David Grant Chuck Askin Carl Craft Taylor Frith. Geoff Weller Nhu Nguy David Graham. Gridlock Avoidance System (G.A.S.). Project Overview. Gridlock Avoidance System (G.A.S.) ODU CS 410/411 presented by David Grant PM. Project Goal.

Download Presentation

Gridlock Avoidance System (G.A.S.)

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Gridlock avoidance system g a s

David Grant

Chuck Askin

Carl Craft

Taylor Frith

Geoff Weller

Nhu Nguy

David Graham

Gridlock Avoidance System (G.A.S.)


Project overview

Project Overview

Gridlock Avoidance System (G.A.S.)

ODU CS 410/411

presented by David Grant PM


Project goal

Project Goal

  • Our main goal is to develop a computer-based simulation model to mimic the behavior of the Hampton Roads Interstate System south of the Mercury Blvd. Interchange to the Battlefield Blvd. Interchange.


Project sub goals

Project Sub-goals

  • We intend to provide city planners and transportation professionals with results that describe their system’s operations at current and modified vehicle flow rates in two formats: statistical and graphical.

  • This tool is necessary to support the interstate highway system in Hampton Roads which is a critical element to the infrastructure of society in the area.


Project sub goals cont

Project Sub-goals (cont.)

  • Demonstration simulation of a small segment of the Hampton Roads interstate system for project validation and verification.

  • Market the project on a consultant basis (what ifs).

  • Completion by the end of the calendar year 2001

  • Y2K compliant software and hardware


Competitive analysis

Competitive Analysis

  • Competitors

    • Other Traffic Simulation products

  • Strengths

    • Currently not being used by the local governments or VDOT

  • Weaknesses

    • Data must be in a usable format

    • Different localities maintain their data differently


General approach

General Approach


Contractual aspects

CS 250

Collect and format data for input

CS 300u

Survey of real-life traffic patterns

Marketing research (purse strings)

Contractual Aspects


Schedules

Schedules

  • Fall Semester 1998

  • Spring Semester 1999

  • Implementation and Completion Phase


Fall semester 1998

Fall Semester 1998


Fall semester 1998 cont

Fall Semester 1998 (cont.)


Spring semester 1999

Spring Semester 1999


Implementation and completion

Implementation and Completion


Resources

Resources

  • Personnel

  • Office

  • Equipment


Personnel annual costs

Faculty Advisor

12 Graduate students working 20 hr. @ $15 per hr.

$ 46,000

$180,000

Personnel (annual costs)


Office annual costs

Office Space ($1500 per month)

Office Furniture ($500 per month)

Office Supplies and Utilities ($600 per month)

$ 18,000

$ 6,000

$ 7,200

Office (annual costs)


Equipment purchase costs

Gateway E-5200 Computers (6)

Lexmark OPTRA 3455 network printer

HP OfficeJet Pro 1175C all-in-one

Statistical Software Package

$ 15,600

$ 2,600

$ 1,000

$ 200

Equipment (purchase costs)


Equipment purchase costs cont

HP DesignJet 2500C Plotter

IBM Fast Ethernet LAN Switch 1100

Simulator Engine (several single purchase to evaluate)

$ 9,400

$ 1,900

$ 4,300

Equipment (purchase costs cont.)


Project total costs

Personnel

Office

Equipment

ODU Research Foundation

Total Project Cost

$ 565,000

$ 78,000

$ 35,000

$ 340,000

$1,018,000

Project Total Costs


Evaluation methods

Evaluation Methods

  • During Fall Semester 1998 and Spring Semester 1999, there will be regular status and brainstorming session of the group and sub-groups.

  • During the implementation and Completion phase we will use accepted SEI standards (formal and one-on-one peer reviews, Test Readiness Reviews, Team Advisory Groups for customer acceptance).


Potential problems

Potential Problems

  • Not possible to model current/historical traffic

  • Not possible to complete in time

  • Inadequate or unavailable data

  • Too expensive

  • No buyers

  • Already on market

  • Spending cutback


Bibliography

Bibliography

  • Experts:- Dr. Leathrum (ECE)- Dr. Overstreet (CS)- Mr. Dennis Watson (VDOT)