An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Running an arch in situ ACA D Winchester

  2. A opening was made to allow access to the new study ACA D Winchester

  3. A opening was made to allow access to the new study ACA D Winchester

  4. Plasterboards were fixed over the wall area The width of the opening was drawn on the surface of the plasterboard Using a piece of string and a pencil The arch was spun from the centre point ACA D Winchester

  5. Using a pad saw the arch was carefully cut out ACA D Winchester

  6. Plasterboards have been fixed to the inside of the arch A coat of thistle bonding has been applied to level up the board, and marry into exiting plaster surface Thin coat beads fitted to the arris ACA D Winchester

  7. A coat of finishing plaster has been applied • The surfaces have been married together ACA D Winchester

  8. Top of the arch R=14.5” Spring line D = 29 ” R = Radius D = Diameter ACA D Winchester

  9. Dry wall screws used as anchor points R=14.5” Pivot point Centre for the fishtail gig stick R=14.5” R=14.5” D = 29 Springing board R = Radius D = Diameter ACA D Winchester

  10. Angle Mould Slipper Stock Template gig stick with fishtail ACA D Winchester

  11. Dry wall screws used as anchor points The slipper and gig stick are flush with the wall Pivot point Centre for the fishtail gig stick ACA D Winchester

  12. The mould is built up with three coat of plaster • The angle mould is passed over the plaster • Make sure that the mould is flush to the wall and the fishtail is located on the pivot point ACA D Winchester

  13. The mould is nearly built up ACA D Winchester

  14. The mould has been cut of at the spring line The mould has been cut of at the spring line • The semi circular arch is now run • The springing board has been removed ACA D Winchester

  15. Running the styles Relocate the angle mould on the finished section When the mould is located fix the running rule with drywall screws Then plumb down the rule and fix ACA D Winchester

  16. Twin slipper mould • Alterations have been to the angle mould • The gig stick has been removed, and a second slipper has been added • This will give the mould stability for running up the rule ACA D Winchester

  17. The gig stick has been removed, and a second slipper has been added To gauge the distance between the slippers a piece of the running rule has been used ACA D Winchester

  18. ACA D Winchester

  19. Again the mould is built up with three coats of plaster • The mould is run up and down the running rule ACA D Winchester

  20. When the mould is run • The running rule is removed • The joint at the spring line is worked with a small tool and joint rule ACA D Winchester

  21. The same process is repeated on the other style ACA D Winchester

  22. ACA D Winchester

  23. ACA D Winchester