An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maintenance Goals2009-2014 Ideas for Today and Tomorrow

  2. Vision Statement • Continue providing excellent service to our Volusia County Schools teammates with dwindling resources.

  3. Goal 1Place Facilities Personnel Closer to Customers (Hubs) Strategies: • Increase customer and employee satisfaction • Increase productivity and decrease response time • Increase man hours on the job • Decrease driving time • Decrease equipment maintenance and replacement cost

  4. Today’s Situation • Currently VCSB technicians based in Daytona drive an average of 26 miles per work order further than Technicians currently based in Deltona • Driving 480 thousand extra miles per year creates more wear and tear on the equipment and wastes a significant amount of human and financial resources

  5. Available Options • Option 1: Stay in the current locations • Advantages: comfortable, easier communication • Disadvantages: windshield time, fuel cost, equipment cost • Option 2: Create three additional maintenance Hubs to service the district. • Advantages: reduction in fuel usage, prolong equipment life, time savings, multi-skilled workforce • Disadvantages: communication becomes more challenging • Projected Cost Savings: over $600,000

  6. Recommendations • Identify locations in DeLand, Holly Hill/Ormond and New Smyrna to open for the 09-10 school year • Implementation would save over $600,000 perhaps more importantly almost 12,000 man hours would be made available to better serve our customers due to a reduction in drive time

  7. Document and Measure • Reduce Miles Driven per Work Order by 25% • Increase Work Orders Completed by 20% • Interview Principals for Customer Satisfaction • Decrease Work Order “Open” Time by 50% • Increase the Percentage of Proactive vs. Reactive Work Orders by 100%

  8. Goal 2Reorganize Automotive Services and Inventory Strategies: • Increase productivity • Improve processes • Increase employee morale • Decrease the physical size of the fleet vehicles • Improve parts procurement

  9. Today’s Situation • Productivity is hampered by processes • Morale is low due to workload and poor communication • In some case vehicles are larger than needed • Parts are not ordered in a timely manner

  10. Available Options • Option 1: Continue operating as we are today • Advantages: Stay in our comfort zone • Disadvantages: Production stays low, along with morale • Option 2: Analyze and Restructure • Advantages: Improve morale, improve work flow, decrease parts procurement problems • Disadvantages: Reluctance of some to change, temporary decrease in productivity due to changes, one time cost of any additional needed tools or materials

  11. Recommendations • Refine processes to increase wrench time • Increase communication • Solicit employee input and act on it • Empower employees to make decisions • Survey our current fleet and identify vehicles that could be reduced in size

  12. Document and Measure • Track the number of work orders closed to Measure Productivity Year over Year • Decrease time spent on computers and other activities that are not related to turning wrenches by 10% • Survey employees regularly to better manage fluctuations in morale • Reduce the number of steps in the procurement process; track vehicle down time

  13. Goal 3Reorganize and Retool the Grounds Department Strategies: • Reduce crews from 4 to 3 person teams • Through attrition replace current equipment with equipment that will increase productivity • Reduce drive time by decentralizing

  14. Today’s Situation • 4 Person Crews • Old 48” and 54” mowers • Crews are centrally located

  15. Available Options • Option 1: 3 person crews with current equipment • Advantages: None • Disadvantages: Decreased production and customer satisfaction • Option 2: 3 person crews with updated equipment • Advantages: Increased productivity due to larger equipment that does not require as many passes and has less down time, decreased personnel cost over the 4 person crew • Disadvantages: Cost of new equipment, reduction in available labor hours available due to the reduction in personnel

  16. Recommendations • Reduce all crews to 3 people • Identify all equipment vendors and demo equipment from those that have complete supply chains and have demonstrated the ability to perform.

