Design Protocols and Risk Management in Complex Projects with Applications to Water Desalination, Clean Water and Clean Energy Systems. MIT KFUPM. (PI) Prof. Warren Seering. Prof. David Wallace. Prof. Maria Yang. Dr. Victor Tang. Dr. Josef Oehmen. (PI) Prof. Abdel-Salam M. Eleiche (ME).

burian
Download Presentation

KFUPM, January 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design Protocols and Risk Management in Complex Projects with Applications to Water Desalination, Clean Water and Clean Energy Systems MIT KFUPM (PI) Prof. Warren Seering Prof. David Wallace Prof. Maria Yang Dr. Victor Tang Dr. Josef Oehmen (PI) Prof. Abdel-Salam M. Eleiche (ME) Prof. Anwar Khalil Sheikh (ME) Prof. Iyad Talal Alzaharnah (ME) Prof. Abdulaziz Bazoune (ME) Prof. Mohammed Ben Daya (SE) Prof. Muhammad Fahad Al-Salamah (SE) KFUPM, January 2010 Massachusetts Institute of Technology

  2. Background and Motivation Background Engineering design transforms customer needs into physical products or systems If product or system requires more than a few people to develop, structured processes should be used to orchestrate work Large body of research on processes, but in practice, projects laden with inefficiencies Key decisions made during early phase of system development Mistakes very costly Ricoh: $35 problem in early phase = $17,000 in mfg = $690,000 at customer (Hamada 96) Few risk management methods for early phase of product development Motivation Provide framework for utilizing existing and new knowledge bases and methods of design and risk reduction in the domain of clean water and clean energy

  3. Project initiatives Risk Management Design Requirements Technology Readiness Research areas Links to other KFUPM-MIT Projects Educational Impact – Risk Mgmt Laboratory Education Integration with Saudi Industry Partners Outreach

  4. Activities to date Identification of project initiatives Development of a project Wiki (CMS) on the Internet Five videoconferences from October to December 2009 Visit by Dr. Josef Oehmen of MIT to KFUPM on 7-18 December 2009 Seminars by Dr. Oehmen to ME and SE Depts Round-table discussions with three SA Industry partners on 10 January 2010

  5. Risk Management in Product Design and Development (PDD)

  6. Risk Management in Product Design and Development Collaboration with suppliers Product distribution Early stage design Sales and marketing Production ramp up Risk • Goal • Understanding overall risk in the value chain through factors that can be addressed in PDD • Project areas • Considering balancing risks in a portfolio of product development projects • Improving risk management in PD to reduce risk in down stream processes

  7. Current work: Literature review • Focus in the areas of • Risk management in single product design projects • Risk management of product design project portfolios • Integrated risk management across different engineering domains (e.g. PD, production, and service) • ~ 50 papers and books reviewed so far

  8. Summary of Conclusions and Research Gap • Findings from literature • No design process framework and corresponding methods for risk management in PD • No comprehensive methods for different phases of risk management process • New ISO31000 important in developing risk management reference processes • Observations for research • Product development managers have to manage portfolios of PD projects, but no structured approaches • The integration of risk management and product development practices remains an important and not sufficiently investigated field of research

  9. Design requirements

  10. Design Requirements • Design requirements balance vision of stakeholders (users, development team, regulators…). • Shared understanding of product goals • Examples • “The plant must operate under wind speeds of X kmh” • “The laptop must operate after a drop of Y meters” • Good design requirements difficult to create • Integration of customer/market needs with engineering considerations • Limited methodologies • Research areas • Process of formulating design requirements • Categories of risks in requirements • Changes in requirements over time

  11. Strategies for generating design requirements • Elements of design requirements • Customer and user needs, market data • Engineering characteristics • Informal strategies (interviews, surveys) or structured (QFD) • Different practices at different companies • Research goals: • Literature review and observations of design requirements in industry/case studies • Categorization of strategies for design requirement generation • Metrics for design requirement “completeness” • Controlled studies of design teams generating design requirements

  12. Understanding risk in design requirements • Ways to specify risks in design requirements? • Risks inherent in any design requirement • Risk of defining a requirement incorrectly • Risk of omitting a design requirement • Risk of not meeting the requirement • Interactions among risks • Others… • Which are important to evaluate? • Research goals: • Define categories of risk in design requirement specification • Evaluate design requirements and risks generated in industrial settings • Controlled studies of design teams generating design requirements

