Distributed Generation Penetration Patterns

Distributed Generation Penetration Patterns Connor Anderson, ERCOT Engineering Development Program Paul Wattles, ERCOT Market Design & Development DREAM TF December 14, 2015. DERs and Grid Reliability.

btowle
Download Presentation

Distributed Generation Penetration Patterns

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Distributed Generation Penetration Patterns Connor Anderson, ERCOT Engineering Development Program Paul Wattles, ERCOT Market Design & Development DREAM TF December 14, 2015

  2. DERs and Grid Reliability • ERCOT has proposed that TDSPs map all DERs to their appropriate Transmission Load point on the ERCOT Common Information Model (CIM Load) • See DER Concept Paper, pgs. 20-21, 8/20/15 DREAM TF • This mapping will be necessary to support several of the ISO’s reliability functions • Steady State analysis • Dynamics study cases • NERC Annual Load Data Request • Potentially (down the road), load forecasting • This mapping will require putting processes in place that don’t currently exist • Based on dialogue with TDSPs, in most cases the data exists, just not the process for organizing and transmitting

  3. DERs and Grid Reliability • ERCOT acknowledges the challenge of putting a mapping system in place and has committed to making the case for the reliability needs • Today’s presentation is the first step in making that case • This is not an urgent issue at this time • We have time to work this out and get it right

  4. The ‘Clumpiness’ Issue • Premise: DER adoption tends to occur unevenly – that is, clustered in specific areas and neighborhoods • Concentrations of DG could eventually impact the transmission system • The following slides provide an early view of DG interconnection and penetration trends in ERCOT FOLLOWING DATA CONSISTS OF: • Registered DG in both competitive and NOIE areas, as provided via ERCOT Registration data • Unregistered DG in competitive choice areas only, as derived from TDSP-supplied data for Load Profile code updates • Does not include unregistered DG in NOIE areas

  5. Registered and Unregistered Total DG: Number of Installations Registered: 71 Unregistered: 7118 Total: 7,189

  6. Registered and Unregistered Total DG Capacity Registered: 496.4 MW (Incl. registered NOIE : 92.7 MW) Unregistered: 56.9 MW Total: 553.3 MW

  7. Registered and Unregistered PV: Number of Installations (6702 total) Registered: 9 Unregistered: 6693 Total: 6,702

  8. Registered and Unregistered PV Capacity Registered: 57.12 MW (Incl. registered NOIE : 55.12 MW) Unregistered: 50.10 MW Total: 107.22 MW

  9. Central Texas Unregistered and Registered DG: No. of Installations Coryell Falls Lampasas Bell San Saba Burnet Williamson Llano Milam Burleson Travis Lee Blanco Bastrop Hays

  10. Central Texas Unregistered and Registered DG: Capacity in kW Coryell Falls Lampasas Bell San Saba Burnet Williamson Llano Milam Burleson Travis Lee Blanco Bastrop Hays

  11. Central Texas Unregistered and Registered PV: No. of Installations Coryell Falls Lampasas Bell San Saba Burnet Williamson Llano Milam Burleson Travis Lee Blanco Bastrop Hays

  12. Central Texas Unregistered and Registered PV: Capacity in kW Coryell Falls Lampasas Bell San Saba Burnet Williamson Llano Milam Burleson Travis Lee Blanco Bastrop Hays

  13. (Unregistered and Registered) Totals: 4280 substations* 7189 DG installations * This number represents all substations in ERCOT, including substations with no Loads and substations with only Load Resources or ‘non-conforming’ Loads.

  14. (Unregistered and Registered) Totals: 948 substations 7189 DG installations

  15. (Unregistered and Registered) Totals: 4280 substations 553.3 MW of DG

  16. (Unregistered and Registered) Totals: 920 substations 553.3 MW of DG

  17. (Unregistered and Registered) Totals: 948 substations 5656 CIM loads

  18. Totals: 4280 substations 7118 DG installations

  19. Totals: 915 substations 7118 DG installations

  20. Totals: 4280 substations 56.9 MW of DG

  21. Totals: 886 substations 56.9 MW of DG

  22. Totals: 915 substations 1906 CIM loads

  23. Totals: 4280 substations 71 DG installations

  24. Totals: 64 substations 71 DG installations

  25. Totals: 4280 substations 496.4 MW of DG

  26. Totals: 64 substations 496.4 MW of DG

  27. Totals: 64 substations 162 CIM loads

  28. Questions paul.wattles@ercot.com (512) 248-6578 connor.anderson@ercot.com (512) 248-6549