An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEC Network Emergency Exercise - Exercise Prelude

  2. Prelude • Review of the objectives of the exercise and actions taken • What was tested on each day of the exercise • Reporting • Next Steps and Contacts

  3. Gas Act 1995 Network Code E/3 for detailed incident management Prelude – Industry Exercise • Overall Objectives • Test the overall framework of Network Gas Supply Emergency procedures • Test communications and understanding across industry. • Ensure continuity and alignment of process. • Testing transporters E3 procedures Gas Safety (Management Regulations 1996 NEC Safety Case Transporters Safety Case E/1 Network Gas Supply Emergency procedure E/2 Local Gas Supply Emergency procedure

  4. Highlights. • The scenario was a progressive Gas Deficit Emergency with multiple events over the two days. • Day One. • Stage 1 Declaration • Formation of the Network Emergency Management Team • Communication with participants and System Operators • Emergency Interruption • Stage 2 and Stage 3 • Declaration and Communication • Suspension of National Grid’s participation on the OCM as Residual Balancer • NTS and LDZ VLDMC Firm Load shedding • Day Two Highlights. • Completion of remaining Stage 3 Actions • Firm Load shedding of loads >25000 tpa • NGSE Stage 4 Isolation. • Distribution Networks Isolation Plans • NGSE Stage 5 Restoration. • NTS Restoration of Firm and Interruptible loads • Distribution Networks Restoration Plans

  5. NormalOperations STAGE 1 STAGE 2 • Suspend National Grids residual balancing role • Maximisebeach • Maximise storage • Public appeal • Marketsin normaloperation • NG role ofresidualbalancer • Normallevel ofreporting • Gas Balance Alert Emergency Arrangements NGSE Stages STAGE 3 STAGE 4 • Firm loadshedding insize order • Isolation • NTS and LDZ stock • Emergency Spec Gas • EmergencyInterruption • Public appeal Stage 5 - Restoration

  6. Uniform Network Code Obligations • Section Q – Emergencies • Section defined as fulfilling two purposes • Requirements to be complied with by Users • Consequences of a Gas Supply Emergency in respect of application of the Code • Requirements for users. • User contacts • Fax and Telephone Contact available 24hr / day as the primary user contact in a Gas Supply Emergency • Must have appropriate authority and responsibility • Site Contacts • Large Firm Supply Points (AQ >25,000 therms) • Interruptible Supply Points • Power and Authority to comply with directions • Contact details to be provided to xoserve for onward cascade to the relevant Transporters. • User Emergency procedures • User should ensure alignment with section Q and emergency procedures • Relevant personnel are familiar with the Emergency Procedures

  7. Summary of Section Q Emergency Contact requirements. In addition to User contact details the User is responsible for providing the following site emergency contacts. (TPD Q 2.3 and 2.4)

  8. Prelude reporting. • Whether the correct procedures were adhered to during the each stage. • Whether the notification method was correct according to the procedures. • Whether the information provided in any correspondence was legible and easy to understand. • Whether there was any confusion over what actions were required. • Whether or not there were enough people to implement the procedures required. • If the equipment was suitable for the job – was there enough equipment. • Ascertain the time taken to calculate the information required. • Ascertain whether the speed of response from the parties involved was reasonable. • If the Systems (including spreadsheets etc) were suitable for purpose.

  9. Next Steps and Contacts • Target of December to produce the report for the HSE • All feedback is appreciated • Reports, observations and comments to: • gasops.emergencyplanning@uk.ngrid.com • Paul Youngman 01926 654151 • Claire Baldwin 01926 653232 • Lynn Crooks 01926 653223