Agenda. Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G. Blue)--20 min WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min

Download Presentation

Review of Goals and Action Items from last time (O. Lupie)--5 min

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Review of goals and action items from last time o lupie 5 min

Agenda

Review of Goals and Action Items from last time (O. Lupie)--5 min

WFC3 and COS Instrument Development Status (G. Blue)--10 min

WFC3 FSW Status and Schedule (G. Blue)--20 min

WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min

Consolidated WFC3 Schedule (B. Rehm) --20 min

Break  20 minutes

COS FSW Status and Schedule (G. Blue) --20 min

COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min

WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes

Transition Planning (Grant Blue) --15 min

Discussion & Lunch

1


Review of goals and action items from last time o lupie 5 min

Revisit Goals:

Schedule and schedule drivers review.

Provide forum for discussion.

Linkages and Interface clarification.

Improve Information flow.

Next splinter meeting planning.

Talk directly with team counterparts.

Establish perspective – how each piece fits into whole.

Renew commitment for timely information exchange.

2


Review of goals and action items from last time o lupie 5 min

Revisit Goals:

Schedule and schedule drivers review.

Provide forum for discussion.

Linkages and Interface clarification.

Improve Information flow.

Next splinter meeting planning.

Talk directly with team counterparts.

Establish perspective – how each piece fits into whole.

Renew commitment for timely information exchange.

3


Review of goals and action items from last time o lupie 5 min

  • Action Items from March 27th Splinter

  • Plan for WFC3 and COS splinter at Ball Summer 2001  CLOSED

  • Initiate Tracking of WFC3 FSW and Ground System Development  CLOSED (Brian, Grant, Olivia, Wayne) [tracking and dependencies now included in Thai’s development schedule]

  • Initiate Tracking of COS FSW and Ground System Development  OPEN (unassigned)

  • WFC3 and COS need updated schedules for the delivery of test data suites  CLOSED (G. Blue)

  • Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL)

  • WFC3 MOU updated to reflect new schedules and March 27 splinter  CLOSED - O. Lupie

  • WFC3 MOU to address real-time TV support and connection to STScI  CLOSED – O. Lupie

  • Investigate COS and WFC3 Transition Plan Requirements  IN WORK B. Friedman to present @ splinter.

  • Scrub DRD Delivery Dates  CLOSED (G. Blue)

  • Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler  INWORK

  • Address Fire-Wall issues for remote access to COS and WFC3 Telemetry  CLOSED

  • Closed Actions from previous splinters:

  • Have SISEs participate in WOWG and COWG  CLOSED (R. Henry, STScI)

  • Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests  CLOSED (C. Blades, STScI)

  • Link from GSFC Private WFC3 pages to GSFC FSW/OPS site  CLOSED (Ball)

  • Provide Instructions to Ball and GSFC for accessing the STScI OPR system  CLOSED (W. Baggett, STScI)

  • DM-05 to be placed on Web  CLOSED (M. Draugelis, Ball)


Review of goals and action items from last time o lupie 5 min

STScI - WFC3 Achievements since last time:

Ops Telecon support: New error message review process is working well.

Ground System: functionality available for basic UVIS Accum, IR Multi- Accum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne Baggett).

WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse)

Delivery of AV-03 (Calibration Requirements) – October, 2001.

TV Science Calibration report submission (Neill Reid, Frank Bartko).

TV software support information gathering meeting – 08/2001.

Recommendation for TV Data Handling System submission – 10/2001.

Front-end

Pipeline

ICAL

5


Review of goals and action items from last time o lupie 5 min

STScI WFC3 Memorandum of Understanding:

  • Driven by Thermal Vac.

  • Documents interfaces/dependencies  Ball, STScI, GSFC, ICAL.

  • Now focuses on two categories of STScI support:

  • Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage.

  • Time-Critical- Specialized system for quick-look analysis with real-time archive.

recent addition

6


Review of goals and action items from last time o lupie 5 min

Key MOU Items – version 10/15/2001

  • 5. Delivery of WFC3 OPS Test Bench Images – March 1, 2002

  • Source: Grant Blue, Ball

  • Recipient: WFC3 Science IPT

  • Completion of Code and Unit Test Build 3.0 – March 30, 2002Source: Grant Blue, BallRecipient: STScI – ESS (T. Wheeler & FSET )

  • 7. Delivery of Images from the Integrated Optical Bench - June 1, 2002.

  • Source: Grant Blue, Ball

  • Recipient: WFC3 Science IPT

  • 8. Delivery of TV-Specific and Optical Stimulus Keywords

  • Initial version –October 31, 2001, Complete version – May, 2002

  • Source: WFC3 ICAL

  • Recipient: WFC3 Science IPT

7


Review of goals and action items from last time o lupie 5 min

Key MOU Items – version 10/15/2001

9. Delivery of TV-Specific and Optical Stimulus Keywords

Initial version 10/31/2001, Complete version 05/2002.

Source: WFC3 ICAL

Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive)

11. OPUS Staging Disk Implementation – December, 2002

Source: WFC3 ICAL

Recipient: STScI OPUS

12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002)

Source: STScI OPUS

Recipient: WFC3 Science IPT and WFC3 ICAL

8


Review of goals and action items from last time o lupie 5 min

SEPT, 2001

ICAL Development

OPUS

Keywords

DM-06 – snapshot telemetry and internal header data

OS, TV

Keywords

DEC, 2001

SMS timing trials

Test Bench “Early” Images

MAR, 2002

Test Bench Image Suite

Science SMS Testing

Begins

Build 3 C/U Complete

Integrated Optical Bench Images

Beta OPUS

JUN, 2002

ICAL

Proto

Testing

SEPT, 2002

Final OPUS

KEY

Front End

Archive

Pipeline/Archive

DEC, 2002

TV Cal Support

TV Readiness Test

TV

Thermal VAC

Version October 15, 2001

MAR, 2003

Complete SMS Testing for SMGT

9

SMGT

JUN, 2003


Review of goals and action items from last time o lupie 5 min

STScI Ground System Development Linkages:

1yr between Build 3 C/U & SMGT

2mo between Full Suite Ops Bench Images and Beta OPUS

4mo between Beta OPUS and Final OPUS Deliveries

Final Opus ready for TV ReadinessTest – Dec, 2002

2mo from TV ReadinessTest to start of TV.

10


Review of goals and action items from last time o lupie 5 min

SEPT, 2001

ICAL Development

OPUS

Keywords

DM-06

OS, TV

Keywords

DEC, 2001

1-2 month slip

SMS timing trials

MAR, 2002

Test Bench “Early” Images

Test Bench Image Suite

Build 3 C/U Complete

Start SMS Testing

Integrated Optical Bench Images

JUN, 2002

ICAL limited to test of real-time system

ICAL

Proto

Testing

BETA OPUS

SEPT, 2002

KEY

Minimal testing of Final OPUS; no ICAL tests

Front End

Pipeline/Archive

Final OPUS

DEC, 2002

TV Cal Support

TV Readiness Test

TV

Archive not ready for

TV Readiness. No test-time

Archive

Schedule-Incompatibility

Thermal VAC

@ GSFC

MAR, 2003

Version November 1, 2001

Incomplete SMS testing.

Risk final Phase development effort.

SMGT

JUN, 2003

Complete SMS Testing

11