RF Development for ESS

RF Development for ESS. Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec. 2009. The ESS Proton Linac. High reliability: >95% 2.5 GeV, 2.0 ms pulses at 20 Hz 50 mA, average 5.0 MW (beam loss <1 W/m) Future upgrade to 75 mA, 7.5 MW Services: electricity, vacuum

Download Presentation

RF Development for ESS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec. 2009 RR+VZ: ESS RF Development

  2. The ESS Proton Linac • High reliability: >95% • 2.5 GeV, 2.0 ms pulses at 20 Hz • 50 mA, average 5.0 MW (beam loss <1 W/m) • Future upgrade to 75 mA, 7.5 MW • Services: • electricity, vacuum • cooling water and liquid helium • RF power at 352.2 and 704.4 MHz RR+VZ: ESS RF Development

  3. RF Accelerating Structures synchronize particlewith anelectromagnetic wave! Courtesy E. Jensen RR+VZ: ESS RF Development

  4. Superconducting Elliptical Cavity Use waveguide with ”discs” to slow down EM wave; vphase = vparticle < c Travelling or standing wave SC Cavity Courtesy E. Jensen Courtesy CERN LHC-PHO-1994-006 RR+VZ: ESS RF Development

  5. Basic Layout RF System • LLRF: • RF source, regulate (A, Ph) • monitor cavity RF (A,Ph) • cavity tuning • High power RF: • klystron amplifier • power distribution (A, Ph) • power coupler, HOM coupler HOM damping RR+VZ: ESS RF Development

  6. R&D Proposal from Uppsala • Development 704 MHz RF system • Development and test of LLRF controls • signal generation, power modulation, cavity tuning (FB+FF) • Development and test of high power components: • 1 MW vector modulator, 8 MW pulse modulator, 4 MW klystron • power couplers, circulators, phase shifters, loads • Tests facility with • 2 Elliptical cavities in horizontal cryostat • Modulator, Klystron, Cryogenics • Test different RF distribution system combinations • 1 or 2 cavities per klystrons • with and without vector modulator RR+VZ: ESS RF Development

  7. Low Level RF Development • FB + FF • signal generation • high power modulation, • cavity tuning:Detuning under • Pulsed power (microphonics, Lorenz detuning) • Beam loading → cavity moves away from resonance • Counteract with mechanical tuner and RF phase (FB+FF) CourtesyDESY/S. Simrock RR+VZ: ESS RF Development

  8. RF Power Amplification Development • 8 MW high voltage pulse modulator [Scandinova] • 4 MW power amplifier (klystron) • CPI VKP-7952 klystron: • 704.4 MHz, 1 MW, 2 ms pulse • 95 kV, 21 A beam • 40 dB gain; 65 % efficiency • 5x1x1.5 m; 2.5 ton RR+VZ: ESS RF Development

  9. RF Power Distribution Development • RF distribution: • 2 cavities per klystronmajor cost saving! • with or without1 MW vector modulator • Power components: • power couplers, • HOM couplers, • circulators, • phase shifters, • loads Courtesy CERN/D. Valuch Vector Modulator RR+VZ: ESS RF Development

  10. R&D Facility Proposal • Modulator, klystron, cryogenics • 2 Elliptical cavities in horizontal cryostat Courtesy CAI/N. Johansson RR+VZ: ESS RF Development