Multi tasking
This presentation is the property of its rightful owner.
Sponsored Links
1 / 32

Multi-tasking PowerPoint PPT Presentation


  • 123 Views
  • Uploaded on
  • Presentation posted in: General

Multi-tasking. OKUMA Multus B300W. Multi-tasking. Mori-Seiki NT. Multi-tasking. Mazak Integrex Mark IV. Multi-tasking. Machine Definition. Multi-tasking. Axis combinations. Multi-tasking. Axis combinations. Multi-tasking. Stock Setup. Multi-tasking.

Download Presentation

Multi-tasking

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Multi tasking

Multi-tasking

OKUMA Multus B300W


Multi tasking1

Multi-tasking

Mori-Seiki NT


Multi tasking2

Multi-tasking

Mazak Integrex Mark IV


Multi tasking3

Multi-tasking

Machine Definition


Multi tasking4

Multi-tasking

Axis combinations


Multi tasking5

Multi-tasking

Axis combinations


Multi tasking6

Multi-tasking

Stock Setup


Multi tasking7

Multi-tasking

Tool Setup – Define lathe tools in B=0 position.


Multi tasking8

Multi-tasking

Tool Setup – Define lathe tools in B=0 position.

MazakIntegrex

Okuma Multus

Mori Seiki NT


Multi tasking9

Multi-tasking

Tool Angle – One tool can be defined to work in any possible configuration using Tool Angle

Tool Angle = BA: Angle (Okuma Multus)

Tool Orientation on Machine: Indexes a tool to work on Left spindle or Right spindle and for back turning on either spindle

(M602 or M603- Okuma Multus)


Multi tasking10

Multi-tasking

Tool Orientation on Machine: Indexes a tool to define Position B

(Okuma Multus - M602 or M603)

N220G97 G95 S=3800 M42 M602 BA=90. TL=011011


Multi tasking11

Multi-tasking

Tool Orientation on Machine: Indexes a tool to define Position B

(Mori-Seiki NT D1 or D2)


Defining lathe tool output

Defining Lathe tool output

Tool ID Code: MR2

For consistency, the general guidelines below are suggested


Multi tasking12

Multi-tasking

Tool Orientation on Machine: Indexes a tool to define Position B

(Integrex Mark IV - Matrix)

(PROGRAM NAME - MULTI-TASKING DEMO_MJR1 DATE=DD-MM-YY - 22-02-09 TIME=HH:MM - 13:47 )

(POST LICENSE - IN-HOUSE SOLUTIONS INC.)

(T11 | CNMG 08 OD R | DIA. - 11 | SUFFIX - .02 | INSERT - CNMG 12 04 08)

G21 G69 G80 G40 G18 G90 G94

M205

(UPPER TURRET)

G109 L1

(T11 | CNMG 08 OD R | DIA. - 11 | SUFFIX - .02 | INSERT - CNMG 12 04 08)

(TOOLPATH GROUP - PREP STOCK )

G21 G10.9 X1

N1 G91 G28 X0.

N1 G28 Y0. Z0.

M901

M202

T11.02 T11 M06

G91 G28 X0. Z0.

G90

M108

G0 G90 G53 B90.

M107

G54

. . .


Multi tasking13

Multi-tasking

N220G97 G95 S=3800 M42 M602BA=90. TL=111111

N230 M4


Multi tasking14

Multi-tasking

Program: Facing / Drilling / ID Boring


Multi tasking15

Multi-tasking

Misc Ops: Stock Flip


Multi tasking16

Multi-tasking

Misc Ops: Stock Flip


Multi tasking17

Multi-tasking

Face / Drill / ID Bore (rough) / ID Bore undercut finish


Multi tasking18

Multi-tasking

ID Bore undercut

N220G97 G95 S=2816 M42 M602BA=-10. TL=330933

N230 M4


Multi tasking19

Multi-tasking

OD Rough / Finish / Plunge Cut Parameters


Multi tasking20

Multi-tasking

OD Finish Back turning

N220G97 G95 S=509 M41 M603BA=90. TL=004004

N230 M3


Multi tasking21

Multi-tasking

Finish ID / Thread OD


Multi tasking22

Multi-tasking

Mill slot / Transform toolpath

T/Cplane TOP in Mill is C=90. BACK is C=0

. . .

N210G94 SB=2000 M241 M63 M9 BA=90. G52 TL=303030

N220 M13

N230 G138

N240 G17

N250 M146

N260 G0 C90.

N270 M147

N280 G127 B90.

N290 G0 Z155.

N300 X37.5 Y0.

N310 Z65.

. . .


Multi tasking23

Multi-tasking

Circle Mill counterbore / Drill / Tap angled holes


Multi tasking24

Multi-tasking

Misc Ops: Stock Flip back to OP1 position

Geometry exists already. Transfer geometry not required


Multi tasking25

Multi-tasking

Stock Flip – Original position


Multi tasking26

Multi-tasking

Face – Stock recognition


Multi tasking27

Multi-tasking

Rough / Semi-finish ID


Multi tasking28

Multi-tasking

Rough OD / Finish OD


Multi tasking29

Multi-tasking

Thread


Multi tasking30

Multi-tasking

Finish corners


  • Login