An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PART LProblem or opportunity? Bill Wright Corporate Energy and Environment Manager, John Lewis plc

  2. John Lewis and Waitrose • 27 Department Stores • 179 Supermarkets – and growing • 3 Factories • Farm • Leisure Facilities – including a castle!

  3. ENERGYCOSTS Combined energy bill of over £35M! OUCH!!!!!!

  4. COST OF ENERGY • Over the past three years 100% cost increase • Straight off bottom line • Now a major overhead

  5. CARING FOR OUR ENVIRONMENT D

  6. CARING FOR OUR ENVIRONMENT D 1kwh electricity = 0.43kg CO2 1kwh gas = 0.19kg CO2

  7. CARING FOR OUR ENVIRONMENT D 1kwh electricity = 0.43kg CO2 1kwh gas = 0.19kg CO2 JL Oxford St produces OVER 4000 tons of CO2 each year And JL Victoria produces OVER 3000 tons

  8. OUR AIMS • Build efficiently

  9. OUR AIMS • Build efficiently • Reduce operating costs

  10. OUR AIMS • Reduce consumption • Reduce costs • Reduce emissions

  11. DOCUMENT L2A • Applies to new build • Reduce CO2 emissions • Improve building performance • Provide final user information

  12. SERVICES DESIGN • Design for energy efficiency • Be aware of new regulations • Install meters to enable 90% of energy usage to be monitored. • If over 1000m2 use automatic meter reading

  13. Lighting • Use efficient lighting sources HF ballasts, T5, CDMT spotlights etc • Zone and time controls essential • Assess lighting level required • Use natural daylight where possible • Switch off lights when not required - PIR

  14. ELECTRIC MOTORS • Use efficient motors • Use variable speed drives – WHERE PRACTICABLE • Size motor correctly • ECA list?

  15. BUILDING MANAGEMENT SYSTEMS • Can control all building functions. • Keep it simple! • They are not the answer to everything!

  16. INFORMATION • Estimate power consumption. • Provide customer with good records. • Energy Log Book?

  17. PART L2B • Applies to existing buildings and extensions. • Does not apply if work only involves replacement equipment, or a few additional lights to existing circuits.

  18. CONSEQUENTIAL IMPROVEMENTS! • Applies to building work associated with an existing building over 1000m2 in area. • Improvements to original building of 10% of cost of additional work. • Compliance can be upgrading existing services and / or controls. • Upgrade lighting if necessary.

  19. RENEWABLE ENERGY • Requires renewable energy sources to be considered. • Some local authorities now require a minimum 10% renewable energy sources on site for planning approval. • Difficult to achieve economically

  20. RENEWABLE ENERGY SOURCES • Wind power • Photo-voltaic • Solar Thermal • Ground Source heat pumps • CHP ( Combined heating and power) • Biomass boilers

  21. ECONOMICS • None of renewable sources are truly economic • Assess sources for customer

  22. CONCLUSION • Gain knowledge of Building Regulations requirements • Design accordingly • Be pragmatic • Commission thoroughly all installations • Provide all necessary information. • It is not that difficult!