1 / 11

Space Debris Conceptual Design Review

Space Debris Conceptual Design Review. Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth 9-23-08. http://www2.lib.uchicago.edu/~dean/blog/bolide-largecrop.jpg. Mission Overview.

Download Presentation

Space Debris Conceptual Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Space DebrisConceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth 9-23-08 http://www2.lib.uchicago.edu/~dean/blog/bolide-largecrop.jpg

  2. Mission Overview • Ourobjectiveisto conduct scientific analysis of near space conditions by imaging stars through the means of a timed extension of the mechanical platform with a mirror cluster attached at the end in order to obtain pictures at many angles. • We plan to discover how to build the mechanical systems needed to extend a platform with a cluster of mirrors on the end. This mission will hopefully give us the ability to learn about the near space environment and many new technological skills involving the mechanical platform deployment. The mission will also help us discover how to retrieve the mechanical platform back into the satellite before landing in order to keep the mirror from being damaged. • We are doing this mission for the challenge of the extendable arm and the possibility of better images of stars.

  3. Design • The BalloonSat shall be a basic rectangular prism shape. A plastic tube shall be placed through the center of the cube, top to bottom. • The center of one exterior wall shall contain a double door that shall be connected by internal hinges and shall be pushed open by the extending mechanical platform. • The open door shall allow the camera to see out of a plexi-glass window. • After the mechanical platform is deployed, a mirror cluster connected to the end shall allow the camera to capture a wide representation of what is visible at 30 km. • The mechanical platform shall be along the bottom of the BalloonSat when not deployed . A set of gears run by a simple motor and timing circuit shall deploy and retract the platform. • One heater with a central location shall keep the internal BalloonSat temperature above zero degrees Celsius. Other systems including the HOBO data logger and timing circuit shall be placed accordingly to counter the weight of the camera and mirror.

  4. Drawing of Design

  5. Functional Block Diagram Temperature-internal and external HOBO logger Camera Switch Humidity Camera Power Heater Power (9V Batteries) Switch Heater 1 Timer Power (12V battery) Switch 555 Timer Platform Deployment Motor Motor Power (9V batteries)

  6. How we are going to complete our mission • By assigning leaders to key parts of our Balloonsat’s construction we are all able to help on each part while the 2 leaders of that part specialize in the given area. • By following our schedule and adding more meetings if needed, we will be able to have a complete and tested BalloonSat ready for launch.

  7. Management Structure Leads: Cole Bostrom, Corey Godwin Electronics Leads: Emily Logan, Seanna Renworth Science/Mechanical Leads: Sean Murphy, Jonathan Kirchmaier http://zephyraudio.com/db5/00405/zephyraudio.com/_uimages/DSCF1330.JPG http://www.supplychain.cn/attachments/wysiwyg/2527/electronic.jpg http://www.mascarillons.org/ImagesSiteMascarillons/MSC-structure/MSC-structure-polycarb

  8. Schedule Week of October 27- November 2: Continue testing final design LLR cards assigned 10-30 Week of November 3-9: BalloonSat complete 11-3 In-class mission simulation test 11-4 Continue in-class mission simulation test, Review C due 8:00 a.m., LLR cards due in class 11-6 Week of November 10-16: Pre-launch inspection and Launch Readiness Review 11-11 Final weigh in and turn in 11-14 Launch at 7:30 a.m. 11-15 Week of November 17-23 Analyze data from mission in class 11-18 Begin Final Report 11-18 Week of November 24-30- Fall Break Week of December 1-6 Final Team Presentation and report, Review D due 12-2 ITLL Design Expo 12-6 Team Schedule of Events: • Week of September 22-28: Complete design and prototype 9-22 Conceptual Design Review 9-23 • Week of September 29- October 5: Acquire Authority to Proceed and order all hardware by 10-2 Begin building payload and payload systems 10-3 • Week of October 6-12: Structure tests begin 10-8 Review A due, payload systems complete 10-9 • Week of October 13-19: Continue structure and begin systems testing 10-13 Critical Design Review, Review B due 10-14 • Week of October 20-26: In-class demo of current BalloonSat 10-23 Begin cold tests and testing final design 10-24

  9. Budget • Weight Total: 957.7 grams http://www.carolina.com/images/en_US/local/products/detail/702020_le.jpg

  10. Budget http://www1.istockphoto.com/file_thumbview_approve/5468838/2/istockphoto_5468838-dollar-sign.jpg

  11. Our Worries • Time… • Our team is worried that we will not have enough time to complete building our BalloonSat and running the tests on it. • BalloonSat not functioning properly… • Our team is also worried that our BalloonSat will not function or our science will not work.