First Integration Tests. Jovan Mitrevski, John Parsons Nevis Labs, Columbia University August 21/2003 on July 30/31, we successfully performed first phase of Integration Tests of new L1CAL trigger at FNAL VMESCL board was successfully installed and integrated

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' First Integration Tests' - cain


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
first integration tests
First Integration Tests

Jovan Mitrevski, John Parsons

Nevis Labs, Columbia University

August 21/2003

  • on July 30/31, we successfully performed first phase of Integration Tests of new L1CAL trigger at FNAL
    • VMESCL board was successfully installed and integrated
  • thanks to Dan for his support before and during the tests
integration tasks
Integration Tasks
  • Infrastructure installation on platform next to MCH
    • Installed rack with 9U (TAB) and 6U (ADC/FIR) VME crates
    • Installed Linux-based PC for DAQ, and Windows-based PC for firmware development
    • Installed Bit3 VME card in 9U crate
    • Installed VMESCL card in 9U crate
    • Installed SCL Receiver daughtercard on VMESCL card
  • “Offline tests” (using CLK from VMESCL on-board oscillator)
    • Verified can reset VME bus
    • Verified communication with VMESCL card
      • Read VMESCL status register
      • Write/read VMESCL scratch registers
      • Switch between Offline and Online modes
integration tasks cont d
Integration Tasks (cont’d)
  • Online tests
    • Verified proper reception and locking onto SCL CLK in Online mode
    • Verified proper reception and response to SCL signals:

1. Initialization

      • SCL INIT recognized and sent on to TABS (checked with scope since TAB was not installed)
      • VMESCL local bunch crossing counter properly reset by first Turn signal after INIT, and then counts in agreement with lower bits of SCL BCID

2. Triggering

      • L1Periods and L1Accepts recognized
      • L1 trigger properly sent on to TABS for (L1Period AND L1Accept)
  • After successful completion of tests, Bit3 + VMESCL were sent back to Nevis
    • Will need to be re-installed for next stage of integration tests, including one TAB