Rhic ps update 1 21 14
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

RHIC PS UPDATE 1/21/14 PowerPoint PPT Presentation


  • 43 Views
  • Uploaded on
  • Presentation posted in: General

RHIC PS UPDATE 1/21/14. NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON.

Download Presentation

RHIC PS UPDATE 1/21/14

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Rhic ps update 1 21 14

RHIC PS UPDATE 1/21/14

NESTED IR PS HI-POTS COMPLETE

NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES

UNLOCKING NESTED IR PS’S THIS WEEK

77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS

10K MAIN RING HI-POT

7.5K LOW CURRENT PS TESTING BEGINS

4.5K 24 HR SOAK MAIN PS TURNS ON


  • Login