Canadian Heavy Oil Association Presentation November 10 th , 2011 A Different View of Project Execution

Canadian Heavy Oil Association Presentation November 10 th , 2011 A Different View of Project Execution. SAGD Construction Project Timelines. Background in SAGD Deer Creek Energy - Joslyn Pilot Plant. Background in SAGD Deer Creek Energy - Joslyn Commercial Facility.

calista
Download Presentation

Canadian Heavy Oil Association Presentation November 10 th , 2011 A Different View of Project Execution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Canadian Heavy Oil AssociationPresentationNovember 10th, 2011A Different View of Project Execution

  2. SAGD Construction Project Timelines

  3. Background in SAGDDeer Creek Energy - Joslyn Pilot Plant

  4. Background in SAGDDeer Creek Energy - Joslyn Commercial Facility

  5. Background in SAGDConnacher Oil and Gas – Pod I Commercial Facility

  6. Background in SAGDConnacher Oil and Gas – Algar Commercial Facility

  7. Current Projects • Pengrowth Energy Corporation – Lindbergh Pilot Plant • Currently Under Construction • Scheduled for Startup in Q1 of 2012 • Southern Pacific Resources – McKay River Commercial SAGD • Currently Under Construction • Scheduled for Startup in Q2 of 2012 • N-Solv Corporation – McKay River Pilot Project • Currently undergoing Engineering • Scheduled for Startup in Q4 of 2012

  8. Typical ProjectAlgar Commercial Facility – Early Road Construction

  9. Typical ProjectAlgar Commercial Facility – Road Construction Complete

  10. Typical ProjectAlgar Commercial Facility – Plantsite Civil Preparation

  11. Typical ProjectAlgar Commercial Facility – Pile Driving

  12. Typical ProjectAlgar Commercial Facility – Day 30

  13. Typical ProjectAlgar Commercial Facility – Day 150 – Evaporator Lift

  14. Typical ProjectAlgar Commercial Facility – Typical Module Installation

  15. Typical ProjectAlgar Commercial Facility – Day 240

  16. Typical ProjectAlgar Commercial Facility – First Steam

  17. Project Execution • Process Design • Detailed Process Review • Early Involvement of Operations • Ability of the Team to quickly evaluate process options incorporating input from all stakeholders & to implement decisions rapidly • Ability of the Team to recognize unit operations that have been successfully utilized in similar applications and not waste time in re-evaluation unless justified • Contracting Strategy & Risk Management • Best scenario for a successful project is where the goals of the Owner, Project Managers, Vendors, and Contractors are all aligned. • Lump Sum for Engineering Contractor based on a % of +/- AFE • Sole Source Supply where justified • Detailed bid process where justified • Time and materials based contracts • Field contracts a mix of fixed price and hourly

  18. Project Execution • Shop Fabrication Procurement • Onus heavily on Engineering Contractor • Schedule of IFC drawings determines the project schedule and predicted cash burn • Management of Change • Attention to detail & very rigorous shop inspection • Constructability • Logistics and Transport • Difficulty of the Transportation Corridor • Close communication between Shop Coordinators, Field Supervisors, and Transport Contractor • $/km contract for transport • Flexibility of field contracting strategy

  19. Project Execution • Field Construction • Under this execution strategy this area presents the greatest risk for cost control • Success is highly dependent on accuracy of engineering contractor – stuff has to fit • Primary Mechanical Contractor on hourly • Secondary Mechancial Contractor on hourly • Typical to go lump sum of E&I • Flexibility for Field Supervisors • System in place to closely monitor Cash Burn vs Productivity.

  20. Specific TechniquesTight Spooling

  21. Specific TechniquesPipe Modules

  22. Specific TechniquesPouring Pod I Tank Base

  23. Specific TechniquesAlgar - Pile Supported Steel Tank Floors

  24. Specific TechniquesPod I Grade Beam, Floor, Supports, & Mod Installation

  25. Specific TechniquesAlgar Grade Beam / Piles

  26. Specific TechniquesAlgar Equipment Setting

  27. Closing Remarks “It’s about the People, not the process”Neal Gartner, Engineering Manager, AMEC BDROctober 2011