LS1 & Buildings 115, 507 and 601. Building 601 . Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed by the users All electrical cabinets and distribution have been removed (recuperated)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' LS1 & Buildings 115, 507 and 601' - clara


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Building 601
Building 601

  • Building 601 (kitchen & entrance):

  • Power has been cut and disconnected (Patrick Gallay EL)

  • All items removed by the users

  • All electrical cabinets and distribution have been removed (recuperated)

  • Tourniquet has been removed and is stored for later use in 508 (Nino Rama)

  • Preparation finishing for the desamiantage – treatment of the asbestos parts in roof and floor


Desamiantage bat 601 finished
DesamiantageBat 601 finished


Building 115
Building 115

  • Power has been cut and disconnected (Patrick Gallay EL)

  • All items (Solid State Lab) have been removed by the users – checked by RP

  • Workshop machines have gone into storage

  • All electrical cabinets and distribution have been removed (recuperated)

  • Airco units have been recuperated (users)

  • Remaining the fiber optics connection: To be disconnected (after desamiantage)

  • De-classification (Class C) done by RP (AlexandreDorsival, ChristelleSaury, MatthieuDeschamps) – paperwork to be finished

  • Gas bottles in the gas point to be removed





Desamiantage bat 115 finished
DesamiantageBat 115 finished


Building 507
Building 507:

  • Power has been cut and disconnected (Patrick Gallay EL)

  • All items (Laser Labs) have been removed by the users – checked by RP

  • All electrical cabinets and distribution have been removed (recuperated)

  • Signal cabling to be pulled back into the hall for later use in the new 508 (GeorgieGeorgiev EL)

  • (unfortunately some signal cables got unforeseen cut from the Collaps Lab side)

  • Water has been cut upstream (Isolde water station) but there is a leak on the valve – to be changed before demolishing starts

  • De-classification (Class C) will start


Recuperation electrical cabinets and power outlets
Recuperation: electrical cabinets and power outlets


Signal patch panels in 507 to be removed recuperated
Signal patch panels in 507 to be removed &recuperated.

  • Cables will be pulled back into the hall to be reused in 508 (ongoing):



Access
Access ladder.:

  • Temporary access by card reader on the hall 170 door has been put in place (with buzzer 10 min) (Nino Rama & team) – ok with RP

  • Existing staircase from Rue Democrite will be re-used during work on the site.

  • Fencing in place to separate access site from construction site

  • Building 170:

  • New access stairs have been put in place to replace the ladder. They will give safe and easier access to the to be installed barrack on the 170 roof for released air measurements (Daniel Parchet)



New access
New Access ladder.

  • Access via old existing staircase (leaves and fence have been removed now). Access area blocked off from work site. Card reader on the Isolde hall door:


Situation
Situation ladder.


Situation with respect old buildings
Situation with respect old buildings ladder.

BottomFloor: 450 m2

Top Floor: 250 m2


Bulding ladder. 508 / BottomFloor I

COLLAPS

LASER LAB

COLLAPS CONTROL ROOM

SSP Laser Laboratory

Access ISOLDE Hall

Classified C

Chemicalstore

Chemicallab

PAC

66 m2


Bulding ladder. 508 / BottomFloor II

CRISLASER LAB

Detector Laboratory

CRIS

LASERControl Room

Workshop

26 m2

EmisssionChanneling

Diffusion

Meas.

Vibrations

Isolated

Access tothepublic


Building 508 part i
Building ladder. 508 / part I

View tothe ISOLDE Hall

Office

19 m2

VISITORS ROOM

68 m2

Office

19 m2


Building 508 part ii
Building ladder. 508 / part II

Toilets

men

Kitchen

19 m2

DAQ Room

28 m2

Toilets

Women


Planning
Planning ladder.

  • Asbestos: Desamiantage of bat 601 and 115 finished 5 July 2013

  • Inspectionof buildings: VIC nextweek

  • Demolition: 14th July – 5th of August

  • Drains and waternetworks: 5th August – 31st of August

  • ConcretGround : September – Mid-October

  • Mounting Modules : November

  • MISSING for 2014: Electricity

    Water

    Air conditioning

    Opticalfiber

    Computernetwork


P lanning
P ladder.lanning