planning study committee feedback 22 nd july 2011 chair person clinton carter brown phd
Download
Skip this Video
Download Presentation
Planning study committee feedback 22 nd July, 2011 Chair person : Clinton Carter-Brown (PhD)

Loading in 2 Seconds...

play fullscreen
1 / 25

Planning study committee feedback 22 nd July, 2011 Chair person : Clinton Carter-Brown (PhD) - PowerPoint PPT Presentation


  • 118 Views
  • Uploaded on

Planning study committee feedback 22 nd July, 2011 Chair person : Clinton Carter-Brown (PhD). Compiled by: Sanjian Malapermal Mobolaji Bello Sajeev Elengical. Outline. Background Overview of planning study committee Working and Care Groups status quo Current work plan Focus areas

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Planning study committee feedback 22 nd July, 2011 Chair person : Clinton Carter-Brown (PhD)' - chinue


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
planning study committee feedback 22 nd july 2011 chair person clinton carter brown phd

Planning study committee feedback22nd July, 2011Chair person : Clinton Carter-Brown (PhD)

Compiled by:

Sanjian Malapermal

Mobolaji Bello

Sajeev Elengical

outline
Outline
  • Background
  • Overview of planning study committee
  • Working and Care Groups status quo
  • Current work plan
  • Focus areas
  • Assurance and audit activities
  • Resourcing
  • External relationships
  • Skills development
  • Tools and systems
  • Conclusion
background
Background
  • The Eskom Strategic Grid Planning environment is situated centrally at Eskom’s head office (Megawatt Park - MWP) where Transmission Grid Planners are responsible for the development, compilation and maintenance of the Transmission Development Plan (TDP).
  • The Eskom Distribution network planning environment is dispersed over 7 regional areas across Eskom. Each regional planning team is responsible for the development, compilation and maintenance of the Dx Network Master Plans and Network Development Plans.
  • Both planning environments requires the development of standards, processes, guidelines and training, supported by software technologies to drive the standardization of future and developing technologies to integrate with the key receivers and stakeholders.
overview of planning study committee
Overview of planning study committee
  • Scope: Wires Planning standards, processes, guidelines, techniques, data, systems & tools and training.
  • Members: PD- IARC, Q&A, Dx OU, Tx OU, research, Municipalities
  • Meeting dates:
    • 4th Feb 2011
    • 22nd June 2011
    • 6th Sept 2011
electrification planning and design
Electrification planning and design

Considered to move to MV/LV distribution study committee.

network demand management ndm
Network Demand Management (NDM)

This work group is new as in the process of being constituted.

assurance and audit activities technical
Assurance and audit activities (technical)
  • Integration exists with the Network planning Stream under the previous Dx Security of Supply (SOS) project, now Operational Excellence.
  • Under SOS (and now OE) quarterly assessments of Dx Network Planning Network Code compliance have been performed to track Network Development Plan (NDP) production and Code Compliance.
  • The assessments are being extended to also include tools and systems conformance and utilisation.
  • Integration is performed with the Planning Study Committee WGs and CGs as they are generally the custodians of the standards to be complied with, and hence determine the scope of the assessments.
resourcing of sc
Resourcing of SC
  • The SC is fully resourced
  • Membership of SC & associated WGs & CGs will be rationalised (next meeting in Sept 2011)
  • Focus needs to be given to Tx Grid Planning inclusion and integration as the SC has historically under TESCOD only focused on Dx Network Planning.
external relationships
External relationships
  • RSA representative on Cigre C6 – Clinton Carter-Brown
  • RSA representative on Cigre C1 – Ronald Marais
  • SAIEE – Sanjian Malapermal (Training)
  • Observer in the following: IEC TC 8, Cigre C6.22, IEEE DG integration to Tx and Dx networks – Mobolaji Bello
skills development
Skills development
  • The Planning Study Committee prides itself on the development of the first comprehensive training programme for Distribution Network Development Planners to improve and enhance their skills development through a blended learning approach
  • Standards and guidelines show practical application via standard systems and tools and are basis for E-Learning material
  • Annual National Network Planners Meeting (Sept hosted on a rotational basis)
conclusion
Conclusion
  • Planning SC effective but focus has been on Dx Network Planning. Scope being extended to include Tx Grid Planning
  • Study Committee dependent on cooperation – changes need to be made accordingly
  • Success dependent on integrating and leveraging off other initiatives:
    • National Planners Meeting
    • Dx Planning Managers Forum
    • Group IT projects
    • Business initiatives such as Dx SOS, Operational Excellence
  • Requires critical mass in a Planning COE to drive and support