Klicken Sie, um das Titelformat zu bearbeiten. Worldwide Competence in Plastics Tunnel Engineering. Klicken Sie, um das Format des Untertitelmasters zu bearbeiten. AGRU Kunststofftechnik GmbH Ing.-Pesendorfer-Str. 31 4540 Bad Hall Österreich. 1. Introduction. • Tunnel construction are

Download Presentation

Klicken Sie, um das Titelformat zu bearbeiten

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Klicken sie um das titelformat zu bearbeiten

Klicken Sie, um das Titelformat zu bearbeiten

WorldwideCompetence in Plastics Tunnel Engineering

Klicken Sie, um das Format des Untertitelmasters zu bearbeiten

AGRU Kunststofftechnik GmbH

Ing.-Pesendorfer-Str. 31

4540 Bad Hall

Österreich

1


Klicken sie um das titelformat zu bearbeiten

Introduction

• Tunnel construction are

built for a life

expectancy of 100 years

• The requirements are similarly high,

particularly those on the sealing system

• From the raw material till to the

finished Waterproofing Installation

- it is a question of Quality


Klicken sie um das titelformat zu bearbeiten

for a life expectancy

of 100 years

Function

of a sealing membrane

• keep the water away from the structure or out of the inner working area

• protect and assure the concrete contruction against the corrosive, chemical components of the groundwater


Klicken sie um das titelformat zu bearbeiten

Requirements to the sealing system

  • watertight

• repair ability (injection)

• resistance against chemical components

• weldable by thermal means (hot air)

• safe and economic inspection for damages

(built with a very thin signal layer on one side)

• flexible, elastic ( bridge crack formations without

loosing its functioning capacity, pressure of the fresh

concrete, hydrostatic pressure, creep, temperature,

increase of tension, etc.)


Klicken sie um das titelformat zu bearbeiten

Material and Funktion of AGRU Tunnel Membranes

• made of very flexible Polyethylene

• high degree of flexibility

• high stretching resistance in multiaxial directions

• high resistance against tension tears

• high degree of resistance to chemicals

• suitable for drinking water (water protection area)

• with signal layer

• various thicknesses

• tested and approved according to the

requirements of DS 853, ZTV- Ing

and other technical specifications


Klicken sie um das titelformat zu bearbeiten

Structural design of DS 853

Fundamental differences are made in

underground construction work in

rock, between sealing against

pressurised water and against seepage water

• for seepage water a 2.0 mm thick membrane

• for pressurised water a 3.0 mm thick membrane

• in each case provided with a signal layer


Klicken sie um das titelformat zu bearbeiten

Aging of Polyethylene

Lifetime of AGRU PE Membranes


Lifetime expectation of agru tunnel membranes

Lifetime Expectation of AGRU Tunnel Membranes

  • Test Results:

Test according EN 13438 („Autoklav “)BAM


Klicken sie um das titelformat zu bearbeiten

PVC

VLDPE/ LLDPE/ FPO

For production of PVC, plasticisers are added to the vinyl chloride by a physical process (physical conjunction

"external plasticising", the flexibility of the basic material is created by adding of plasticisers to the molecule chains).

--------------------------------------------------------------------

By burning or welding, PVC causes fumes, those contains hydrochloric acid; this can lead to cauterisations of the respiratory tract; scaffolds and machines made of carbon steel begin to corrode.

----------------------------------------------------------------------

limited resistance to chemicals, depends on the composition and the temperatures

-----------------------------------------------------------------------

ageing by loss of plasticisers after thermal and/or chemical stress and as a result strong reduction of the flexibility (mono-axial and biaxial elongations are massively reduced).

mass extraction (wash out) in the event of strong water flow and water circulation

the combination of chemical compounds of ethylene copolymers (CO monomers) of varying flexibility (internal plasticisers) provides the flexibility of the basic material.

without plasticisers: do not contain any volatile or extractable components (mass extraction).

