1 / 46

CHAPTER 9 MATERIAL MANAGEMENT

CHAPTER 9 MATERIAL MANAGEMENT. Demeulemeester Yves BR3 Dismantling project SCK•CEN. Work Organization. Dismantling. Cutting. Sorting. Identification. Temporary storage. Treatment. Characterization. Evacuation. Objective. Traceability of material from production to removal

ciara
Download Presentation

CHAPTER 9 MATERIAL MANAGEMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHAPTER 9MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCK•CEN

  2. Work Organization Dismantling Cutting Sorting Identification Temporary storage Treatment Characterization Evacuation

  3. Objective • Traceability of material from production to removal From the point of view of external services • Asked by the regulatory authority • Information flow between the operator and the contractant (others services)

  4. Traceability From the point of view of the operator: • Improvement of decommissioning experience • Allow the right treatment process in function of type of material or component • Allow the right evacuation route in function of the history of the material • Allow the calculation of decommissioning cost

  5. Tools • History of the plant • Inventory of material (components, circuits and building) • Database • QA program related to material and waste management • Specific tools (weighting pallet jack, drum scanner, sticker)

  6. Working methodology followed during the actual dismantling

  7. REMOVAL ROUTES BR3

  8. DISMANTLING • Using different techniques • Thermal cutting techniques • Mechanical cutting techniques • Hydraulic cutting techniques • More details: Chapter 11

  9. DISMANTLING methodology – BR3 • Contaminated pieces • Cut into large pieces on place • Further cutting into smaller pieces in ventilated cutting booth • Radiological reasons • Better place to use thermal techniques • Activated pieces • Under water • PWR design

  10. DISMANTLING methodology – BR3

  11. Creation of “batches” • Batch : Group of materials that will follow the same removal route • A batch can be: • 300 l container • 200 l drum • 400 l drum • Single large piece e.g. a reservoir • Every batch carries a unique label • unique number • content of the batch

  12. Identification of a BATCH at BR3 • Description • Dismantling instruction • Inventory records • Loop, pieces of … • Dimensions - diameters • Type of material (stainless steel, carbon steel, painted …) • Origin (area, place in area…)

  13. Batch types at BR3 200-l drum Single piece 300-l container

  14. Storage • Mostly not foreseen for the exploitation • Need of extra buildings or storage places on site during decommissioning

  15. Examples External storage (BR3) Internal storage (BR3) Interim Storage North (Greifswald)

  16. Treatment • Mostly decontamination • Mechanical methods (e.g. sandblasting, scabbling) • Chemical methods • See Chapter 10

  17. Radiological Characterization • Waste and melting • Easy detectable isotopes: γ-spectroscopy • Difficult detectable isotopes: isotope vector and radiochemical analysis. • Unconditional clearance • Surface measurements (Bq/dm²) • “Mass” measurements (Bq/g) • Techniques and equipments • See chapter 8

  18. Radiological Characterization • Unconditional clearance methodology at BR3 • Producer suggests the characterization methodology to be used • Health Physics and Authority approve it • Try to find standard methodologies

  19. Classic “characterization” • After nuclear clearance looking at the classical safety aspects of the material • Asbestos • Heavy metals (Pb, Hg, …) • Oils and greases • TL-tubes • … • National (and or Regional) regulations

  20. Example: High activated internals • Dismantling: mechanical techniques (circular and band saw) under water • Characterization • Sampling: swarfs • Radiochemical analysis → isotope vector • Removal • Special racks • 400-l drum

  21. Example: High activated internals • 49 transports • 118.3 tons of metal • 14.7 TBq

  22. Example: High activated internals

  23. Example: High activated internals

  24. Example : Asbestos • Specialized firm • Unable to decontaminate • Removed as radioactive waste (compressible waste) • 286 200-l drums • 13.2 tons

  25. Example : Asbestos

  26. Example : Asbestos

  27. Example: Turbine shaft • One piece removal • Decontamination: CO2-blasting • 1 measurement with ISOCS

  28. Example: Turbine shaft

  29. Example: Encapsulated lead • Lead from a shielding wall • During the melting taking of samples • Radiochemical analysis • Around 40 tons

  30. Example: Encapsulated lead

  31. Example: Encapsulated lead

  32. Example: Encapsulated lead • Video

  33. Data acquisition The content of a batch, its status and its location must be known at each moment… • All relevant information is on a label • All this information is put into a database including the location of the batch Implementation of a Quality Assurance system

  34. Evacuation of Radwaste

  35. Evacuation of Free released materials

  36. Evacuation to Melting Facility

  37. AFTER EVACUATION • UPDATING DATABASE • UPDATING INVENTORY’S RECORDS

  38. DATABASE

More Related