1 / 6

Backup Slides

Backup Slides. Build A Floor Plan. 2-Bag 59.5” x 31.5”. 3-Bag 83.5” x 31.5”. Take-Away 121” x 36.5”. Take-Away w/ Input Belt 192” x 36.5”. 1-Bag w/ Sensormatic 59.5” x 31.5”. 3-Bag w/ Sensormatic 83.5” x 31.5”. Shopping Cart 40” x 24”. Cashier Station 40” x 24”.

Download Presentation

Backup Slides

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Backup Slides

  2. Build A Floor Plan 2-Bag 59.5” x 31.5” 3-Bag 83.5” x 31.5” Take-Away 121” x 36.5” Take-Away w/ Input Belt 192” x 36.5” 1-Bag w/ Sensormatic 59.5” x 31.5” 3-Bag w/ Sensormatic 83.5” x 31.5” Shopping Cart 40” x 24” Cashier Station 40” x 24”

  3. Build A Floor Plan 1-Bag w/ Input Belt Sensormatic 119” x 31.5” 3-Bag w/ Input Belt Sensormatic 143” x 31.5 2-Bag w/ Input Belt 119” x 31.5” 3-Bag w/ Input Belt 143” x 31.5” C-Series 158” x 50” • Images drawn to scale on 12” grids • Should provide ~36” between lanes • ~144” between lanes in quad format Traditional Lane 140” x 36”

  4. Component Migration Investment Protection ComponentRelease 2Release 3 Display 12.1” 7401 15” 7401 Cash Acceptor ZT1207 ZT1207 Coin Acceptor MC C435 MC SR5 Cash Dispenser 5633 5633 Coin Dispenser Transact 2+ Transact 2+ CE Coupon Acceptor Slot Slot w/Sensor Scanner 7875 7875 Printer 580/590 590 PIN Pad 5992 5992 Security Scale Tidea Tidea Lock MH Electronic Emcko Key Software R2 or R3 R3 Software Transparency Evolution with Investment Protection

  5. Self-Checkout Alignment Guest Services Strategy • Labor • Cashier scheduling • Interventions • Service Level Definition • Infrastructure • Mix of self/assisted • Configuration • Density • Simulation • Process Integration • Line busters • Volume thresholds Tools / Scorecard / Matrix Operational Plan

  6. General Merchandise Considerations • Consumer Orientation • Awareness • Placement • Density • Signage and Promotion • Merchandise Handling • Hanger Management • “Hard” tags • Bulk / Awkward Items • Boxes/Bags/Tissue Paper • Security • Decentralized checkout • Item Substitution • Bag handling • Replenishment of media • Unique Transactions • In-store markdowns • Coupons • Special Services • Declined tenders • Gift Cards Learning Opportunities Ahead

More Related