1 / 10

Metropolitan Growth: Urban, Suburban, Rural Interfaces Colorado Water Workshop 7/19/13

Metropolitan Growth: Urban, Suburban, Rural Interfaces Colorado Water Workshop 7/19/13. Denver Basin Aquifer System Estimated 259 MAF Recoverable Water --BUT--. “ It was the best of times. It was the worst of times ”. “ It was the spring of hope. It was the winter of despair ”.

cleary
Download Presentation

Metropolitan Growth: Urban, Suburban, Rural Interfaces Colorado Water Workshop 7/19/13

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metropolitan Growth: Urban, Suburban, Rural Interfaces Colorado Water Workshop 7/19/13

  2. Denver Basin Aquifer System • Estimated 259 MAF Recoverable Water • --BUT--

  3. “It was the best of times. It was the worst of times”

  4. “It was the spring of hope. It was the winter of despair”

  5. Prairie Waters Project • Began delivering water in October 2010 • Current capacity of 10,000 AFY • Expandable to 50,000 AF with additional infrastructure • 34-mile pipeline with 3 pump stations • Multi-barrier state of the art treatment process • $800 million in infrastructure

  6. “We had everything before us. We had nothing before us.”

  7. WISE Water Supply Benefits • SMWSA • Renewable supply for SMWSA • Allows use of Denver Basin aquifer for drought supply • Denver Water • Drought and emergency supplies for Denver • Aurora Water • Continued use of PWP for drought supply • Offset PWP costs Total Affected Population = 2 million

  8. Questions?

More Related