1 / 12

Beam Line BPM Filter Module

Beam Line BPM Filter Module. Nathan Eddy May 31, 2005. Beamline BPM Upgrade – System Overview. Clock. Trigger. VME. Ethernet. PPC Controller Calculate Position & Intensity. Echotek Digitize & Downconvert. ACNET. VME Crate. A,B. Front Panel Cables. Analog Filter Gain/Att.

colin-gates
Download Presentation

Beam Line BPM Filter Module

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Line BPM Filter Module Nathan Eddy May 31, 2005

  2. Beamline BPM Upgrade – System Overview Clock Trigger VME Ethernet PPC Controller Calculate Position & Intensity Echotek Digitize & Downconvert ACNET VME Crate A,B Front Panel Cables Analog Filter Gain/Att Rack In Service Building A Pickup In Tunnel Cables (RG8/RG213) to Service Building Analog Filter Gain/Att B BPM Upgrade

  3. Beamline BPM Upgrade – Electronics Overview VME Backplane PPC Controller – handles front end software, readout, and communication Digital PS CD Clock Board – provides each Echotek board with clock input (74MHz) Echotek Echotek Echotek Ethernet Echotek – digitizes & downconverts the 8 analog inputs (4 bpms) IP Modules Trigger Fanout PPC Controller CD Clock Board Trigger Fanout – generates trigger input for each Echotek from BeamSync IP Modules – modules to decode TCLK, generate triggers, calibration I/O Analog Filter – filters, attenuates, & amplifies analog signal as needed Linear PS Test/Ctrl Module – handles setup of filter modules including test pulses Analog Filter Analog Filter Analog Filter Test/Ctrl Module Separate crate for Analog Modules – linear PS & existing control software BPM Cables from Tunnel BPM Upgrade

  4. Beamline BPM Upgrade – Analog Filter Module • 53MHz Bunched Beam • 1-4 large intensity bunches (TeV) • 7-84 consecutive bunches (rev P, Stacking) • 2.5MHz Bunched Beam • 4 bunches Accumulator to Main Injector • Test Feature (Electronics) • Inject 2.5MHz or 53MHz test signal • A=B, A<B, A>B • Continuous or Triggered Pulse • Proto Type 2 layer board • Done by EE support • Checkout since mid Feb • 2 channels, no test circuit • Production Boards • 5 in hand • First board with test circuit • Made minor modifications • Full Quantity (50) available in June – Order this week BPM Upgrade

  5. Filter Module Testing • 1st Prototype from EE Support in February • Miscommunication on how to evaluate two solid state switch candidates • Minimized usefulness of board (2 weeks) • 2nd Prototype from EE Support • Discovered issue with output op amp unable to supply enough current over entire signal range (1 week) • Began “Real Beam” testing at F23 (3 weeks) • Found that gain/attenuation settings needed adjustment • Found large position variations – SW120 & temperature • Decided to make Prototype run of full board (2 weeks) • Analog 2.5MHz and 53MHz paths look fine • Checkout control & test features • Made minor modification to test input signals • Total 2 months over estimated time to produce production boards BPM Upgrade

  6. Filter Board Cartoon Monitor Out (/10) BP Input G=6 Output -22db Gnd LP LP Test Input G=2 G=39 Switch, Op Amp Control Osc Altera Max CPLD 2.5MHz Test Input 53MHz BPM Upgrade

  7. Test Signal Output 53MHz 2.5MHz BPM Upgrade

  8. Beamline BPM Upgrade – Initial Testing • Teststand on 2nd floor Transfer Gallery for initial testing • Full VME system – ppc, echotek, trigger modules, clock prototype • Using Prototype Analog Module • Using R25 diagnostic application • Used to evaluate system performance and digital filter testing BPM Upgrade

  9. Beamline BPM Upgrade – Initial Installation • Have new rack installed at F23 • Split pickup signals to both old and new system • Use for beam commissioning in parallel with old system • Initial installation rack – full infrastructure currently installed (minus required number of filter modules) • Used to evaluate Filter Module prototype Data Logger Fast Time Plot BPM Upgrade

  10. Beam Signal Parameters • Max Echotek input 1.1Vpp • Measurement range requirements +/-15mm • Yields 900mVpp maximum at 0mm (A=B) • Choose to use 700mVpp to give some headroom BPM Upgrade

  11. Arm & Trigger Events BPM Upgrade

  12. Beam Line BPM Upgrade – Requirements Beams Document 1279-v3.3 BPM Upgrade

More Related