1 / 2

What Is Air Testing In East London & How Is It Done

The air testing in East London has several names: air testing, air loss testing, blower door, air pressure test, air permeability testing, air leakage testing, and fan testing. All these names are interchangeably used in the field.

Download Presentation

What Is Air Testing In East London & How Is It Done

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What Is Air Testing In East London & How Is It Done The air testing in East London has several names: air testing, air loss testing, blower door, air pressure test, air permeability testing, air leakage testing, and fan testing. All these names are interchangeably used in the field. This testing is done to check the permeability of the building or the dwelling. The place's air permeability is tested to identify how much hot or cold air is lost from the uncontrolled ventilation, which leads to energy loss. Let’s see how is thisair testing south London is done.  At the external envelope of the building, the fan is installed.  This fan supplies the air into the property and extracts the inside air outwards.  This fan supply and extracts air that creates air pressure.  Here, before switching on the fans, the building will be temporarily sealed.  Then after the fans are switched on. Furthermore, with the help of calibrated equipment, the airflow into or outwards of the property is calculated.

  2. As the air pressure of the entire property of each range of air pressure has to be calculated, in the air testing in East London, the pressure is gradually increased and decreased to record the pressure at each step. Doing this test ensures that the building meets the permeability rating and ensures the dwelling energy is efficient.

More Related