------------------------------------------------------------------

the incineration of PE does not cause any contaminants which could be hazardous to the environment

------------------------------------------------------------------

very high chemical resistance and high resistance to aggressive water

------------------------------------------------------------------

no extraction of components out of the geomembrane in the event of strong water flow and/or water circulation (internal/chemically linked plasticising)

Comparison of LLDPE (VLDPE, FPO) vs PVC for Tunnels

Source: Tiefbau 2/1999, Kunststoffe- Plastics 4/1981, Die Kunststoffe und ihre Eigenschaften (4. Auflage)/ VDI Verlag, Tunnel 2/99


Klicken sie um das titelformat zu bearbeiten

VLDPE, FPO/TPO and PVC-P are suitable Materials.

Required Conditions for Durability are proper Formulations and professional Installation (Welding)

Project Engineers shall consider by choosing the material following facts

Long Term Water Pressure

Long Term Temperature Conditions

Composition of in situ Water

Intensity of Water Streams have to be considered

Agru Liners of VLDPE, FPO/TPO fulfils all Requirements

Liners of PVC-P are limited to Temperatures less 20°C, low water pressure Conditions without any agressive water contents

Conclusion


Klicken sie um das titelformat zu bearbeiten

Blast Construction

(with Shotcrete)

Open Construction

Tübbingconstruction

(TBM)

Seepage water

Pressure water

Seepage water

Pressure water

Seepage water

Pressure water

partly drained

undrained

drained

Umbrella seal

With drain system

Without drain system

Full Round

Without drain system

Full Round

With drain possibility

Without drain possibility

Tunnel Systems


Klicken sie um das titelformat zu bearbeiten

Tunnel Systems

  • Umbrella- seal

  • shotcrete

  • - geotextile

  • - membrane (2,0 mm)

  • - concrete

  • Full-round seal (360°)

  • shotcrete

  • geotextile

  • membrane (3,0 mm)

  • - protection concrete/ membrane

  • - concrete


Klicken sie um das titelformat zu bearbeiten

Inner Concrete shell

Injektionplate

Agruflex 2.5 mm

Geotextile

Drainmat

Shotcrete

Horizontal Casting Joint

Casting joint

Water stop 500/30/6

Protection Liner > 2mm

Drainage Pipe

Injektionplate

Cut view on Tunnel for pressure Water Application


Klicken sie um das titelformat zu bearbeiten

Injectionplate

Protection Liner

Injektionhose

Hose Connector

AGRUFLEX 2.5 mm

Partial fixation

Geotextile

200 mm

Shotcrete

Injektionplate for subsequent Defects


Klicken sie um das titelformat zu bearbeiten

Partitioning of Casting Joints

Schematic Tunnel Design for

Casting Sections


Klicken sie um das titelformat zu bearbeiten

Bottom Section Installation


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

Front: Geotextile, mounted to the shotcrete surface

Back: Scaffolding for the installation of the AGRU TunnelLiner


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

Installation of the AGRUFLEX VLDPE Liner by manual hot air welding


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

Installation of the AGRUFLEX VLDPE Liner by manual hot air welding


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

Seaming of the AGRUFLEX liners by hot wedge welding (double seam )


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

The hot wedge welding method creates a double welded seam and a air pressure test channel.

This test channel enables to test the integrity of each single weld.


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

Installation of the Block joining profile (water stop) by hot air welding

in the bottom section of the tunnel


Klicken sie um das titelformat zu bearbeiten

  • PE80/PE100-Pipe Systems

  • Solid and Drainage Pipes

  • Projekt relevant Dimensioning acc. ATV

  • Drilled or slotted: full round or 2/3

  • Bright Inner surface due to Coextrusion

  • Electro fusion Fittings for traceable Welding Performance

PE Drainage Pipe System


Klicken sie um das titelformat zu bearbeiten

Innovation

Semi Automatic Installation Scaffolding

  • Liner Attachement:

