An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status KHuK, Bad Honnef, 9/12/11

  2. Erster Geburtstag Unterzeichung des völkerrechtlichen FAIR-Abkommens am 4.10.2010 in Wiesbaden durch die GründungsländerDeutschland, Finnland, Frankreich, Indien, Polen, Rumanien, Russland, Slowenien, Schweden KHuK, Bad Honnef, 9/12/11

  3. FAIR GmbH KHuK, Bad Honnef, 9/12/11

  4. FAIR-Forschungsabteilung KHuK, Bad Honnef, 9/12/11

  5. FAIR-Projektstruktur FAIR Council SC AFC Project Steering Board IKRB Chair: FAIR Scientific Director MAC BFC Project Lead FAIR Technical Director PMO Subproject Experiments Subproject Accelerators Subproject Site & Buildings Chair All Accelerators Board FAIR Director Site & Buildings FAIR Research Director ACC PO S&B PO EXP PO ECE APPA CBM NuSTAR PANDA SIS100 CR HESR CommonSystems o o o o Experiment Coordinators FAIR – S&B GSI GSI FZJ GSI KHuK, Bad Honnef, 9/12/11

  6. FAIR-Anlage CBM APPA Super-FRS PANDA NuSTAR KHuK, Bad Honnef, 9/12/11

  7. Beschleuniger Kompakt& kosteneffektiv SupraleitendeMagnetedB/dt~ 4T/s HoheStrahlqualität Elektronen& stochastischeKühlung XHV @ HoherStrahlintensität Hochvakuum~10-13 mbar SchnelleBeschleunigungFerrit& MA KavitätenGroßer Gradient, variable Frequenz KHuK, Bad Honnef, 9/12/11

  8. Anti-Proton Annihilation @ DA PANDA KHuK, Bad Honnef, 9/12/11

  9. Compressed Baryonic Matter SIS100/300 KHuK, Bad Honnef, 9/12/11

  10. NuSTAR KHuK, Bad Honnef, 9/12/11

  11. APPA: Paritätsverletzung Energy levels of He-like uranium 2E1 (PNC) g N N N N e e Z e e Mixing coefficient for states with opposite parities: To “compete” with spontaneous decay channels one needs to induce a two-photon PNC transition by polarisedlight with intensity 1020 W/cm2 Select case with small splitting! KHuK, Bad Honnef, 9/12/11

  12. APPA: Plasmen Inertial Fusion Energy Magnetic Fusion Temperature [eV] XFEL Sun Core PHELIX SIS 100 Laser Heating FLASH Ideal plasmas Ion Beam Heating Strongly coupled plasmas SIS 18 Jupiter solid state density Sun Surface Particles / cm-3 KHuK, Bad Honnef, 9/12/11

  13. Stufenweiser Aufbau 2017/18 KHuK, Bad Honnef, 9/12/11

  14. Modularisierte Startversion M0 M3 M1 M3 M2 CBM/HADES APPA Experimente M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA PANDA NuSTAR KHuK, Bad Honnef, 9/12/11

  15. Kosten MSV in 2005 € (Inflation bis 2018 ca. +50%) * Gesamtkosten Experimente (ausschließlich Super-FRS):ca. 210 M€ (2005) = 315 M€ (2018) KHuK, Bad Honnef, 9/12/11

  16. ZeitlicherAblauf 2011 2012 2013 2014 2015 2016 2017 2018 2019 9 11 12 6 7 8 10 Bauanträge Baustelleneinrichtung AusschreibungenBau Bau der Beschleuniger- und Detektorkomponenten FertigstellungRohbau Installation Beschleuniger und Detektoren Datennahme 10 6 7 12 8 9 KHuK, Bad Honnef, 9/12/11 11

  17. ZeitlicherAblaufExperimente • Beendigung F&EPhase • Entscheidungenbzgl. technischerAlternativen • Bau von PrototypenallerwesentlichenDetektorteile • Einreichung “Technical Design Reports” • Evaluation durch “Expert Committee Experiments” • Koordinationmit • Bau • Beschleunigern • Identifikation von kritischenPunkten • Meilensteine • Zeitabläufe • Ergebnisse • Erstellung von Risiko-Management-Plänen • Sicherung der Drittmittelförderung 2012 • Einreichung der Konstruktions-MoUs Ende 2012 KHuK, Bad Honnef, 9/12/11

  18. ZeitlicherAblaufExperimente • (Europaweite) Ausschreibungen 2013 • Bau der Detektoren 2013-16 • Einreichung der Betriebs-MoUs 2016 • Einfahren der Experimente 2017/18 • ErstePeriodeDatennahme 2018-21 KHuK, Bad Honnef, 9/12/11

  19. Probebohrungen 31.8.11 KHuK, Bad Honnef, 9/12/11

  20. Baufeldfreimachung 6.12.11 KHuK, Bad Honnef, 9/12/11

  21. Freiflächenplanung Integration in das Landschaftsbild Fließende Geländeanschlüsse Park- und Waldelemente Anlehnung an nahe Naturdenkmäler Retention / Versickerung Dachbegrünung Fassadenbegrünung KHuK, Bad Honnef, 9/12/11 21

  22. Vielen Dank! KHuK, Bad Honnef, 9/12/11