Duct numbering for EE-. 06.B. 07.B. 06.A. 07.A. 08.B. 08.A. 09.B. 09.A. 10.B. 10.A. 11.B. 11.A. 12.B. 12.A. 13.A. 13.B. 14.A. 14.B. 06/08/2003. Wolfgang Funk - CERN CMS. 1. View towards I.P. for EE+. View from I.P. for EE-. LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18)

Download Presentation

Duct numbering for EE-

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Duct numbering for ee

Duct numbering for EE-

06.B

07.B

06.A

07.A

08.B

08.A

09.B

09.A

10.B

10.A

11.B

11.A

12.B

12.A

13.A

13.B

14.A

14.B

06/08/2003

Wolfgang Funk - CERN CMS

1


Duct numbering for ee

View towards I.P. for EE+

View from I.P. for EE-

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

signal 2*9 (128)

CO 1*14 is (314mm**2)

CO 1*14 con (154)

N2 1*8 (51)

OF 15*4.3X2 (129)

HV 37*3 (262)

Sniff 1*6 (29)

Duct 05.A

Sum: (1528)

P F

B

ret

N2

sn

Duct 06.B

Similar to Duct 03.A

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

signal 2*9 (128)

LV 10*12.2 (1169)

CO 1*14 con (154)

Signal 2*10 (158)

Duct 05.B

P

ret

Sum: (2070)

14/23

Duct 06.A

Similar to Duct 03.B

06/08/2003

Wolfgang Funk - CERN CMS

2


Duct numbering for ee

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 4*4.3X2 (35)

signal 2*9 (128)

LV 10*12.2 (1169mm**2)

CO 1*14 con (154)

Signal 1*10 (79)

Duct 04.A

Sum: (2008)

P F

P

ret

Duct 07.B

Similar to Duct 02.A

HV 37*3 (262)

CO 1*14 is (314)

OF 15*4.3X2 (129)

LV 12*7.4 (518)

HV 2*15.3 (368)

signal 4*9 (256)

Duct 04.B

Sum: (1847)

P F

Duct 07.A

Similar to Duct 02.B

06/08/2003

Wolfgang Funk - CERN CMS

3


Duct numbering for ee

FES

F

CO 4*10 is (804mm**2)

CO 1*14 is (314)

CO 1*12 is (255)

CO 1*14 con (154)

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 4*4.3X2 (35)

signal 2*9 (128)

OF 15*4.3X2 (129)

HV 37*3 (262)

Duct 03.A

Sum: (2532)

OES

OES

BF

BF

BF

BF

R

F

Duct 08.B

Similar to Duct 05.A

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

Signal 2*9 (128)

LV 10*12.2 (1169)

CO 1*14 con (154)

Signal 2*10 (158)

Duct 03.B

Sum: (2070)

P F

P

ret

Duct 08.A

Similar to Duct 05.B

06/08/2003

Wolfgang Funk - CERN CMS

4


Duct numbering for ee

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

signal 2*9 (128)

LV 10*12.2 (1169mm**2)

CO 1*14 con (154)

Signal 1*10 (79)

DCS 1*11 (95)

DCS 1*7.2 (41)

DCS 1*5.8 (26)

Duct 02.A

Sum: (2153)

P F

P

ret

Duct 09.B

Similar to Duct 04.A

CO 2*14 is (628)

Laser 1*10 (79)

OF 15*4.3X2 (129)

MEM 12*2.2 (46)

MEM 2*1.5X2 (6)

HV 37*3 (262)

LV 12*7.4 (518)

HV 2*15.3 (368)

OF 4*4.3X2 (36)

signal 4*9 (256)

Duct 02.B

Sum: (2328)

P F

P F

Duct 09.A

Similar to Duct 04.B

Note: additional cables between MEM and balconies: LV 4*5 (88), Ving 1*5 (22), OF 2*4.3X2 (128)

MEM cables (MEM 12*2.2 (46) and MEM 2*1.5X2 (6) are only between MEM and Dees

Sum: (2514)

