Gamma-ray Large Area Space Telescope. TEM/TPS MRR Part 2. GLAST Large Area Telescope: B. Estey, Production SLAC [email protected] (650) 926-8531. Parts, Materials, and Processes. EEE Parts All EEE parts have been approved for use by the Program Parts Board

Download Presentation

TEM/TPS MRR Part 2

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Tem tps mrr part 2

Gamma-ray Large Area Space Telescope

TEM/TPS MRR Part 2

GLAST Large Area Telescope:

B. Estey, Production

SLAC

[email protected]

(650) 926-8531


Parts materials and processes

Parts, Materials, and Processes

  • EEE Parts

    • All EEE parts have been approved for use by the Program Parts Board

    • Status of TEM Parts Qualification (highlighted yellow items=part approved, not in use):


Parts materials and processes1

Parts, Materials, and Processes

  • EEE Parts

    • Status of TEM Parts Qualification , cont’d (highlighted yellow items=part approved, not in use):


Parts materials and processes2

Parts, Materials, and Processes

  • EEE Parts, cont’d

    • Status of TPS Parts Qualification (highlighted yellow items=part approved, not in use):


Parts materials and processes3

Parts, Materials, and Processes

  • EEE Parts, cont’d

    • Status of TPS Parts Qualification, cont’d (highlighted yellow items=part approved, not in use):


Parts materials and processes4

Parts, Materials, and Processes

  • EEE Parts, cont’d

    • Status of TPS Parts Qualification, cont’d (highlighted yellow items=part approved, not in use):


Parts materials and processes5

Parts, Materials, and Processes

  • Materials

    • All Materials have been approved by the Program MPRB in accordance with LAT-SS-00107, LAT Mechanical Parts Plan

      • GLAST/LAT Material Usage Agreement #002 (MAR DID No. 313; LAT Document # LAT-TD-04756-01)- Approved 9/13/04

  • Processes

    • All processes have been reviewed and approved by the Program MPRB in accordance with LAT-SS-00107, LAT Mechanical Parts Plan


Procurement status

Procurement Status

  • Assembly Subcontractor

    • GTC Corp. was awarded the contract to provide the assembly service and some environmental testing for all levels of the TEM/TPS (Reference LAT-PS-03078, SOW LAT TPS and LAT-PS-02615, SOW LAT TEM)

      • GTC Corp. is located in Albuquerque, New Mexico

  • EEE Parts

    • All EEE parts are SLAC furnished and have been procured for the TEM and TPS

      • Outstanding receipt of Novacap Capacitors expected 9/16/04

        • Part no. 1210B563K251YHTM

      • Outstanding receipt of balance of tantalum capacitors expected 9/20/04

        • Part nos. CWR11FH475KDB and CWR11FH105KDB

  • Metal Fab Parts and Fasteners

    • All Metal Fab parts and Fasteners are SLAC furnished and have been procured for the TEM and TPS

      • Outstanding receipt of TPS Box Bases, LAT-DS-00995 expected 9/16/04

      • Outstanding receipt of TEM Connector Plates, LAT-DS-01026, expected 9/17/04

      • Outstanding receipt of balance of Heat Sinks, TPS, LAT-DS-04101, expected 9/24/04

      • Outstanding receipt of balance of Cable Harness Support, TPS, LAT-DS-03598, expected 9/24/04

  • PWBs

    • The PWBs for TEM and TPS are SLAC furnished and have been contracted to DDI

      • Fabrication complete on Qual + 2, balance of PWBs to be fabricated pending successful data review of TEM and TPS Module performance


Procurement status1

Procurement Status

  • FPGA Programming

    • Programming of the FPGAs has been contracted to ACTEL

      • Programming complete on Qual + 2, balance of FPGAs to be programmed pending successful data review of TEM and TPS Module performance

  • Materials

    • Assembly materials are furnished by GTC Corp. in accordance with drawing requirements (adhesives, conformal coating, wire, primer, etc.)


Manufacturing facilites

Manufacturing Facilites

  • Assembly contract has been awarded to General Technology Corporation, located in Albuquerque, New Mexico

    • Capabilities Overview

      • DS/Multilayer PC Boards assembled to Mil-Spec

      • Thru-hole and Surface Mount Technology (SMT)

      • Electro/mechanical Assembly

      • Cables and Harnessing

      • Conformal Coating

      • Testing (Including ESS)

    • Facilities Overview

      • 72,000 ft2 Custom Built Manufacturing Facility

        • TEM/TPS assembly and test to be performed in an environmentally controlled area with monitoring capabilities for temperature and relative humidity

        • Facility complies with the ESD control requirements specified in ANSI/ESD 20.20-1999