  17. Document and Measure • With increased mechanical capability and decreased available man hours, are the crews able to meet schedule while adding over 200 additional acres to their schedule? • Survey principals to determine customer satisfaction

  18. Goal 4Fully Develop Recycle Program and Refine Solid Waste Collection Strategies: • Increase recycle output • Decrease cubic yards delivered to the landfill • Educate the district on benefits and opportunities • Reduce mileage and drive times • Evaluate collection resources • Locate and map all grease traps and septic tanks

  19. Today’s Situation • Do not currently comingle recyclable material • Currently running 4 trucks 5 days a week • Routes are not plotted or scheduled • Not currently recycling lunch trays

  20. Available Options • Option 1: Operate as usual • Advantages: No additional cost, no changes needed • Disadvantages: Not meeting State recycle mandates, reduced equipment life cycle, Increase maintenance cost • Option 2: Develop recycle program and refine solid waste collection • Advantages: Meet state mandate for recycle levels and reduce cost • Disadvantages: Continued higher cost related to sump fees, personnel, and equipment

  21. Recommendations • Internally develop the recycle program and educate the district about the benefits • Develop new routes using routing software • Evaluate collection devices to determine serviceability and capability

  22. Document and Measure • Develop a Recycle Program and educate the district • Research method of disposing of foam lunch trays to reduce their volume in the landfill • Track routing to reduce mileage • Survey waste containers and replace as necessary to reduce the need for daily pulls • Increase the gross recycling intake by 3% per year over the next five years and decrease miles driven by 5% per year over the next five years

  23. Goal 5Develop a Mobile FMT Program Strategies: • Provide all schools access to the “Facilities Maintenance Technician” (FMT) Program • Use current personnel assets to run the program • Mobile Units should be totally self contained to minimize the impact on the Schools • Use a crew of two to maximize effectiveness

  24. Today's Situation • FMT’s are not currently mobile and each FMT services only one school, except high schools where two (2) FMTs are stationed.

  25. Available Options • Option 1: Operate as usual • Advantages: No additional cost, no changes needed • Disadvantages: Not meeting the needs of all facilities and treating them as equally as possible • Option 2: Develop Mobile FMT teams that move on a monthly basis from school to school • Advantages: Meet the needs of our schools, taking a proactive posture • Disadvantages: Startup cost, taking some of our current FMT’s out of their comfort zone

  26. Recommendations • Purchase trailers with electrical, HVAC and computer systems, add tools and inventory to make them self contained • Move the Mobile Teams on a monthly basis to a different school • Build a rotational schedule that will allow a visit from an FMT Mobile Unit at least once every six months

  27. Document and Measure • Over time reduce the number of safety related work orders at the affected facilities by 10% over the next five years • Reduce the need for back shop support. • Increase the ratio of proactive vs. reactive work orders • Increase customer satisfaction

  28. Goal 6Improve the Comprehensive Energy Management Program • Strategies: • Obtain Superintendant backing for mandatory guidelines • Utilize building automation tools and auditing • Educate the district and increase awareness • Implement monitoring processes • Field audits • Billing and rebate audits

  29. Today's Situation • Limited auditing processes • Not enough controls on access to energy management systems • Limited partnerships with local power providers to use current monitoring systems • Make the reduction of power consumption a priority in the district

  30. Available Options • Option 1: Operate as usual • Advantages: No cultural shift, no learning curve • Disadvantages: Few efficiency gains, process improvement or cost savings • Option 2: Improve Processes • Advantages: Energy, manpower and equipment savings • Create energy management awareness • Disadvantages: Startup cost, manpower to audit, strict standards that must be defended

  31. Recommendations • Further develop the energy management program and urge district support and buy In • Partner with local power providers to use the latest technology to monitor systems • Upgrade where necessary to more efficient systems and lighting

  32. Document and Measure • Monitor district ‘buy in’ with power consumption graphs • Use ‘Smart Meters’ to reduce consumption over time • Replace T-12 lights with T-8 lights or LEDs where feasible and graph savings • Reduce overall kilowatt hours used by 3% on a per sq. ft. basis each of the next five years