First Integration Tests. Jovan Mitrevski, John Parsons Nevis Labs, Columbia University August 21/2003 on July 30/31, we successfully performed first phase of Integration Tests of new L1CAL trigger at FNAL VMESCL board was successfully installed and integrated

Download Presentation

First Integration Tests

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


First integration tests

First Integration Tests

Jovan Mitrevski, John Parsons

Nevis Labs, Columbia University

August 21/2003

  • on July 30/31, we successfully performed first phase of Integration Tests of new L1CAL trigger at FNAL

    • VMESCL board was successfully installed and integrated

  • thanks to Dan for his support before and during the tests


Integration tasks

Integration Tasks

  • Infrastructure installation on platform next to MCH

    • Installed rack with 9U (TAB) and 6U (ADC/FIR) VME crates

    • Installed Linux-based PC for DAQ, and Windows-based PC for firmware development

    • Installed Bit3 VME card in 9U crate

    • Installed VMESCL card in 9U crate

    • Installed SCL Receiver daughtercard on VMESCL card

  • “Offline tests” (using CLK from VMESCL on-board oscillator)

    • Verified can reset VME bus

    • Verified communication with VMESCL card

      • Read VMESCL status register

      • Write/read VMESCL scratch registers

      • Switch between Offline and Online modes


Integration tasks cont d

Integration Tasks (cont’d)

  • Online tests

    • Verified proper reception and locking onto SCL CLK in Online mode

    • Verified proper reception and response to SCL signals:

      1. Initialization

      • SCL INIT recognized and sent on to TABS (checked with scope since TAB was not installed)

      • VMESCL local bunch crossing counter properly reset by first Turn signal after INIT, and then counts in agreement with lower bits of SCL BCID

        2. Triggering

      • L1Periods and L1Accepts recognized

      • L1 trigger properly sent on to TABS for (L1Period AND L1Accept)

  • After successful completion of tests, Bit3 + VMESCL were sent back to Nevis

    • Will need to be re-installed for next stage of integration tests, including one TAB