DEL IR 71 at US 36/SR 37 Interchange Modification. TRAC Request: Tier II $5 million for further investigation. PROBLEM/ISSUE. Safety Concern at Morning/Afternoon Rush hour Common Sight to see Vehicles at a standstill on the Interstate as traffic speeds by at 65 mph. . PROBLEM/ISSUE.

Download Presentation

DEL IR 71 at US 36/SR 37 Interchange Modification

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Del ir 71 at us 36 sr 37 interchange modification

DEL IR 71 at US 36/SR 37 Interchange Modification

  • TRAC Request:

  • Tier II

  • $5 million for further investigation


Problem issue

PROBLEM/ISSUE

Safety Concern at Morning/Afternoon Rush hour

Common Sight to see Vehicles at a standstill on the Interstate as traffic speeds by at 65 mph.


Problem issue1

PROBLEM/ISSUE

  • Congestion

  • Crashes Elevated

    Traffic Volumes

  • 20 Year Projections Show Traffic Increase

  • Delaware County one of the Fastest Growing in the State of Ohio


Why now

WHY NOW

  • Improve Safety

  • Increase Capacity

  • Work with Municipalities/ Developers


Why now1

WHY NOW

  • Safety Project Underway

  • Short Term Improvements

  • Reduce Crashes

  • Begin 2012


Why now2

WHY NOW

Median in the Center

Consolidate Access Points

Reconfigure Lanes on Bridge


Why now3

WHY NOW

  • Improve Access to Local Streets

  • Safer/More Efficient

  • Surrounding Areas Zoned Commercial/Residential

  • Improve Connectivity to Delaware/Sunbury/Galena Communities


Opportunity

OPPORTUNITY

  • Value Capture Financing of Improvements

  • Local Road Network

  • Reduce/Replace Future TRAC Request


Benefits support

BENEFITS/SUPPORT

Partnership with County Engineer

  • Chris Bauserman. P.E., P.S.

    Partnership with Developers

  • Robert Weiler/Nationwide Realty Investors

  • Northgate Development


Del ir 71 at us 36 sr 37 interchange modification

Planning in Place

-US 36/SR37 Access Management Plan Delaware County

-Delaware County Thoroughfare Plan

-Delaware Regional Planning Commission: Berkshire and Berlin Township Master Plans


Del ir 71 at us 36 sr 37 interchange modification

I71/US36 Interchange Economic Impact Study

Funded by the Delaware County Commissioners

Purpose: Economic and Fiscal Analysis

  • Aggregate economic and fiscal impact estimates

  • Information on potential taxgeneration


Del ir 71 at us 36 sr 37 interchange modification

Delaware County Logistics = Business Retention/Attraction

These companies represent over 2500 employees and 2500 trucks per day. All are expanding operations and employment.

Kroger, for example, owns about 400 food manufacturing plants around the US. When they relocate/expand, we’d like for them to consider Delaware County or central Ohio.

AHP just closed a Vancouver, Washington, facility to move operations to Delaware because of a logistical advantage.


Del ir 71 at us 36 sr 37 interchange modification

Project a Potential Catalyst for:

  • Increased Service along 36/37 Corridor

  • Additional Connection to COTA Service

  • Linkage to 3-C Rail Service


Request cost

REQUEST/COST

$5 Million for further investigation

TRAC Tier II Status