1 / 11

F.I.O State Enterprise Economic Plantation 144,000 ha (200 Project)

นโยบายพลังงานทดแทน การจ้างงานและอ.อ.ป

collin
Download Presentation

F.I.O State Enterprise Economic Plantation 144,000 ha (200 Project)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. นโยบายพลังงานทดแทน การจ้างงานและอ.อ.ป องค์การอุตสาหกรรมป่าไม้ปลูกสร้างสวนป่าด้วยระบบหมู่บ้านป่าไม้มายาวนานกว่า 40 ปีมีพื้นที่สวนป่าเศรษฐกิจ 900,000ไร่ มีศักยภาพในการผลิตพลังงานทดแทนด้าน Biogas,ก๊าซCBGและไฟฟ้าได้อีก 1,000 เมกะวัตต์โดยรัฐบาลส่งเสริมกรมป่าไม้ปลูกไม้เศรษฐกิจอายุสั้นรอบตัดฟัน2ปีเพื่อพลังงานได้แก่ ไม้ไผ่ ไม้กระถินยักษ์ ในพื้นที่ป่าสงวนเสื่อมโทรม 10ล้านไร่ จะสามารถเพิ่มการจ้างงานและเพิ่มรายได้ในชนบทได้อีก 400,000ครอบครัว สอดคล้องนโยบายรายได้วันละ300บาท โดยไม่รบกวนพื้นที่ปลูกอาหารแต่อย่างใด วิกฤติน้ำท่วมใหญ่และภาวะการว่างงานหลายแสนคน ปี2554นี้อยากให้นายกรัฐมนตรียิ่งลักษณ์ รัฐมนตรีกระทรวงทรัพยากรธรรมชาติและสิ่งแวดล้อม และรัฐมนตรีพลังงาน ร่วมกันพัฒนาพลังงานทดแทนเพื่ออนาคตประเทศไทย • F.I.O State Enterprise • Economic Plantation 144,000 ha (200 Project) • Wood Residues 1,200,000 tons/yr • Agriculture Residues from Neighboring F.I.O Plantation 3,000,000 tons/yr

  2. 100 Forest Plantations • Upper-North • 7 Provinces 34 Plantation • Mae Hong Son: 3 • Chiang Rai: 1 • Chiang Mai: 7 • Lamphun: 5 • Lampang: 8 • Nan: 1 • Phrae: 9 • Northeast • 10 Provinces 33 Plantations • Nakhon Rajcha Sima: 4 • Chaiyaphum: 1 • Khon Kaen: 3 • Buriram: 3 • Sisaket: 5 • Ka: 1 • Surin: 6 • Ubun Rajchathani: 6 • Mukdahan: 2 • Loei: 2 ภาคเหนือ North ภาคตะวันออกเฉียงเหนือ Northeast ภาคกลาง Central ภาคตะวันออก East • Central • 6 Provinces 12 Plantations • Uthaithani:: 1 • Kanchana Buri: 5 • Suphanburi: 1 • Phetchaburi: 1 • Cha Choeng Sao: 1 • Srakaew: 3 ภาคใต้ South • Lower-North • 6 Provinces 21 Plantations • Utta Radit: 4 • Phit Sanulok: 4 • Phetchabun: 2 • Sukhothai: 3 • Tak: 7 • Nakhon Sawan: 1 Biomass Renewable project

  3. FAST GROWING SPECIES FOR BIOMASS RENEWABLE ENERGY PROJECT

  4. ENERGY CROP

  5. LOCAL TRANSPORTATION/LOW COSTS

  6. Wood wastes 12.5 ton/ha F.I.O wood wastes

  7. Higher heating value‎ Source: Krongkaew Laohalidanond. 2007. CMU. J. Nat. Sci. (2007) Vol. 6(1)

  8. Cost of Wood Residues • Result from EforE’s survey: • Fertilizer plant: purchasing price 300 THB/ton • Minimum Wage: 150 THB/ton • Labor Collection Capacity: 1 ton/day • Distance of Vehicle Access from Collecting • Point 800 Meter • Distance to Power Plant 15-20 km. • Processing Cost (Wood Chopping) 150 THB/ton • Transportation Cost 50 THB/ton • Assumptions for transportation Cost: • Petrol Price: 40 THB/Litre • Fuel Cost for transportation in 20 km: 750 THB/trip • Wood Weight per Trip: 17 ton Plantation Boundary r> 800 m No Vehicle Access r< 800 m X Collecting point r~ 15-20 km Location for Biomass Plant Cost of Wood Residues = 500 Bht./ton Fuel price will depend on the financial analysis.

  9. Attitude Survey Level of Understanding • Low level of understanding • It is crucial to provide basic information on biomass power plant to the locals once start project implementation. Group 1 : No background on Biomass power plant, but concerns on environmental impacts Group 2 : Strong concern on environmental impacts especially Those in Lampang Province due to their experiences from Environmental impacts of Coal-fired power plant Attitude on Environmental Impacts • Developer shall provide info on environmental impacts and mitigation option. • The project should at least conduct IEE to ensure that all environmental impacts are taken into considertion. • High public acceptance due to increasing revenues from job creation and selling biomass • Good relationship between FIO plantations and locals creates public acceptance e.g. Chiang Tong • Awritten social contract with the local authority as assurance on environmental impacts effectively create confidence and acceptance of biomass power plants from communities. Acceptance

  10. Benefit to community from Biomass plant Wood residues as main feedstock Remarks : a worker collecting wood residues 1 ton/day Wage rate for FIO’s temperaly worker 120-150 baht/day Benefit to community from Biomass plant Agricultures waste as main feedstock 1.1,000 kw power plant

  11. Projects using FUTURE biomass from FIO’s plantations as a primary fuel

More Related