06/08/2003

Wolfgang Funk - CERN CMS

5


Duct numbering for ee

CO 1*71 (3960)

CO 1*14 (154)

Duct 01.A

B

ret

ret

Duct 10.B

06/08/2003

Wolfgang Funk - CERN CMS

6


Duct numbering for ee

CO 1*71 (3960)

CO 1*14 (154)

Duct 01.B

B

ret

ret

Duct 10.A

06/08/2003

Wolfgang Funk - CERN CMS

7


Duct numbering for ee

LV 12*7.4 (518)

HV 2*15.3 (368)

OF 4*4.3X2 (36)

signal 4*9 (256)

CO 2*14 is (628)

HV 37*3 (262)

OF 15*4.3X2 (129)

Duct 18.A

Sum: (2197)

P F

P F

Duct 11.B

Similar to Duct 16.A

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

signal 2*9 (128)

LV 10*12.2 (1169mm**2)

CO 1*14 con (154)

Signal 1*10 (79)

DCS 1*11 (95)

DCS 1*7.2 (41)

DCS 1*5.8 (26)

Duct 18.B

Sum: (2153)

P F

P

ret

Duct 11.A

Similar to Duct 16.B

06/08/2003

Wolfgang Funk - CERN CMS

8


Duct numbering for ee

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 2*4.3X2 (18)

Signal 2*9 (128)

LV 10*12.2 (1169)

CO 1*14 con (154)

Signal 2*10 (158)

Duct 17.A

Sum: (2070)

P F

P

ret

Duct 12.B

Similar to Duct 15.A

CO 4*10 is (804mm**2)

CO 1*14 is (314)

CO 1*12 con (113)

CO 1*14 con (154)

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 4*4.3X2 (35)

signal 2*9 (128)

OF 15*4.3X2 (129)

HV 37*3 (262)

Duct 17.B

OES

Sum: (2382)

OES

FES

R

BF

BF

BF

R

BF

F

Duct 12.A

Similar to Duct 15.B

06/08/2003

Wolfgang Funk - CERN CMS

9


Duct numbering for ee

HV 37*3 (262)

CO 1*14 is (314)

OF 15*4.3X2 (129)

LV 12*7.4 (518)

HV 2*15.3 (368)

signal 4*9 (256)

Duct 16.A

Sum: (1847)

P F

Duct 13.B

Similar to Duct 18.A

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 4*4.3X2 (35)

signal 2*9 (128)

LV 10*12.2 (1169mm**2)

CO 1*14 con (154)

Signal 1*10 (79)

Duct 16.B

Sum: (2008)

P F

P

ret

Duct 13.A

Similar to Duct 18.B

06/08/2003

Wolfgang Funk - CERN CMS

10


Duct numbering for ee

LV 6*7.4 (259)

OF 2*4.3X2 (18)

signal 2*9 (128)

LV 10*12.2 (1169)

CO 1*14 con (154)

Signal 2*10 (158)

Duct 15.A

P

ret

Sum: (1886)

14/23

Duct 14.B

Similar to Duct 17.A

LV 6*7.4 (259)

HV 1*15.3 (184)

OF 1*4.3X2 (18)

signal 2*9 (128)

HV 37*3 (262)

OF 15*4.3X2 (129)

Sniff 1*6 (29)

CO 1*14 is (314mm**2)

CO 1*14 con (154)

N2 1*8 (51)

LV 4*7.4 (172)

N2/sniff 1*12 (113)

Duct 15.B

Sum: (1813)

P F

B

ret

N2

sn

N2

Duct 14.A

Similar to Duct 17.B

Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter)

06/08/2003

Wolfgang Funk - CERN CMS

11


Duct numbering for ee

History

New version 14/7/03 to avoid crossing of services at EE patch panel area according to

Justin’s proposal of patch panel design of spring ’03:

  • move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes).

  • Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over ring flange bean.

  • Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings.

  • Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings.

  • Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in 9B-/11A-, no overall cross section increase.

New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony:

  • 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- .

06/08/2003