  13. Knowledge about the design 100% Design freedom Time Flexibility in specifying design requirements • Design requirements often change over time • New information during development • Ideal: design team maintains shared understanding during changes • What does “flexibility” in design requirements look like? • Set-based design (Ward, et al 90) • Research goals • Track how design requirements change over time • Industry settings • Laboratory environment • Metrics for “flexibility” in design requirements

  14. Technology readiness levels

  15. Technology Readiness Levels: • What is it? Origin? Generic uses? • The Original Model/Use Description. • Other Models/Applications. • Our objectives? NASA’s TRL Scale www.wikipedia.com

  16. The TRL: Origin/Primary Purpose/Uses Definition • They are a scale that describes the maturity of a technology with respect to a particular use- Scale from 1 (least mature) to 9 (most mature). • NASA developed (in early 1990s) a new standard: the Technology Readiness Level or TRL to assess the maturity of evolving technologies (especially related to the sustainable energy technologies). Origin Primary Purpose • To help engineers, technology development managers, and researchers make decisions concerning the development and transition of technology.:

  17. Original Model/Use Description A Classical Model for a Technology Product; the Development Generally Includes Following Successive Stages NASA’s Description: TRLs represent a systematic metric/measurement system that supports assessments of the maturity of a particular technology and the consistent comparison of maturity between different types of technology. ‘basic’ research TRL 1 Basic principles observed and reported Focused Technology Development The Traditional NASA TRL Levels Technology Development & Demonstration TRL 9 Actual system “flight proven” through successful mission operations System Development Reference: John C. Mankins (Advanced Concepts Office of Space Access and Technology NASA)

  18. Other Articulated Models YES The U.S. Department of Defense (DOD) Model Viability Requirements Description Verification TRL (N) TRL (N-1) NO The U.S. Department of Energy (DOE) Model • Technology Readiness Assessment (TRA) model, which consists of three sequential steps: • - Identifying the Critical Technology Elements (CTEs). • - Assessing the Technology Readiness Level (TRL). • [as an intermediate stage in the technology development process] • - Developing a Technology Maturation Plan (TMP). The European Space Agency Model “Generic Technology Readiness Assessment Steps”

  19. The Technology Readiness Level Initiative • Objectives:: • Developing an understanding through implementing on ongoing selected projects (A preliminary questionnaire has been developed-It has been implemented on some of the ongoing projects from MIT side). • Developing strategic next steps that might be taken to advance the technology’s readiness, and/or mitigate technology readiness risks. • The recommendation for advancing technology readiness can be further enhanced by incorporating proven methods for product requirement specification and risk management in product development. Published Applications in Technical (technology) Research • FUSION ENERGY • Plasma and Power Flow in a Reactor • NEXT Ion Propulsion System, LeGresley et al 2000

  20. Collaboration with other KFUPM researchers • Preliminary evaluation of metric with two KFUPM-MIT faculty on their projects • Initial TRL metric adapted from NASA • Prof. Evelyn Wang • Prof. Rohit Karnik • Initial findings • Different aspects of the same technology may have different TRL levels • Define the end goal of doing the TRL metric

  21. Education : The Quality, Reliability and Risk Management Lab Goals : To establish a state of the art Quality, Reliability and Risk Management lab at KFUPM To develop educational modules in the areas of quality, reliability, and maintenance, manufacturing, and risk management. Objectives of the lab : Provide state-of-the-art extensive suite of quality, reliability and risk management software, research documentation and expertise to support the research project Enhance the capacity of KFUPM researchers to help their industrial partners and potential clients in terms of quality, reliability and risk management in product development and allied areas in operations of products and systems.

  22. Education: The Quality, Reliability and Risk Management Lab Objectives, cont Support teaching activities involving ME and SE departments with respect to relevant courses and industrial training programs Support teaching activities by providing tools to enhance existing and new courses at both ME and SE departments in the area of quality, reliability, manufacturing and maintenance and industrial training programs ‘ Develop several teaching (learning) modules, that can benefit from the research outcomes of the project and are within the scope of proposed lab Develop two training modules (or short courses) for industrial partners in the area of quality, reliability and risk management in product development and operations management

  23. Engaging Saudi Industrial Partners Understand project initiatives in context of real world problems The success of most is driven by product innovation, adaptation, and customization Representatives of Aramco R&D Center, SABIC and Al-Zamil Group attended the January 10, 2010 Industry Round Table Meeting and met with the KFUPM-MIT team Preparing for a Workshop with potential Industrial Partners to be held in March or April

  24. KFUPM-MIT Engineering Design Roundtable January 10, 2010

  25. Thank you!