Review of Goals and Action Items from last time (O. Lupie)--5 min - PowerPoint PPT Presentation

Agenda
Download
1 / 11

  • 102 Views
  • Uploaded on
  • Presentation posted in: General

Agenda. Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G. Blue)--20 min WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

Review of Goals and Action Items from last time (O. Lupie)--5 min

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Review of goals and action items from last time o lupie 5 min

Agenda

Review of Goals and Action Items from last time (O. Lupie)--5 min

WFC3 and COS Instrument Development Status (G. Blue)--10 min

WFC3 FSW Status and Schedule (G. Blue)--20 min

WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min

Consolidated WFC3 Schedule (B. Rehm) --20 min

Break  20 minutes

COS FSW Status and Schedule (G. Blue) --20 min

COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min

WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes

Transition Planning (Grant Blue) --15 min

Discussion & Lunch

1


Review of goals and action items from last time o lupie 5 min

Revisit Goals:

Schedule and schedule drivers review.

Provide forum for discussion.

Linkages and Interface clarification.

Improve Information flow.

Next splinter meeting planning.

Talk directly with team counterparts.

Establish perspective – how each piece fits into whole.

Renew commitment for timely information exchange.

2


Review of goals and action items from last time o lupie 5 min

Revisit Goals:

Schedule and schedule drivers review.

Provide forum for discussion.

Linkages and Interface clarification.

Improve Information flow.

Next splinter meeting planning.

Talk directly with team counterparts.

Establish perspective – how each piece fits into whole.

Renew commitment for timely information exchange.

3


Review of goals and action items from last time o lupie 5 min

  • Action Items from March 27th Splinter

  • Plan for WFC3 and COS splinter at Ball Summer 2001  CLOSED

  • Initiate Tracking of WFC3 FSW and Ground System Development  CLOSED (Brian, Grant, Olivia, Wayne) [tracking and dependencies now included in Thai’s development schedule]

  • Initiate Tracking of COS FSW and Ground System Development  OPEN (unassigned)

  • WFC3 and COS need updated schedules for the delivery of test data suites  CLOSED (G. Blue)

  • Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL)

  • WFC3 MOU updated to reflect new schedules and March 27 splinter  CLOSED - O. Lupie

  • WFC3 MOU to address real-time TV support and connection to STScI  CLOSED – O. Lupie

  • Investigate COS and WFC3 Transition Plan Requirements  IN WORK B. Friedman to present @ splinter.

  • Scrub DRD Delivery Dates  CLOSED (G. Blue)

  • Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler  INWORK

  • Address Fire-Wall issues for remote access to COS and WFC3 Telemetry  CLOSED

  • Closed Actions from previous splinters:

  • Have SISEs participate in WOWG and COWG  CLOSED (R. Henry, STScI)

  • Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests  CLOSED (C. Blades, STScI)

  • Link from GSFC Private WFC3 pages to GSFC FSW/OPS site  CLOSED (Ball)

  • Provide Instructions to Ball and GSFC for accessing the STScI OPR system  CLOSED (W. Baggett, STScI)

  • DM-05 to be placed on Web  CLOSED (M. Draugelis, Ball)


Review of goals and action items from last time o lupie 5 min

STScI - WFC3 Achievements since last time:

Ops Telecon support: New error message review process is working well.

Ground System: functionality available for basic UVIS Accum, IR Multi- Accum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne Baggett).

WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse)

Delivery of AV-03 (Calibration Requirements) – October, 2001.

TV Science Calibration report submission (Neill Reid, Frank Bartko).

TV software support information gathering meeting – 08/2001.

Recommendation for TV Data Handling System submission – 10/2001.

Front-end

Pipeline

ICAL

5


Review of goals and action items from last time o lupie 5 min

STScI WFC3 Memorandum of Understanding:

  • Driven by Thermal Vac.

  • Documents interfaces/dependencies  Ball, STScI, GSFC, ICAL.

  • Now focuses on two categories of STScI support:

  • Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage.

  • Time-Critical- Specialized system for quick-look analysis with real-time archive.

recent addition

6


Review of goals and action items from last time o lupie 5 min

Key MOU Items – version 10/15/2001

  • 5. Delivery of WFC3 OPS Test Bench Images – March 1, 2002

  • Source: Grant Blue, Ball

  • Recipient: WFC3 Science IPT

  • Completion of Code and Unit Test Build 3.0 – March 30, 2002Source: Grant Blue, BallRecipient: STScI – ESS (T. Wheeler & FSET )

  • 7. Delivery of Images from the Integrated Optical Bench - June 1, 2002.

  • Source: Grant Blue, Ball

  • Recipient: WFC3 Science IPT

  • 8. Delivery of TV-Specific and Optical Stimulus Keywords

  • Initial version –October 31, 2001, Complete version – May, 2002

  • Source: WFC3 ICAL

  • Recipient: WFC3 Science IPT

7


Review of goals and action items from last time o lupie 5 min

Key MOU Items – version 10/15/2001

9. Delivery of TV-Specific and Optical Stimulus Keywords

Initial version 10/31/2001, Complete version 05/2002.

Source: WFC3 ICAL

Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive)

11. OPUS Staging Disk Implementation – December, 2002

Source: WFC3 ICAL

Recipient: STScI OPUS

12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002)

Source: STScI OPUS

Recipient: WFC3 Science IPT and WFC3 ICAL

8


Review of goals and action items from last time o lupie 5 min

SEPT, 2001

ICAL Development

OPUS

Keywords

DM-06 – snapshot telemetry and internal header data

OS, TV

Keywords

DEC, 2001

SMS timing trials

Test Bench “Early” Images

MAR, 2002

Test Bench Image Suite

Science SMS Testing

Begins

Build 3 C/U Complete

Integrated Optical Bench Images

Beta OPUS

JUN, 2002

ICAL

Proto

Testing

SEPT, 2002

Final OPUS

KEY

Front End

Archive

Pipeline/Archive

DEC, 2002

TV Cal Support

TV Readiness Test

TV

Thermal VAC

Version October 15, 2001

MAR, 2003

Complete SMS Testing for SMGT

9

SMGT

JUN, 2003


Review of goals and action items from last time o lupie 5 min

STScI Ground System Development Linkages:

1yr between Build 3 C/U & SMGT

2mo between Full Suite Ops Bench Images and Beta OPUS

4mo between Beta OPUS and Final OPUS Deliveries

Final Opus ready for TV ReadinessTest – Dec, 2002

2mo from TV ReadinessTest to start of TV.

10


Review of goals and action items from last time o lupie 5 min

SEPT, 2001

ICAL Development

OPUS

Keywords

DM-06

OS, TV

Keywords

DEC, 2001

1-2 month slip

SMS timing trials

MAR, 2002

Test Bench “Early” Images

Test Bench Image Suite

Build 3 C/U Complete

Start SMS Testing

Integrated Optical Bench Images

JUN, 2002

ICAL limited to test of real-time system

ICAL

Proto

Testing

BETA OPUS

SEPT, 2002

KEY

Minimal testing of Final OPUS; no ICAL tests

Front End

Pipeline/Archive

Final OPUS

DEC, 2002

TV Cal Support

TV Readiness Test

TV

Archive not ready for

TV Readiness. No test-time

Archive

Schedule-Incompatibility

Thermal VAC

@ GSFC

MAR, 2003

Version November 1, 2001

Incomplete SMS testing.

Risk final Phase development effort.

SMGT

JUN, 2003

Complete SMS Testing

11


  • Login