      • Manufacturing

      • Engineering

      • Test

      • Stockroom

      • Administration

    • Certifications

      • GTC performs to the intent of the following certifications assuring quality assembly

        • MIL-STD -2000A

        • IPC-A-610C

        • IPC/WHMA-A-620

        • MIL-STD-454

        • IPC/EIA J-STD-001C

        • MIL-I-45208

        • ISO 9002


Manufacturing process flow gtc

Manufacturing Process Flow- GTC

  • Materials notes

    • Receiving inspection will be performed on all materials supplied by the customer using documents supplied

    • All discrepancies shall be documented and relayed to the customer in 24 hours from their discovery

    • All moisture sensitive materials used in the manufacturing of the TEM will be stored and handled in accordance with GTC-2025A -Moisture Sensitive Component Handling, Use of Dry Room Storage.

    • Materials issued in the production of TEM/TPS for assembly will be traced in a manner that would enable traceability from the assy S/N to the individual part /piece and production lot/date code.

    • Every TEM and TPS assembly will have its own traveler issued to facilitate traceability of IC serial numbers installed on that particular CCA.


Manufacturing process flow gtc1

Manufacturing Process Flow-GTC

  • Materials

Inspect

Receive KIT

Not OK

Contact SLAC/

Resolve issue

OK

Clean and bake PCB

Issue Kit To prod.


Manufacturing process flow gtc2

Manufacturing Process Flow-GTC

  • SMT area notes

    • Operators will record all IC serial numbers and location at which they are installed on a particular CAA for traceability purposes. All IC’s used in the production of TEM assemblies are serialized.

    • Operators will inspect and measure the solder paste height on every print at 3 predetermined locations. The results will be recorded in the SMT printer log along w the printing parameters


Manufacturing process flow gtc3

Manufacturing Process Flow-GTC

Inspect/

Measure

  • SMT Production Area

Set Up P&P and SP

Screen print

Solder side

Inspect Kit

OK

Not

OK

Clean

1st art.

Inspection

Inspect

OK

P&P all SMT

components

Reflow

Contact SLAC

Correct root

cause

Not

Ok

ok

Clean

Not OK

Touch up


Manufacturing process flow gtc4

Manufacturing Process Flow-GTC

  • Second Operations

Inspect

Install connectors

Solder connectors

OK

Not

OK

Touch

up

Clean

Contact SLAC

MRB

Move to test


Manufacturing process flow gtc5

Manufacturing Process Flow-GTC

  • CCA Test

Pass

Pass

Stake HW

& components

Touch-up

Functional test

Fail

ICT

Top/Bt

Fail

Touch up

Contact SLAC

MRB


Manufacturing process flow gtc6

Manufacturing Process Flow-GTC

  • Module assy/conformal coating/thermal cycling

CCA level

Thermal cycling

No

Touch up

Conformal coat

Contact SLAC

MRB

Functional test

OK

Apply Kapton to

Back side of CCA

Inspect

Conformal coat.

Apply thermal Adhesive

And mount CCA in

Chassis base

Move to next op.


Manufacturing process flow gtc7

Manufacturing Process Flow-GTC

  • Module Level Test

Vacuum de-gas

Adhesive cure

Install chassis

Top cover

Inspect

ok

Stake HW

Functional test

Module

Assy level

Thermal

Cycling

Contact SLAC

MRB

no

Functional test

Move to next op.


Manufacturing process flow gtc8

Manufacturing Process Flow-GTC

  • Top assembly/final test/final inspection

Assemble

TEM/TPS

Stake HW

Functional

Test

Top Assy level

Thermal

Cycling

Source inspection

&EIDP review

Functional test

Vibration

test

Final functional test

Pack & ship to

SLAC


Configuration management

Configuration Management

  • Required changes to documentation during the manufacturing phase at GTC will be immediately documented on an NCMR and forwarded to SLAC for disposition

  • All outstanding changes to documents will be incorporated and a new revision released into LAT DOCs prior to final inspection at each manufacturing level (CCA, Module, Top Assembly)


Configuration management1

Configuration Management

  • All change notices will include full disposition of hardware

Disposition of Hardware


Gtc test requirements

GTC Test Requirements

Figure 1. Vibration Levels, Duration, and Spectra


Gtc qualification and acceptance test matrix

GTC Qualification and Acceptance Test Matrix


Production schedule

Production Schedule


Production schedule1

Production Schedule


Production schedule2

Production Schedule


Issues concerns

Issues/Concerns

  • Actel FPGAs pose a reliability concern

  • Maxim 724 is rated at 2.6-32.0V, we are biasing to operating at 1.5V. Parts were not screened for this application, PCB reviewing screening requirements.


  • Login