An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONTROL BOX RMG88.620

  2. GS SERIES ONE STAGE TWO STAGE GAS SERIES ONE STAGE TWO STAGE RS SERIES ONE STAGE TWO STAGE Dedicated to: Gas burners

  3. Mode operation………….…... Intermittent Intermittent Main voltage…………….…... AC 220-240 V +10% -15% AC 100-120 V +10% -15% Frequency…………….…... 50-60 Hz +/-6% 50-60 Hz +/-6% Under Voltage protection…... Approx. AC 170 V Approx. AC 70 V Primary fuse…………….…... Max 16 A Max 16 A Power consumption……..…... 20 VA 20 VA Internal fuse…….……..…... T6.3H250V (IEC 127-215) T6.3 Polarity...………….……..…... Must be observed (checked) Must be observed (checked) Voltage at ionization probe.…. AC 115-230 V AC 50-120 V  1.5 A (pre-purge) 3 A (operation)  1.5 A (pre-purge) 3 A (operation) Flame signal (current ioniz.)…. MODELS FEATURES RMG88.620A2RL RMG88.620A1RL

  4. Waiting time………….…... 2 sec………………………….. Beginning when both # 4 & # 9 are energised. If not input to # 4 within 60 sec since # 9 is energised  lock out Checked Pre-purge time (min).. 40 sec (55sec on A1RL type)... Time between no voltage at # 4 (P.switch at working position) and both # 12 and # 13 output Max time for the air P.Switch to change……... 10 sec Post-ignition time……….…... 2 sec Ignition safety time……..…... 3 sec Interval 1st  2nd stage..…... 10 sec…………………………. Interval between # 12  # 14 outputs Voltage at # 3 …….………. . 25 sec…………………………... to manage aservomotor RMG88.620A2RL RMG88.620A1RL Timings of cycle NOTES

  5. CONTROL PROGRAM IN EVENT OF FAULT

  6. INDICATION OF OPERATION

  7. SELF-DIAGNOSTIC Operating concept · Burner control has initiated lockout Þ Red fault LED on · Reset Press lockout reset button for about 1 s · Diagnosis of cause of fault – Press lockout reset button for > 3 s – Press again lockout reset button for > 3 s – Read blink code of red fault LED Þ «Error code table A»

  8. Error code table A Blink code Possible cause 2 x ··· No establishment of flame at the end of «TSA» – Faulty or soiled detector electrode – Faulty or soiled fuel valves – Poor adjustment of burner – Faulty ignition equipment 3 x ···· Faulty air pressure monitor – «LP» faulty – «LP» incorrectly adjusted – Fan motor does not run 4 x ····· Eextraneous light on burner startup 7 x ········ Loss of flame during operation – Poor adjustment of burner – Faulty or soiled fuel valves – Short-circuit between detector electrode and ground 10 x ·········· · Wiring error or internal fault, output contact, unidentifiable fault, e.g. faults that occurred simultaneously