1 / 21

A&P Fresh Market with UTC Power PureComfort TM 240M

A&P Fresh Market with UTC Power PureComfort TM 240M. Jim Kirk Director of Engineering The Great Atlantic & Pacific Tea Co. Project Team. Facility: 57,000 Sqft A&P Supermarket, Mt. Kisco, NY Project Sponsors: UTC Power DOE/ Oak Ridge National Laboratory Utility: Con Edison.

cleta
Download Presentation

A&P Fresh Market with UTC Power PureComfort TM 240M

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A&P Fresh Market with UTC Power PureComfortTM 240M Jim Kirk Director of Engineering The Great Atlantic & Pacific Tea Co.

  2. Project Team Facility: 57,000 Sqft A&P Supermarket, Mt. Kisco, NY Project Sponsors: UTC Power DOE/ Oak Ridge National Laboratory Utility: Con Edison

  3. PureComfortTM 240M for A&P “Pre-Assembled” Integrated System: • Skid Mounted • 4 - 60 kW microturbines • Gas Compressors • Carrier Double Effect Absorption Chiller • Cooling Tower • Chilled Water Pumping System • Provides 240 kW* of Electricity at 480v and 110 tons of Chilled water (95F day) or 900 MBTU Hot water (32F day) * 240 kW is Gross Power at 59 F, Net Power is 228 kW at 59 F

  4. PureComfortTM 240M Skid Chiller Exhaust / Desiccant Connection Chilled Water Connections Electrical Panels / Pump Controls 60’ Microturbines Chiller 12’ 6” Gas Compressors Chilled Water Pump Station Cooling Tower Exhaust Manifold

  5. PureComfortTM 240M Exhaust Diverter Valve Chiller Enclosure Gas Compressors Exhaust Duct Cooling Tower Microturbines

  6. System Integration System Provides: • 240* kW of Electricity - Grid Parallel - Grid Dependant - Base Load • Chilled Water: - Space Cooling - Refrigerant Sub-Cooling • Desiccant Regeneration: • - Direct Exhaust Heat • Hot Water: • - Winter Operation • - Space Heating * 240 kW is Gross Power at 59 F, Net Power is 228 kW at 59 F

  7. System Integration (Heat Recovery)

  8. System Integration (Electrical)

  9. System Integration (EMS Controls) Controls: • Microturbines, Chiller & Cooling Tower are controlled Via On-Board Controls • Chilled Water Pumps, Bypass Valves & Desiccant Wheel are Controlled Via Building / Refrigeration EMS System (Danfoss AKC-55) • Danfoss System controls Bypass Valve via two algorithms (Summer & Winter). A Manual Switch is used change from Summer to Winter Mode of Operation • Sub-cooler solenoid valves are “always on” in Summer Operation • Danfoss System Provides “Chiller Run” Input Only • Heating, Cooling & Desiccant have “redundant” Systems

  10. System Installation (Roof Top) Chilled Water Supply / Return Refrigeration Sub-Cooling Pre-Fabricated Refrigeration Penthouse Water Coil Desiccant Exhaust Manifold Munters HVAC PureComfort 240

  11. System Installation (Roof Top) Refrigeration Condensers Desiccant Duct Munters HVAC Chilled Water Pipes to Refrigeration Sub-Coolers Screening Pure Comfort System

  12. System Installation • Challenges • Site Required a Roof Top Installation • Weight of System Required Additional Steel Support • Location / Pre-Fabricated Weight Required 600 ton Crane to Install • Pre-Fabricated Size Of System Required Special Permitting for Delivery (Over Width & Over Height) • Mechanical / Electrical Engineers not Familiar with Technology • Utility not Familiar with Technology

  13. System Installation • Benefits of Pre-Fabrication • Quality Control – Assembled in Controlled Environment • Simplified Installation: Seven Point Connection • Chilled Water Supply & Return • 400 amp 480v • High Natural Gas (5 PSI) • Make up water • Tower / Chiller Drain • Exhaust Duct to Desiccant • Phone Line • Less Design Required by Local Project M/E Engineers • Very Accurate Documentation for Utility Interconnection Applications • Faster Start-up & Commissioning

  14. System Installation (Costs) • Cost UTC PureComfortTM 240M $500K* Coil In Munters Unit $8K Steel $55K Crane $37K Electrical $27K Plumbing $50K Desiccant Ducting $8K GC Management $14K Total:$699K $2,900/kWe Installed * Pre DOE Funding

  15. System Installation (Costs) What Could We Do Better Next Time? Put It On The Ground!Remove Redundant Systems! • Cost UTC PureComfortTM 240M $475K* Coil In Munters Unit $8K Removing Redundant Mechanical Systems (Munters) - $25K Steel $55K Crane $37K Electrical $18K Plumbing $50K Desiccant Ducting $28K GC Management $10K Total:$564K $2,350/kWe Installed * Pre DOE Funding

  16. System Inst. (Utility Interconnection) Utility Interconnection: • Was Not an Issue! • Turbines are NY State Type Tested and Approved for Interconnection • NY State Law Forces Utilities to accept Standard Type Tested Interconnection • Hardest Part was Getting to “the Right Person” within the Utility and “Educating” them about the System. • Overall Application and Approval Process was very Simple • Did Not Cause Any Delay or Additional Expense for Project

  17. System Installation (Commissioning) Commissioning: • A Problem Develops: • Turbines will not automatically re-start in “multi – pack mode” • Turbine Software found to be the problem • Software has to be NY State Approved • Delayed System Interconnection test three weeks That Was the Only Real Problem!!

  18. What’s the Bottom Line? Reduced Energy Costs! Great PR! Estimated Annual Avoided Energy Loads & Cost Gas = $0.69/therm & Grid Electric at $.13 kWh *Maintenance costs not included

  19. Things To Consider: • Local Utility Costs (Can you do it cheaper?) • Can You Use The Chilled Water? • Is High Pressure Gas Available? • Local Interconnection Regulations? • State Law? • Local Utility Control? • What are The Requirements? • Can You Get It There? (Permit Issue)

  20. Would We Do It Again? Yes!

  21. Jim Kirk 470 Chestnut Ridge Road Woodcliff Lake, NJ 07677 (201) 571-4865 Jkirk@aptea.com For More Information: Tom Coulbourn 2300 Westmoreland Street Richmond, VA 23230 (804) 678- 5307 www.utcpower.com

More Related