  • Velcro System

  • Hot Air Bonding

  • Hot Melt Bonding

  • (at Tübbing Construction)


Innovation

AGRU Easy-Fix Systemc

Advantages

  • 2,0m to 4,0m Liner width

  • No negative influence to the mechanical properties of the liner due to laminated Geotextile „Hot Melt-Application“

  • fixation by:hook & loop (velcro)

  • hot air (Semi Automatic Scaffolding)

  • hot melt (Semi Automatic Scaffolding)

  • choice of applying various Geotextiles with

  • different weights

Innovation

Bonding strength test


New technology

AGRU Easy-Fix System-Velcro

New Technology

Installation of tunnel liner by means of Velcro discs


Klicken sie um das titelformat zu bearbeiten

AGRU Easy-Fix System-Velcro

Installation of tunnel liner by means of Velcro discs


Klicken sie um das titelformat zu bearbeiten

AGRU Easy-Fix System-Hot Air or Velcro


Klicken sie um das titelformat zu bearbeiten

AGRU Easy-Fix System-Hot Air or Velcro


Klicken sie um das titelformat zu bearbeiten

AGRU Easy-Fix System-Hot Air or Velcro

Installation of tunnel liner by means of Hot Air fusion


Klicken sie um das titelformat zu bearbeiten

AGRU Easy-Fix System-Hot Air or Velcro

Crossway Section


Klicken sie um das titelformat zu bearbeiten

Referenceproject:

Schlossbergtunnel

Dillenburg/D

Hot Air Technology

AGRU Easy-Fix System-Hot Air or Velcro


Klicken sie um das titelformat zu bearbeiten

Agru Waterstop Profile

AGRU Waterstop SAA 500/6

The waterproofing of tunnel constructions is essential for the service life of the whole structure.

Modern tunnel insulations are designed to offer a possibility for repair of hollow spots or untight areas with special injection resins.

At casting joints of the inner Concrete shell waterstops are installed to create separated compartments. Integrated injection hose clamps with injection outlets at certain distances provide defined injection of resin at repair sections.

The AGRU waterstop SAA 500/6 is designed for perfect anchoring of the sealing-webs to withstanding highest backpressures.

Fulfills all requirements acc. DIN 18197, DIN 18541,EAG EDT

Innovation


Klicken sie um das titelformat zu bearbeiten

Conventional Installation

  • Taiwan High Speed Rail Project

  • Linkou Tunnel/ Los 210

Dipl.- Ing. S. Lemke


Klicken sie um das titelformat zu bearbeiten

Conventional Installation- Linkou Tunnel


Klicken sie um das titelformat zu bearbeiten

Conventional Installation- Linkou Tunnel


Klicken sie um das titelformat zu bearbeiten

Reference Project

Melbourne Tunnel Australia


Klicken sie um das titelformat zu bearbeiten

AGRUSAFESure Grip System

Telescope –Formwork technique 330° Lining

Agrusafe Sure Grip

Concrete Protection Liner

Alternative Lining System

For Sewer Tunnels


Klicken sie um das titelformat zu bearbeiten

AGRUSAFESure Grip System

Cut and Cover Tunnel 360° Lining


Klicken sie um das titelformat zu bearbeiten

AGRUSAFESure Grip System

330° Lining with 6,0m Diameter


Klicken sie um das titelformat zu bearbeiten

AGRU Tunnel Innovations

Polyolefin based Materials

Liner width up to 4m

optimizes your Installation methodes

all water stop profiles can be equipped with integrated prophylactical Injektion Hoses

mechanical-integrated Corrosion Protection

of the Concrete at Sewer Tunnels

Conclusion

Lifetime Expectation

> 100 Years


Klicken sie um das titelformat zu bearbeiten

Agru Geomembranes – Various Applications

Landfill Capping

Artificial Snow Production Reservoir

Canal Sealing

Heap Leach pads in the Mining Industry


Klicken sie um das titelformat zu bearbeiten

Agru Geomembranes – Various Applications