FACULTY OF ENGINEERING & TECHNOLOGY
This presentation is the property of its rightful owner.
Sponsored Links
1 / 2

Revision: 3 PowerPoint PPT Presentation


  • 86 Views
  • Uploaded on
  • Presentation posted in: General

FACULTY OF ENGINEERING & TECHNOLOGY. REQUISITION FOR SENDING OUT EQUIPMENT FOR REPAIR ( FLOWCHART ). Doc. No: FET/LMC-02. Version: 1.0. Revision: 3. Effective Date: 10/12/13. Start. 3. Dean approves?. 2. ALO accepts request?.

Download Presentation

Revision: 3

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Revision 3

FACULTY OF ENGINEERING & TECHNOLOGY

REQUISITION FOR SENDING OUT EQUIPMENT FOR REPAIR (FLOWCHART)

Doc. No: FET/LMC-02

Version: 1.0

Revision: 3

Effective Date: 10/12/13

Start

3. Dean approves?

2. ALO accepts request?

1. Requestor fills the information in the form (FA-AD3.2003, obtainable from Intranet) and submit to ALO for verification.

Yes

Yes

4. ALO seeks acknowledgement from Fixed Asset Unit and Security Unit.

No

No

9. Requestor decides to take further action on the vendor – needs to liaise with Faculty.

5. ALO handovers the completed form to the Requestor while copies are made for Fixed Asset unit and Security. ALO email to Dean / LMC Chairman, Lab Engineer, Requestor and respective supervisors on the matter.

No

8. Requestor satisfied with the repair job?

End

6. Requestor proceeds the handover of equipment to vendor for repair.

7. Vendor to return the equipment to requestor after repair.

Yes

Legend:-

ALO: FET Asset Liaison Officer


Revision 3

FACULTY OF ENGINEERING & TECHNOLOGY

SENDING EQUIPMENT FOR OUTSIDE REPAIR REQUISITION (FLOWCHART)

Doc. No: FET/LMC-02

Version: 1.0

Revision: 3

Effective Date: 10/12/13


  • Login