html5-img
1 / 5

NEW n-TOF HOIST

NEW n-TOF HOIST. N-TOF External Panel Review CERN, 15.06.2007 Ingo Rühl / TS-IC-HM. Prehistory 1/2. Existing installation HHLPA-0871, DONATI, 1987 (LEP), 6.5t (5t)

chana
Download Presentation

NEW n-TOF HOIST

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW n-TOF HOIST N-TOF External Panel Review CERN, 15.06.2007 Ingo Rühl / TS-IC-HM

  2. Prehistory 1/2 • Existing installation • HHLPA-0871, DONATI, 1987 (LEP), 6.5t (5t) The existing installation does not converge with the standard practice and norms (KTA 3902[1], EN 60204– 1, EN 60204– 32) for the handling of radioactive material for which security and operation measures must be taken to eliminate or diminish the risk [1] The KTA 3902 ‘Design of Lifting Equipment in Nuclear Power Plants’ (http://www.kta-gs.de/e/standards/3900/3902-e.pdf) is the most comprehensive document in this respect.

  3. Prehistory 2/2 • 2000 - Design study (COMETE - 5’000 €) • Environmental/space constraints • Redundant lifting cinematic (2 electrical motors, electrical cubicle and control debarked etc.) • No changes on the lateral movement system • 2001 – Price offer (COMETE – 110’000 €) • 6 months delay between placing the order and commissioning • 2006 – Revision price offer (COMETE – 200’000 €) • 6 months delay between placing the order and commissioning

  4. Present situation • Lifting of n-TOF target feasible (not glued or deformed, test done 21.05.2007, radiation level lower than expected). • No more objections by the TS department to proceed with the proposed maneuver to displace the target into the safer intermediate storage shaft (next to the main shaft). • Coordination meeting proposed as soon as possible.

  5. Future aspects • Provided that the new n-TOF experiment is approved TS-IC proposes to launch a price enquiry for a new hoist that takes in consideration the requirements of the new n-TOF target (weight, expected radiation levels etc.) • Delay about 10-12 months between the approval of the Divisional Request and the commissioning