Oil Spill Cleanup Agent Ani Mukerji Benjamin Russell Claire Dao David Delo Robin Guido Todd Robinson Zhanna Verzi. Table of Contents.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Oil Spill Cleanup Agent Ani Mukerji Benjamin Russell Claire Dao David Delo Robin Guido' - chana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Oil Spill Cleanup Agent

Ani Mukerji

Benjamin Russell

Claire Dao

David Delo

Robin Guido

Todd Robinson

Zhanna Verzi


Table of contents
Table of Contents

Project Scope................................................................................................................................................................ 1

Vision Statement (Robin)...................................................................................................................................... 1

Business Need (Robin)......................................................................................................................................... 1

Project Description (Robin)................................................................................................................................... 1

Project Deliverables (Scope) (Robin)................................................................................................................... 2

Project Objectives) (Robin)................................................................................................................................... 3

Assumptions (Claire)............................................................................................................................................. 4

Constraints (Claire................................................................................................................................................. 4

Risks (Ani).............................................................................................................................................................. 5

Stakeholder Analysis (Todd)........................................................................................................................................... 6

Project Lifecycle (Todd)................................................................................................................................................... 7

Work Breakdown Structure (Ben).................................................................................................................................. 8

Project Schedule (Ben)................................................................................................................................................... 9

Communications Plan (Ben)......................................................................................................................................... 10

Responsibility Assignment Matrix (David)...................................................................................................................... 11

Cost Baseline (Zhanna)................................................................................................................................................. 12

Cost Baseline Graph (Zhanna)..................................................................................................................................... 13

Risk Types (Ani)........................................................................................................................................................... 14

Risk Responsibility Chart (Ani)..................................................................................................................................... 15

Risk Assessment Metric (Ani)...................................................................................................................................... 16

Risk Response Plan (Ani)............................................................................................................................................. 17

Seagulls


Project scope
Project Scope

Vision Statement

We are looking to ‘change the face’ of the oil industry and improve our image. We want to promote more social responsibility for ourselves and other oil companies.

Business Need

Positive Environmental impact.Good PR.Cut legal costs and lawsuits.Lower insurance rates.Make money.

Project Description

Create an ‘green’ product to aid in the clean up of oil spills. Once it has a license, it is used by First Response Team of Noxxe fleet. The licensing of an Noxxe is specifically for use in or on waters. Product incorporated automated deployment mechanism to release chemicals to the water. This product will improve the way we combat oil spills today by providing a more efficient, faster and environmentally safer way to clean oil spills.

  • 1 gallon of this chemical will clean(absorb) 1000 gallons of oil spill;

  • product will environmentally safe

  • is part of fleet emergency kit

  • is in self-dissolving packaging

  • it’s projected to produce 2500 gallons of chemical to be acrried by fleet of 50 ships

Seagulls


Project scope1
Project Scope

Project Deliverables (Scope)

Seagulls


Project scope2
Project Scope

Project Objectives

Seagulls


Project scope3
Project Scope

Assumptions

Constraints

Seagulls


Project scope4
Project Scope

Risks

Seagulls




Work breakdown structure
Work Breakdown Structure

Phase 1 Research

1.1 Historical Case Studies

1.2 Market Research Study

1.3 Patent Research

Phase 2 Development

2.1 Modeling

2.2 Prototyping

2.3 Testing Different Prototypes

2.4 Final Prototype

Phase 3 Testing

3.1 Functional Testing

3.2 Standards Testing

3.3 Third Party Testing

Phase 4 Manufacturing

4.1 Manufacturing Process

4.2 Logistics

Phase 5 Launch and Deployment

5.1 Advertising

5.2 PR

Seagulls




Responsibility assignment matrix continuation
Responsibility Assignment Matrix(Continuation)

Seagulls


Responsibility assignment matrix continuation1
Responsibility Assignment Matrix(Continuation)

Seagulls