Spill bay 18
Download
1 / 11

Spill bay 18 - PowerPoint PPT Presentation


  • 67 Views
  • Uploaded on

Spill bay 18. Bradford Island “B” Branch Fish Ladder. South fish ladder. Figure 1. Photograph looking upstream at the south fish ladder and training spill from bay 18, Bonneville Dam, April 4, 2006. Spill bay 1. Cascade Island North fish ladder.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Spill bay 18' - cooper-irwin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Spill bay 18

Bradford Island “B”

Branch Fish Ladder

South fish ladder

Figure 1. Photograph looking upstream at the south fish ladder and training spill from bay 18, Bonneville Dam, April 4, 2006.


Spill bay 1

Cascade Island

North fish ladder

Figure 2. Photograph looking upstream at the north fish ladder and training spill from bay 1, Bonneville Dam, April 4, 2006.


Figure 3. TDG pressure and project operations measured at the Bonneville Dam forebay and tailwater fixed monitoring stations, April 4, 2006.


Figure 4 south fish ladder deployment sketch
Figure 4. South fish ladder deployment sketch the Bonneville Dam forebay and tailwater fixed monitoring stations, April 4, 2006.

C

B

A


B the Bonneville Dam forebay and tailwater fixed monitoring stations, April 4, 2006.

A

Figure 5. Photograph of the entrance of the south fish ladder (positions A and B), Bonneville Dam, April 4, 2006.


Figure 6. TDG pressure and instrument depth measured at the Bonneville Dam south fish ladder, April 4, 2006.


Figure 7. TDG saturations and instrument depth measured at the Bonneville Dam south fish ladder, April 4, 2006.


Figure 8 north fish ladder deployment sketch

E the Bonneville Dam south fish ladder, April 4, 2006.

D

F

Figure 8. North fish ladder deployment sketch


Figure 9. TDG pressure and instrument depth measured at the Bonneville Dam north fish ladder, April 4, 2006.


Figure 10. TDG saturations and instrument depth measured at the Bonneville Dam north fish ladder, April 4, 2006.


Figure 11 photograph of the north fish ladder positions e and f bonneville dam april 4 2006

F the Bonneville Dam north fish ladder, April 4, 2006.

E

Figure 11. Photograph of the north fish ladder (positions E and F), Bonneville Dam, April 4, 2006.


ad