An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013 Bond Program Columbia School District

  2. Introductions • Project Scope Review • Project Timeline • Anticipated Work Categories • Bidding Procedures • Project Contacts

  3. Project Scope Review Columbia Central High School (BP 02) • Renovate new 7th/8th grade wing • New addition - Locker Rooms • Administration Renovation / Secure Entrance • Upgrade finishes and replace doors / windows throughout H.S. • New Architectural and Science lab casework • Upgrade Building HVAC and Controls • Upgrade Building Lighting, Fire Alarm, Electrical • Upgrade Technology • Sitework – athletics, parking, bus and parent drop off areas

  4. Project Scope Review Elementary, Intermediate, and Options School (BP 03) • Renovations to accommodate grade level reconfiguration • Administration Renovation / Secure Entrance • Upgrade finishes and replace doors / windows throughout • Renovate toilet rooms • New casework • Upgrade Building HVAC and Controls • Upgrade Building Lighting, Fire Alarm, Electrical • Upgrade Technology

  5. Timeline • Bid Pack 02 – (high school) • Bid Documents Available Week of October 20, 2014 • Bids Due Week of November 17, 2014 • Bid Review / Post Bid Interviews to support 12/1/14 awards • Construction • 7th/8th Grade Wing 12/1/14 – 4/6/15 (Spring Break) • Locker Room Addition Start 3/30/15 • Remaining Building Start After School • All work Substantially Complete First Week September 2015 for School • Bid Pack 03 (Elementary and Middle School) • Start in some areas at spring break (april 2015) • Balance of work in summer 2015

  6. Timeline

  7. Anticipated Work Categories • Demolition • Structural Concrete • Masonry • Structural / Miscellaneous Steel • General Trades • Roofing • Aluminum / Glass & Glazing • Drywall / Acoustical / Plaster • Resilient Flooring and Carpet • Hard Tile • Painting and Coatings • Lockers • Interior & Exterior Signage / Banners • Plumbing • HVAC • Electrical / Fire Alarm • Earthwork and Utilities • Asphalt Paving / Striping • Athletic Surfaces / Equipment • Site Concrete • Fencing • Landscape / Turf & Grass / Plantings

  8. Questions & Answers • Question: Will there be a local preference for the bids?  Answer: No, however the owner has the right to accept or reject any or all offers. • Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can be reviewed on Granger FTP site. • Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages? Answer: Separate packages • Will this be a prevailing rate job? Answer: Yes • Will certified payroll be required?   Answer: Yes • Will a bid bond be required in the amount of 5% be required?   Answer: Yes • Will a performance bond be required?   Answer: Yes

  9. Contact Information Granger Construction Co. Matt Lerg mlerg@grangerconstruction.com Denise Styx dstyx@grangerconstruction.com Website http://restorethesoarwithgranger.com/