Planning Pam Kozlowski February 3, 2006

  2. Enhanced Transmission Access Planning • PURPOSE - Evaluate the means to increase transmission access to potential resources inside and outside the control areas of Duke and Progress to serve load in NC. • STEP 1 - Participants and TAG members propose scenarios and interfaces to be studied.

  3. Reliability Planning PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules PWG evaluates reliability problems and current transmission upgrade plans Participants and TAG review the reliability study results PWG develops and the OSC approves the reliability study scope OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG develops and the OSC approves the enhanced access study scope PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan Enhanced Transmission Access Planning Participants’ resource planning processes

  4. Enhanced Transmission Access Option Form – Part 1

  5. Enhanced Transmission Access Option Form – Part 2

  6. Enhanced Transmission Access Planning • TAG Responses – Due by February 17, 2006 • Email Forms to: Pam Kozlowski, Gestalt LLC pkozlowski@gestalt-llc.com • PWG reviews all proposed scenarios / interfaces and provides OSC a recommendation on the Enhanced Transmission Access Options for analysis in 2006 • OSC provides TAG feedback by March 10, 2006

  7. Enhanced Transmission Access Planning – TAG Input QUESTIONS ? or COMMENTS

More Related