An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Managing Subcontracting in Advanced Repetitive MWUG 2013 Grand Rapids, MI

  2. Why Subcontract?

  3. Subcontract Triangle Supplier Schedule (PO) PO and Line WO ID OP Routing Cumulative Work Order Routing Code Process Flows

  4. Normal Scenarios #1 - Permanent #2 - Temporary

  5. #1 Permanent RM Release Plant Steel mill RM delivered WIP Release Sub-Contractor • Receipt acknowledgment • PO Receipt (special location) • WIP Shipped / Invoiced • PO Receipt (WIP) with backflush

  6. Setups

  7. #2 Temporary Plant Shipped Blank made Sub-Contractor Formed item made • Receipt acknowledgment • Inventory transfer • WIP Shipped / Invoiced • PO Receipt (WIP) with backflush

  8. Setups

  9. Special: Lot Controlled Component

  10. PO Receipt RCT-WO and ISS-SO do not complete due to lot/serial control

  11. Backflush Transaction Follow-up receipt with modified backflush to report and issue lot specified components