TEKNOLOGI TENAGA PERLIS CONSORTIUM SDN BHD. Selamat Datang STEAM TURBINE INTRODUCTION. 13 Oktober 2009. AGENDA. Pengenalan Diri Pengenalan Perlis Power Plant Concept / Background Main Design Group. Pengenalan. Abdul Malik Bin Abdul Rahman Operations Manager, Perlis Power Plant

Download Presentation

13 Oktober 2009

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


13 oktober 2009

TEKNOLOGI TENAGA PERLIS CONSORTIUM SDN BHD

Selamat Datang

STEAM TURBINE INTRODUCTION

13 Oktober 2009


Agenda

AGENDA

  • Pengenalan Diri

  • Pengenalan Perlis Power Plant

  • Concept / Background

  • Main Design Group


Pengenalan

Pengenalan

  • Abdul Malik Bin Abdul Rahman

  • Operations Manager, Perlis Power Plant

  • Background: BSc Chemical Engineering

  • Experience: Fatty Acids Production(Palm Oil), Engineering Plastics(Monomer), Power Generation


Perlis power plant

Perlis Power Plant

  • 650 MW Combined Cycle Gas Turbine (CCPP)

  • 3 x ALSTOM GT13E2

  • 1 x ALSTOM ST

  • 3 x ALSTOM HRSGs

  • Contributes 4% of the total electricity generation of the Malaysian peninsular


Perlis ccpp

Perlis CCPP

  • Power Block

  • 650 MW Site Rated Combined Cycle Power Plant (CCPP)

  • Three Dual Fired Alstom 143MW GT13E2 and Three Dual Pressure HRSGs

  • One 221MW Steam Turbine

  • Step Up Transformers ( 4 units; 2x132kV and 2x275kv)

  • Balance of Plant (BOP)

  • Demineralized Water Treatment Plant (2 x 100%)

  • Gas Dew Point Heaters (2 x 50%)

  • Emergency Diesel and Black Start Diesel generators

  • Cooling Towers

  • 2 x 13,500 m3 Oil Tanks and 3 Water Storage Tanks


Basic combined cycle gas turbine power plant ccgt provide efficiencies up to 60

Basic Combined Cycle Gas Turbine Power Plant (CCGT) Provide Efficiencies up to 60%

Cooling

Water

Gas or Oil

Supply

Air

Supply

Steam

Turbine

Generator

Steam

Electrical

Output

Electrical

Output

Heat Recovery

Steam Generator

(HRSG)

Condensate

Condenser

Generator

Gas

Turbine


Water steam cycle

Water Steam Cycle


Concept

Concept


History

History

  • 1st Century - Hero of Alexandria in Roman Egypt

  • 1551 - Taqi al-Din in Ottoman Egypt, who described it as a prime mover for rotating a spit

  • 1648 - by John Wilkins

  • 1660 – by Samuel Pepys

  • 1629 - Italian Giovanni Branca

  • 1884 - The modern steam turbine was invented in 1884 by the Englishman Sir Charles Parsons, whose first model was connected to a dynamo that generated 7.5 kW of electricity


Steam turbine

Steam Turbine


Steam turbine1

Steam Turbine


Steam turbine types

Steam Turbine Types

1- Straight Condensing turbines which allow steam to expand to the lowest possible pressure before it is condensed into water.

2- Back-pressure and topping turbines in which steam is exhausted before it is fully expanded. Generally, provide low pressure steam for heating or process.

3- Extraction turbine in which steam is extracted (controlled or uncontrolled) during the expansion process for use in othe application such as district heating.


Technical data

Technical Data


Hp turbine

HP Turbine


Lp turbine

LP Turbine


Lp turbine1

LP Turbine


Condenser main view

Condenser – Main View


Condenser view from turbine

Condenser – View from Turbine


Condenser top view

Condenser – Top View


Gland steam condenser

Gland Steam Condenser


Lube and control oil block

Lube and Control Oil Block


Sunrise on 31 march 2003 ready for commercial operation

SUNRISE ON 31 MARCH 2003 READY FOR COMMERCIAL OPERATION