1 / 8

VAD Test Loop

VAD Test Loop. Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall. Week 2 Presentation: Work Breakdown Structure Customer Needs Engineering Specifications. Work Breakdown Structure. 1.2 Fluid Fill, Drain, and Test

Download Presentation

VAD Test Loop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VAD Test Loop Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall • Week 2 Presentation: • Work Breakdown Structure • Customer Needs • Engineering Specifications

  2. Work Breakdown Structure • 1.2 Fluid Fill, Drain, and Test • 1.2.1 Reservoir • 1.2.1.1Tank • 1.2.1.2 Fill Point • 1.2.1.3 Drain Point • 1.2.2 Extracting sample • 1.2.2.1 Container • 1.2.2.2 Extraction Device • 1.2.3 Collection Container • 1.3 Pump Integration • 1.3.1 LVAD R2 intergrated • 1.3.2 PVS intergrated • 1.3.3 Pressure Control Pump Integrated • 1.3.4 Valves to Isolate Pumps • 1.4 System Integration • 1.4.1 Tubing • 1.4.2 Fittings • 1.4.2.1 Between Pumps • 1.4.2.2 Between Valves • 1.4.2.3 Between Joints • 1.4.3 Valves • 1.4.4 Flow regulator • 1.4.5 Support • 1.4.5.1 Cart • 1.4.5.2 Stand • 1. Biocompatible Test Loop • 1.1 Electrical Systems and Components • 1.1.1 Software/Interface • 1.1.1.1 Labview Program • 1.1.1.1.1 Generation of P vs V curves for specific Pump Speed • 1.1.1.1.2 Tracking the temperature of fluid and pumps • 1.1.1.2 Alternatives to Labview • 1.1.2 Hardware/Instrumentation • 1.1.2.1 VAD Loop speed collection • 1.1.2.2 Pressure Collection • 1.1.2.2.1 Inlet • 1.1.2.2.2 Outlet • 1.1.2.2.3 Absoulte • 1.1.2.3 Flow Rate Collection • 1.1.2.3.1 Meter • 1.1.2.4 Temperature Collection • 1.1.2.4.1 Fluid • 1.1.2.4.2 Pump • 1.1.2.5 Pressure Control • 1.1.2.6 Temperature Control • 1.1.2.7 DAQ • 1.1.2.8 Power Source

  3. Work Breakdown Structure • 1.5 Deliverables • 1.5.1 Planning • 1.5.1.1 Schedule • 1.5.1.2 Team Roles • 1.5.1.3 Customer Needs • 1.5.1.3.1 Customer Needs Interviews • 1.5.1.3.2 Customer Needs Final Draft • 1.5.1.3 Specification • 1.5.1.3.2 Specification Generation Method • 1.5.1.3.2 Specification Final Draft • 1.5.2 Concept Development • 1.5.2.1 Concept Generation • 1.5.2.2 Concept Selection Method • 1.5.2.3 Concept Selection • 1.5.3 Systems Level Design • 1.5.3.1 Architecture • 1.5.3.2 Engineering Analysis • 1.5.3.3 Risk Assessment • 1.5.3.4 Detailed Interface Specs • 1.5.3.5 Proof of Concept • 1.5.4 Proof of Concept • 1.5.4.1 Biocompatibility • 1.5.4.2 Solid Works • 1.5.4.3 CFD • 1.5.4 Detail Design • 1.5.4.1 BOM • 1.5.4.2 Drawings/Schematics • 1.5.4.3 Data package • 1.5.5 Research and Benchmarking • 1.5.5.1Past Teams • 1.5.5.2Outside Source • 1.5.6 Documentation • 1.5.6.1 EDGE website • 1.5.6.2 MSDII Project Plan • 1.5.6.3 Test Plan • 1.5.6.4 Documentation Files • 1.5.6.5 Formal Review • 1.5.7 Design Verification • 1.5.7.1 Construction • 1.5.7.2 Final Test Plan • 1.5.7.3 Verification Testing • 1.5.7.4 Verification Documentation • 1.5.8 Technical Paper • 1.5.8.1 Draft Integrated • 1.5.8.2 Print Submitted • 1.5.8.3 Published Proceedings • 1.5.9 Poster • 1.5.9.1 Submission • 1.5.9.2 Poster Activities

  4. Customer Needs

  5. Customer Needs

  6. Engineering Specifications

  7. Engineering Specifications

  8. Engineering Specifications

More Related